  2. Slide 2: Cautionary Statement

    Cautionary Statement This is an oral presentation which is accompanied by slides. Investors are urged to review our SEC filings. This presentation contains certain forward-looking statements regarding various oil and gas discoveries, oil and gas exploration, development and production activities, an

  3. Slide 3: Goal: Leading North Sea Independent E&P Company

    Goal To become the leading North Sea Independent Exploration and Production Company

  4. Slide 4: Strategy

    Strategy Experienced Management + Talented, Experienced Explorationists + Extensive Regional 3D Seismic Database + Equity Incentives Shareholder Value

  5. Slide 5: Why the North Sea?

    Why the North Sea? Large Resource Potential UK: DTI estimates 16 bboe yet-to-be discovered Norway: NPD estimates 24 bboe yet-to-be discovered >250 new fields with more than 25 mmboe each to be discovered High value fields with existing and available infrastructure Effective recycling of acreage Supp

  6. Slide 6: North Sea: Substantial Exploration Potential

    North Sea Source: EIA, RBS, NPD, BP Statistics, Wood Mackenzie With Substantial Exploration Potential 2005 Results U.K. - 57 E&A Wells found 732 mmboe 1 Norway - 12 Expl. Wells found 1.0 bboe 2 Netherlands - 5 significant gas discoveries 3 (1) Hannon Westwood (2) NPD (3) TNO Norway UK Holland GOM 4.

  7. Slide 7: Technical Team

    Technical Team Geologists Geophysicists Engineers John N. Seitz Ronald A. Bain, Ph.D. Bruce H. Stover J.W. Munns David J. Griffiths Clint Smith Tord Pedersen Michael Neese Chris Hopper, Ph.D. Idar Kjorlaug David Rhodes J. Felix Acree Robert Fitzpatrick Fiona Goodfellow, Ph.D. Jan Olimstad Debbie War

  8. Slide 8: Endeavour North Sea Data

    Endeavour North Sea Data Location: Offshore UK, Norway, and The Netherlands Data Sets: • MegaSurvey (104,450 km2) • Digital Atlas • Regional structural mapping on 11 horizons • Pressure data (573 wells) • Well database (more than 1,500 wells) • Biostratigraphic database (600 wells) • 2D long offset

  9. Slide 9: Endeavour North Sea MegaSurvey Database

    Endeavour North Sea MegaSurvey Database Overlaid on Gulf of Mexico PGS MegaSurveys .. Central North Sea - 4,800 km2 Southern North Sea - 22,000 km2 Norwegian North Sea - 12,400 km2 Dutch North Sea - 15,250 km2 Total 104,450 km2 Relative to Gulf of Mexico Represents 104,450 km2 of MegaSurvey

  10. Slide 10: Talisman Transaction Overview

    Talisman Transaction Overview Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing as

  11. Slide 11: Transaction Impact

    Transaction Impact Immediate critical mass in North Sea Diversification across 10 producing fields (10,000+ boepd) Balanced exposure to oil and gas Cash flow to support an exploration drilling program of 4-8 wells per year Portfolio balanced between exploration and production Exploration fuels organ

  12. Slide 12: Sources and Uses of Funds

    Sources and Uses of Funds Sources Permanent Capital Structure Target Sources Permanent Capital Structure Target Uses Net Cash Flow From Jan. 1, 2006 ^ $40 Acquisition Price $414 Cash on Hand $14 Hedging Costs $10 Convertible Preferred Stock $125-250 Net Working Capital ^ $10 Senior Bank Facility $15

  13. Slide 13: Reinvestment of Pre Tax Cash Flow from Acquisition of Talisman Assets

    Reinvestment of Pre Tax Cash Flow from Acquisition of Talisman Assets 1 Income before income tax, after Petroleum Royalty Tax (PRT) and capital expenditures associated with the acquired assets, and after interest expense and dividends associated with acquiring the assets, assuming the capital struct

  14. Slide 14: North Sea Exploration Drilling Program

    2006 Schedule 44/12 (Cygnus) - gas discovery! 23/16f (Columbus) Endeavour Oper. (GSF 140) Pending Farm-ins - outside operators 2007 Drilling Prospects Endeavour operated 48/1a (Emu) - Southern Gas Basin 30/23b (Balgownie) - Central North Sea - UK 23/16f (Magellan) - Central Graben 31/21b (Newburgh)

  15. Slide 15: 44/12 Cygnus

    44/12-1 44/12-2 Leman Sst Carboniferous GWC -11313' NNW SSE Basin: Southern North Sea Interest: Endeavour 12.5% Reserves: FBI 170 bcf FBIIa 120 bcf FBIIb 100 bcf Well cost: £18.6 million (44/12-2) Est spud: 2007 Analogue field: Markham (230 bcf) Cygnus I IIa III IV V IIb 44/12-1 Schematic cross sect

