NH3 Clean Energy Limited · ASX:NH3
NH3 Clean Energy — Hexagon Energy Materials — Corporate Update (October 2024)
18 slides from NH3 Clean Energy's corporate update, October 2024
Slide 1: Hexagon's WAH2 Project Low Emissions Ammonia Investor Briefing
Hexagon Energy Materials Ltd Hexagon’s WAH2 Project Low Emissions Ammonia Investor Briefing October 2024 © 2024 Hexagon Energy Materials Limited (ASX:HXG) © 2023 Hexagon Energy Materials Limited (ASX: HXG) 1
Slide 2: Important Notices
Important Notices DISCLAIMER The purpose of this presentation is to provide background information to assist in obtaining a general understanding of the Company’s proposals and objectives. This presentation may contain some references to forecasts, estimates, assumptions and other forward-looking st
Slide 3: Hexagon Energy Materials: ASX listed project developer
Hexagon ASX listed project developer (HXG)* Energy Competitive, low-emissions ammonia export project (WAH2), annual net CF A$244 million (100% project)1 Materials Limited Targeting substantial growth market opportunity, ~US$10 Bn pa market by 20352 Leading clean ammonia project with ideal site secur
Slide 4: Market opportunity – NH3 the hydrocarbon substitute
Market opportunity – NH3 the hydrocarbon substitute Ammonia set to play a significant role in decarbonising power generation and shipping Clean ammonia will Power Generation play an essential • Currently 1/3 of Japan’s electricity needs are met from coal-fired generation1 role in the energy • Japan
Slide 5: Increasing government support
Increasing government support Strategic investment and policy support for clean ammonia Japanese Government Australian Government Strong market pull US$60 B allocated to support Northern Australia Infrastructure Facility establishment of clean ammonia and (A$7 B)3 for clean ammonia hydrogen supply c
Slide 6: Japan's criteria for clean ammonia
Japan’s criteria for clean ammonia Australia well-placed, Hexagon best-placed Japan has specified Less than 4.2 T Detailed engineering work by Petrofac key criteria for Low CO2e /T H2e1, lower demonstrates emissions intensity of potential suppliers Emissions preferred and 1.1 T CO2e /T H2e, further
Slide 7: Project design drives competitive advantage
Project design drives competitive advantage Hexagon’s decisions have positioned WAH2 as Australia’s leading clean-ammonia project Decision Impact Outcome Substantial demand driven by decarbonisation targets with Target markets? supply required before 2030 • Long term contracts, government incentives
Slide 8: Positive macro-environment, evolving as expected
Positive macro-environment, evolving as expected Planets align for WAH2, with an increasing desire for credible supply of clean energy There is an increasing Increasing cost of competing, electrolysis-based, technologies1 need for clean energy as 2030 approaches. Increasingly technology-agnostic app
Slide 9: Project overview - Hexagon's WAH2 export plant
Project overview - Hexagon’s WAH2 export plant Low-emissions, cost competitive ammonia Natural Water The WAH2 Project uses INPUTS gas established technology to decarbonise gas and produce clean ammonia which can be used in existing infrastructure to replace coal for power PROCESS WAH2 generation, an
Slide 10: Partnering with experienced industry players
Partnering with experienced industry players Hexagon is seeking the fastest, lowest-cost, lowest-risk pathway to production Before initiating WAH2, Hexagon identified how to deliver the lowest-cost, lowest-risk and fastest path to market: Natural Gas CO2 Suppliers sequestration providers 1. Securing
Slide 11: Project site – in optimal location of Maitland SIA
Project site – in optimal location of Maitland SIA1 Proximity enables lower cost access to required services and infrastructure Hexagon’s site is a key asset, providing access to existing Existing deepwater port, infrastructure that is handles ammonia, no expansion required Existing infrastructure l
Slide 12: World class execution team
World class execution team Team with track record and experience of building and leading major energy businesses Board of Directors Wealth of experience in developing projects and Philipp Kin Charles Whitfield Andrew Kirk Garry Plowright businesses from inception Chairman Commercial Director Non-Exe
Slide 13: WAH2 Project is best-placed
WAH2 Project is best-placed Early mover project with competitive advantages related to tech. choice and secured site Hexagon’s WAH2 Project is considered the most 140 + Australian Hydrogen Projects More than 140 hydrogen- related projects have been announced in Australia advanced clean ammonia expor
Slide 14: Timeline
Timeline Multiple near-term revaluation events as project advances Hexagon WAH2 Project Hexagon has already Indicative Timeline achieved major RFSU end 2028 milestones to establish Prefeasibility Basis of Design FID the project. Pre-FEED FEED EPC and commissioning 2024 2025 2026 Active negotiations
Slide 15: Substantial progress since Pre-feasibility
Substantial progress since Pre-feasibility Reducing uncertainty and suggesting improved economics relative to PFS Base Case1 Opportunities • Option to Lease agreed in-principle with DevelopmentWA Site captured to simplify • Baseline surveys suggest no significant issues2 scope, reduce capital Plant
Slide 16: Funding path to production
Funding path to production Preserving shareholder value by staged approach Hexagon WAH2 Project Staged Financing Strategy RFSU end 2028 Prefeasibility Basis of Design FID EPC and WAH2 will be progressed Pre-FEED FEED commissioning in combination with 2024 2025 2026 equity partners who will represent
Slide 17: Compelling proposition
Compelling proposition FEED on WAH2 the next key milestone, pathway to Project partnerships Early mover, Advantaged Near-term Attractive Growth large market project catalysts returns upside Hexagon is a front Secured project site Multiple near-term Accessing WAH2 Phase 2 runner in accessing with acc
Slide 18: Fuelling the Future
Fuelling the Future Low Emissions Ammonia From Australia to APAC This announcement has been authorised for release to the ASX by the Board of Hexagon Energy Materials Ltd. FOR FURTHER INFORMATION, please contact: Stephen Hall [email protected] hxgenergymaterials.com.au © 2023©Hexago