Orezone Gold Corporation · TSX:ORE
Orezone Gold — Q3 2026 Earnings Presentation
15 slides from Orezone Gold's earnings presentation, November 2026
Slide 1: An Emerging Mid-Tier Producer: Q3 2026 Earnings Conference Call
rsonal use only AN EMERGING Mid-Tier Producer Q3 2026 Earnings Conference Call TSX/ASX ORE and Webcast OTCQX ORZCF All dollar amounts are in USD unless Monday, November 16, 2026 otherwise stated
Slide 2: Important Notices and Disclaimer
IMPORTANT NOTICES AND DISCLAIMER Investor Presentation Actual results may differ materially from those expressed or implied by forward-looking statements. Material risks include: This investor presentation is dated November 16, 2026, and has been prepared by Orezone Gold Corporation (“Orezone” or un
Slide 3: Important Notices and Disclaimer
IMPORTANT NOTICES AND DISCLAIMER Not an Offer nor Investment Advice Qualified Persons This presentation is not an offer, invitation, solicitation or other recommendation with respect to the subscription Mr. Rob Henderson, P. Eng., VP Technical Services, Mr. Dale Tweed, P. Eng., VP Engineering, Mr. J
Slide 4: Third Quarter at a Glance
THIRD QUARTER AT A GLANCE rsonal use only RECORD PRODUCTION AISC ADJUSTED EBITDA NET INCOME 59,674oz $2,475/oz $112M $28M 157,029oz $2,409/oz $341M $113M 9M-2026 9M-2026 9M-2026 9M-2026 Released Casa Berardi Updated Life-of-Mine Plan in September • 14-year mine life with 1.63Moz of gold production •
Slide 5: Financial Performance
FINANCIAL PERFORMANCE Q3 Commentary • Gold sales of 56,461oz, at an average realized gold price of $4,174/oz Revenue Net Earnings2 US$M US$M rsonal use only 272 45 • AISC of $2,475/oz, in line with guidance 239 40 • Cash balance of $116.2M, bullion on hand of $31.0M (7,433oz) 186 28 • Strong financi
Slide 6: Bomboré Operating Performance
BOMBORÉ OPERATING PERFORMANCE Q3 Commentary • Gold production of 40,562oz at an AISC of 2,246/oz sold Production AISC ounces $/oz rsonal use only 40,562 • Strong mining performance, with tonnes mined exceeding plan 37,563 38,063 2,245 2,278 2,246 • Hard rock mining at P17 focused on waste stripping,
Slide 7: Casa Berardi Operating Performance
CASA BERARDI OPERATING PERFORMANCE Q3 Commentary • Gold production of 19,122oz at an AISC of 2,794/oz sold Production AISC ounces $/oz rsonal use only 2,794 • Achieved target production despite 7-day shutdown due to wildfire activity 2,558 20,503 19,112 • Mill throughput averaged 4,195tpd vs annual
Slide 8: 2026 Production and Cost Guidance
2026 PRODUCTION AND COST GUIDANCE FY-2026 9M-2026 Guidance Outlook Consolidated Guidance Actuals • On target to achieve 2026 production and cost guidance rsonal use only Gold Production oz 222,000 - 247,000 157,029 AISC1,2,3 $/oz $2,200 - $2,400 $2,409 • Bomboré Operations • Production forecasted to
Slide 9: Casa Berardi Life-of-Mine Highlights
CASA BERARDI LIFE-OF-MINE HIGHLIGHTS Long-life production profile underpinned by the restart of higher- rsonal use only grade underground mining, with significant exploration upside LIFE OF MINE PRODUCTION AISC 14 Years 116 koz/yr $1,877/oz 1.63Moz of total gold production Life-of-Mine Average Life-
Slide 10: Casa Berardi Enhancement Opportunities
CASA BERARDI ENHANCEMENT OPPORTUNITIES Increased Mill Actionable Exploration Optimization Throughput Upside rsonal use only • Open-pit grade control • 3,835 tpd: LOM assumption • Mineral resource expansion Reduce dilution and improve Open for expansion on multiple head grades • 4,195 tpd: Average in
Slide 11: Exploration
rsonal use only Exploration
Slide 12: Bomboré Exploration
BOMBORÉ EXPLORATION Q3 Highlight Intercepts • 2.97g/t over 34.0m (BBD1393) rsonal use only • Including 4.50g/t over 7.0m • 1.74g/t over 26.0m (BBD1437) • Including 3.33g/t over 6.0m • 4.28g/t over 11.0m (BBD1393) • 8.34g/t over 6.0m (BBD1418) • 1.26g/t over 34.0m (BBD1430) • Including 5.46g/t over 2
Slide 13: Casa Berardi Exploration
CASA BERARDI EXPLORATION YTD Highlight Intercepts • 6.47g/t over 21.5m (CBF-160-233) rsonal use only • Including 8.94g/t over 12.7m • 7.20g/t over 14.9m (CBF-134-125) • Including 16.18g/t over 3.4m • 16.10g/t over 6.7m (BCBF-160-230) • 5.51g/t over 18.0m (CBF-160-232) • Including 9.33g/t over 3.5m •
Slide 14: Upcoming Catalysts
UPCOMING CATALYSTS UPCOMING CATALYSTS Orezone Production Outlook rsonal use only (100% Basis) >350koz Exploration Results Heva-Hosco PEA from Bomboré and Expected in Q4-2026 Casa Berardi 12 drill rigs in operation 222-247koz across both operations 119koz 110koz Stronger Production Updated Bomboré Ex