Bombardier Inc. Class A · TSX:BBD.A
Bombardier Inc. Class A — Bombardier Transportation — Corporate Update (November 2001)
10 slides from Bombardier Inc. Class A's corporate update, Nov 13, 2001
Slide 1: The Passenger-Vehicle Manufacturing Network Strategy in Europe
The Passenger-Vehicle Manufacturing Network Strategy in Europe Berlin, November 13, 2001
Slide 2: Bombardier Transportation in Europe: 25,000 Employees
Bombardier Transportation in Europe: 25,000 Employees UK UK:: 4502 4502 Norway: Norway: 242 242 Finland: Finland: 62 62 Germany: Germany: 9289 9289 SSweden: weden: 2154 2154 BBelgium: elgium: 942 942 Denmark: Denmark: 531 531 Franc France: e: 1333 1333 Poland: Poland: 1283 1283 SSwitzerland: witzerl
Slide 3: 27 Manufacturing Sites in 14 European Countries
27 Manufacturing Sites in 14 European Countries Randers Västeras Kalmar Aachen Brugge Ammendorf Hennigsdorf Derby FAGA Sites Austria 1 Vetschau Belgium 1 Wakefield Niesky Czech Republic1 Republic1 Denmark 1 Bautzen France 1 Crespin Germany 11 Görlitz Hungary 1 Italy 1 Kassel Poland 1 Pratteln Portug
Slide 4: Implemented Strategy in Germany
Implemented Strategy in Germany Hennigsdorf Kassel Final Assembly German and other Locomotives markets Test Center for all kind of Vehicles Siegen European Center for Bogies Berlin / FAGA Pre-assembly E-Components Aachen Görlitz Assembly Dutch DD + Talent Carbody (Steel + AL) Mannheim Assembly Germa
Slide 5: Germany: Packages Vetschau and Ammendorf
Germany Packages Vetschau: About 110 employees in Vetschau affected We plan to offer jobs in Görlitz and Siegen We plan to offer appropriate relocation packages Packages Ammendorf: About 850 Employees in Ammendorf affected We plan to offer jobs in Aachen, Bautzen and Görlitz We plan to offer appropr
Slide 6: Germany: Packages Hennigsdorf
Germany Packages Hennigsdorf: About 55 employees in Hennigsdorf pre-assembly and about 180 employees in Hennigsdorf carbodies affected We plan to offer jobs at FAGA and to absorb within Hennigsdorf 5
Slide 7: Implemented Strategy in Sweden
Implemented Strategy in Sweden About 100 employees affected in Västeras final assembly Västerås Vehicle test track Facilities We plan to offer Service Location employment Propulsion opportunities at Kalmar and Services at Västeras Kalmar Carbody We plan to offer Final Assembly appropriate training a
Slide 8: Implemented Strategy in Great Britain
Implemented Strategy in Great Britain SIG and sites below 100 employees Wakefield are not considered Refurbishment Voyager final Assembly Derby Bogies, Carbodies, Final About 150 Assembly employees affected European Center for in Doncaster METRO We plan to offer Crewe Central Rivers jobs at Wakefiel
Slide 9: Manufacturing Competencies in Europe
Manufacturing Competencies in Europe 1. Carbody (8 sites): 3. Propulsion (4 sites): Bautzen (D) Västerås (S) Görlitz (D) Mannheim (D) Vienna (A) Berlin FAGA (D) Crespin (F) Trapaga (ES) Brugge (B) 4. Locomotives & Freight (4 sites): Derby (UK) Kassel (D) Kalmar (S) Niesky (D) [freight cars only] Ama
Slide 10: Manufacturing Competencies in Europe
Manufacturing Competencies in Europe 6. Final Assemby (14 sites): General Assembly sites Specialized Sites (6) Passenger Vehicles (8) Kalmar (S) Randers (DK) [S-train Copenhagen] Hennigsdorf (D) Görlitz (D) [German-type Double Deck Coaches] Aachen (D) Bautzen (D) [LRV] Brugge (B) Vienna (A) [LRV] Cr
Bombardier Transportation — Corporate Update (November 2001) on 6ix