  16. Slide 16: 23/16f Columbus

    23/16f Columbus (stratigraphic pinchout with DHI downdip from Magellan Prospect) Basin: Central Graben Interest: Endeavour 50% Reserves: 152 bcf + condensate Est. well cost: $18 million (DHC) Est. spud: 2006 Analogue field: Everest (1.2 Tcf) Everest Monan Fiddich Montrose Arbroath Howe Mungo 7/7-2 C

  17. Slide 17: 30/23b Balgownie

    30/23b Balgownie (inverted rim syncline) Basin: Central Graben Interest: Endeavour (op) 65% Reservoir: Fulmar sand Reserves: 40 mmboe Est. well cost: £12.3 million (DHC) Est. spud: 2007 Analogue field: Janice (70mmbl) NE SW BCU ROT Fulmar Acquisition completed Aug. 2006

  18. Slide 18: 48/1a Emu

    48/1a Emu (large horst block with shows in adjacent wells) Top Leman Depth m 48/1-2a Amerada 1993 Suspended with gas shows in Carboniferous. Leman Sst 10562-10867ft TVDSS. Westphalian A Low gas saturations calculated in Carboniferous sandstones. Ravenspurn Neptune Babbage Hyde West Sole Hoton Newsha

  19. Slide 19: 31/21b Newburgh

    31/21b Newburgh (downthrown fault closures at Rotliegend and Fulmar) Newburgh Base Cretaceous Depth Map (m) Basin: Central Graben Interest: Endeavour (op) 40% Reserves: 20 mmboe Est. well cost: £13.3 million (DHC) Est. spud: 2007 Analogue field: Ardmore (82 mmbl)

  20. Slide 20: Inner Moray Firth

    Inner Moray Firth (tilted fault blocks) Basin: Inner Moray Firth Interest: Endeavour (op) 33.3% Reservoir: Mid Jurassic Beatrice sandstones Upper Jurassic Volgian sandstones Reserves: 400 - 800 bcf Est. well cost: £9.1 million (DHC) Est. spud: 2007 Analogue (structural) field: Beatrice (173 mmbo) 12

  21. Slide 21: Norway Drilling Locations

    Norway Drilling Locations Agat Gorilla 5 km Grane Ringhorne Balder Aegis 250 m WD Lower Cretaceous target at ~3500 m TD at ~4200 m 60 days / $ 35 mm 150 m WD Lower Tertiary target at ~1950 m TD at ~2500 m 40 days / $ 23 mm 120 m WD Lower Tertiary target at ~1940 m TD at ~2500 m 40 days / $ 23 mm

  22. Slide 22: Aegis (PL304)

    Balder sst. Heimdal sst. Frigg Balder PL304 S N 25/10-2 25/10-7 9232 m W E 25/10-7 Aegis 25/10 Aegis Basin: Viking Graben Interest: Endeavour 40% Reservoir: Balder sandstone Reserves: 50 mmbl Est. well cost: $24 million (DHC) Est. spud: 2007 Analogue field: Balder

  23. Slide 23: Gorilla

    B 25/5 Gorilla FRIGG A A B Map A B Basin: Viking Graben Interest: Endeavour 40% Reservoir: Heindal Formation Reserves: 50 mmbl Est. well cost: $25 million (DHC) Est. spud: 2008 Analogue field: Jotun

  24. Slide 24: 35/3 Agat

    35/3 Agat Seismic line PEON AGAT AGAT W E Well 2 Well 36/1-2 Well 4 Base Agat Well 2 AGAT Base Agat N S Top Agat Fm. 35/3-1 35/3-2 35/3-4 35/3-5 35/3-6 36/1-2 5 km Basin: Northern North Sea Interest: Endeavour 49% Reservoir: Agat Formation Reserves: ~250 bcf Est. well cost: $30 million (DHC) Est. sp

  25. Slide 25: Growth in Key Metrics

    Growth in Key Metrics 2004 2005 2006 0 4 12 2004 2005 2006 0 18 35 2004 2005 2006 0 2 10 2004 2005 2006 8 20 60

  26. Slide 26: Production Profile (P1+P2)

    Production Profile (P1+P2) 2004 2005 2006 2007 2008 2009 Njord & Brage 2038 1995 1861 1715 1767 2099 2341 1370 2456 2275 2098 2116 2038 1995 1900 1861 1704 1485 1537 1537 1537 1537 1537 1537 1537 1537 1534 1534 1534 1534 1534 1534 1604 1674 1744 1814 1884 1954 2024 2095 2165 2235 2305 2375 2406 2437

  27. Slide 27: Why Endeavour?

    Why Endeavour? Growth in production and cash flow Sustainable exploration program supported by high quality producing assets Balanced portfolio Distinctive investment opportunity Only pure-play North Sea independent Experienced and accomplished team Solid base of production with significant explorat