    Disclaimer The purpose of this presentation is to provide general information about Dragon Mining Limited (the "Company"). Unless otherwise stated herein, the information in this presentation is based on the Company Company's s own information and estimates. estimates This presentation does not cons

  3. Slide 3: Scandinavian Gold Producer

    Scandinavian Gold Producer Svartliden Gold Mine (80%) • 40,000 ounces • Cash cost US$550 Vammala Production Centre • 30,000 ounces • Cash cost US$650 Growing Pipeline of Opportunities • Kuusamo uusa o Go Goldd Project oject Strong Financial Position (30 Sep 10) • $$28.3m of liquid q assets • No debt

  4. Slide 4: Corporate Overview

    Corporate p Overview Issued Capital 6 Month Share Price 0.2 • Ordinary Shares 737.8m • Options (14c – 21c) 10.2m 0.15 • Market Cap A$122m AUD Substantial Shareholders 0.1 • Nicolas Mathys 17.7% • Eurogold 17.3% 0.05 Apr‐10 May‐10 Jun‐10 Jul‐10 Aug‐10 Sep‐10 Oct‐10 Date Australian Securities Exchange

  5. Slide 5: Corporate Overview – Directors

    Corporate p Overview Directors Peter Cordin Tapani Järvinen Executive Chairman Non-Executive Director Mr Cordin is a civil engineer with more than 35 years Mr Järvinen retired is currently a Board member of a number of experience in the evaluation, development and operation of Finnish companies incl

  6. Slide 6: Svartliden Gold Mine – Location

    Svartliden Gold Mine Location Production, Cashflow, Growth

  7. Slide 7: Svartliden Gold Mine – Statistics to September 2010

    Svartliden Gold Mine Statistics to 30 September 2010 Project to Date YTD September 2010 Ore Processed 1,741,356 t 253,688 t A Average Head H dG Grade d 4 80 g/t 4.80 /t 4 34 g/t 4.34 /t Average Recovery 90.67 % 91.84 % Gold Produced 243,436 oz 32,533 oz • September YTD 2010 Cash Cost US$544 • Septem

  8. Slide 8: Svartliden Gold Mine – Mining and Loading

    Svartliden Gold Mine Mining and Loading May 08 Aug 07

  9. Slide 9: Svartliden Gold Mine – Open Pit

    Svartliden Gold Mine Open Pit Apr 08 Oct 09

  10. Slide 10: Svartliden Gold Mine – Tailings Dam

    Svartliden Gold Mine Tailings Dam Jan 08 Oct 09

  11. Slide 11: Svartliden Gold Mine – Transitioning Underground in 2011

    Svartliden Gold Mine Transitioning Underground in 2011 Aug 08 Jan 09

  12. Slide 12: Svartliden Gold Mine – Transitioning Underground in 2011

    Svartliden Gold Mine Transitioning Underground in 2011

  13. Slide 13: Svartliden Gold Mine – Increase Mine Life

    Svartliden Gold Mine Increase Mine Life Aggressive drilling program for additional 250,000 oz

  14. Slide 14: Svartliden Gold Mine – Growth Opportunities

    Svartliden Gold Mine Growth Opportunities • Potential to host a number of gold deposits • Extensive coverage by detailed airborne geophysics and regional geochemistry, identifying >30 areas of interest • Detailed geochemistry across four high priority prospects returned very encouraging results

  15. Slide 15: Southern Finland – Location

    Southern Finland Location Production, Cashflow, Growth

  16. Slide 16: Vammala Production Centre

    Vammala Production Centre Statistics to 30 September 2010 Project to Date YTD September 2010 Ore Processed 619,832 t 182,088 t A Average Head H dG Grade d 5 72 g/t 5.72 /t 4 90 g/t 4.90 /t Average Recovery 83.42 % 83.90 % Gold Produced 94,984 oz 24,125 oz • September YTD 2010 Cash Cost US$676 • Sept

  17. Slide 17: Orivesi Gold Mine – Extending Mine Life

    Orivesi Gold Mine Extending Mine Life

  18. Slide 18: Jokisivu Gold Mine – Extending Mine Life

    Jokisivu Gold Mine Extending Mine Life

  19. Slide 19: Jokisivu Gold Mine – Mining

    Ka Jokisivu Gold Mine Mining La LEGEND © Squirrel! Reservation Area CI Jokisivu Mining Lease Outline © Open Pit Outline e@ 2009 Diamond Core Drill Hole @ 2010 Diamond Circulation Drill Hole 3m @ 5.20 g/t Au / 2 1.3m @ 5.42 git Au HU/JS-RC82 3m @ 2.36 git Au / “SN 3.0m @ 2.65 git Au TEM per-erceyn HU

  20. Slide 20: Orivesi Gold Mine – Ore Loading for Transport to Vammala

    Orivesi Gold Mine Ore Loading for Transport to Vammala Aug 07

  21. Slide 21: Jokisivu Gold Mine – Decline Portal Commenced

    Jokisivu Gold Mine Decline Portal Commenced

  22. Slide 22: Vammala Production Centre – Crushing Circuit

    Vammala Production Centre Crushing Circuit

  23. Slide 23: Kaapelinkulma Gold Project

    Kaapelinkulma p Gold Project j Production Growth • New resource imminent from 4,200m of infill drilling • Permitting progressing • Production in 2012.

  24. Slide 24: Kuusamo – Next Production Centre

    Kuusamo Next Production Centre • Bonanza historical drill results from Juomasuo including: – 19.20m @ 179.52 g/t – 3 70m @ 426 3.70m 426.98 98 g/t – 19.60m @ 63.70 g/t – 4.12m @ 265.50 g/t – 8.00m @ 48.85 g/t • Resources of 178,800 ounces • 3 year aggressive exploration program to significantly incr

  25. Slide 25: Kuusamo – Drill Section

    Beoe Drill Hole On Section Drill Hole Off Section Proposed Drill Holes. Gold Mineralised Zone 9,800 mN 9,800 mE 250 mRL 8.30m @ 2.76 git Au 4.12m @ 265.5 git Au 2.20m @ 11.10 g/t Au 6.60m @ 11.33 git Au 7.20m @ 3.46 g/t Au XN 9.83m @ 5.84 g/t Au 7.03m @ 24.17 g/t Au | 150 met 19.2m @ 179.52 g/t Au 2

  26. Slide 26: Production Project Pipeline

    Production Project j Pipeline p

  27. Slide 27: Scandinavia

    Scandinavia • Supportive Fiscal Regime  No mining royalties  Low corporate tax rate – Sweden – 26.3% – Finland – 26.0% • Currently no tax on repatriation of funds to Australia • Low country risk

  28. Slide 28: DRA – 40 Percent Interest

    DRA – 40 Percent Interest • Substantial JORC compliant resource of chromium, iron and nickel • Located in emerging Mid West Region of WA near established infrastructure • Scoping Study concluded “the Project is feasible, has attractive returns and is viable under a number of different d development

  29. Slide 29: Investment Opportunity

    Investment Opportunity pp y  Two established and highly profitable production centres  1 million ounces of resources and drilling to expand reserves  Growing 125,000 ounce gold producer 2013  Cheap compared to peers on resource/ounce valuation  Excellent near mine & regional g exploration p p p

  30. Slide 30: Appendices – Gold Resource Inventory

    Appendices Gold Resource Inventory (31 Aug 10) Project j Tonnes Gold (g (g/t)) Gold ((ounces)) SVARTLIDEN Measured 288,000 4.1 38,100 Indicated 917,000 3.8 110,800 Inferred 152,000 3.8 18,600 Total 1,357,000 3.8 167,500 VAMMALA Measured 206,000 7.2 47,900 Indicated 1,302,600 5.4 227,800 Inferred 1,6

Dragon Mining — Investor Presentation (October 2010) on 6ix