Slide 1: A Tanzanian Graphite Explorer – Investor Presentation
For personal use only A Tanzanian Graphite Explorer INVESTOR PRESENTATION greenrockenergy.com.au
Slide 2: Disclaimer
DISCLAIMER The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about and observe such restrictions. For
Slide 3: Corporate Overview
CORPORATE OVERVIEW Re-compliance with Chapters 1 & 2 Proposed Board and Management For personal use only 20 for 1 Consolidation of Securities Stephen Copulos (Proposed Chairman) $2-$2.5m Prospectus Offer at $0.05ps +30 years experience in a variety of businesses across a wide range of indust
Slide 4: A Tanzanian Graphite Explorer
A TANZANIAN GRAPHITE EXPLORER Commenced exploration in Tanzania following acquisition of the Mahenge North Graphite For personal use only Project (300km2) – July 2014 Early exploration success led to further acquisitions – Current tenure of 1,539km2 Four priority zones identified: Epanko North
Slide 5: Why Graphite?
WHY GRAPHITE? New applications to underpin increased demand For personal use only Growing demand from traditional applications – steel, refractory, foundry, batteries and lubricants Rapid growth from new applications – energy storage, nuclear reactors and fuel cells Electrification of vehicles
Slide 6: Why Tanzania?
WHY TANZANIA? Mineral-rich landscape supported by stable government For personal use only Major domestic commercial mining activity – 3rd largest gold industry in Africa Abundant high grade graphite occurrences Significant mining support services and extensive infrastructure network Governme
Slide 7: Location
LOCATION Close proximity to transport For personal use only infrastructure ~60km from Ifakara (rail station and regional airport) TAZARA rail line runs to Dar Es Salaam’s port ~350km Access to grid power and water Mahenge North Graphite Project contiguous to 22.8Mt Ifakara Epanko orebody (Ki
Slide 8: Project Overview
PROJECT OVERVIEW 1,539km2 exploration footprint compiled For personal use only since July 2014 Priority focus within four initial zones: • Epanko North (northern extension of KNL’s Epanko orebody) • Kituti (Mahenge Southwest) • Cascade (Mahenge North) • Ndololo (Mahenge North) Initial Explorat
Slide 9: Cascade Prospect
CASCADE PROSPECT Cascade is a new discovery with unusually wide For personal use only zones of graphite mineralisation Graphite mineralised envelope is >1km strike x 200m-400m width One trench (TREPC01) excavated to date – 186m @ 5.95% TGC including two zones of: 24m @ 7.89% TGC and 86m @
Slide 10: Epanko North Prospect
EPANKO NORTH PROSPECT >3km of graphite mineralisation identified north of, For personal use only and along the same north-south trending lode structures of KNL’s 22.8Mt Epanko orebody Current focus on graphite lode mineralisation located immediately north of KNL’s tenement boundary Current map
Slide 11: Kituti Prospect
KITUTI PROSPECT Recently identified and mapped For personal use only One high grade graphite outcrop observed to date – 12.15% TGC Trenching programme underway on northern portion of structure Drill pads being prepared for drilling in January 2015 10 greenrockenergy.com.au
Slide 12: Development Pathway
DEVELOPMENT PATHWAY For personal use only Construction & Exploration Development Production Tenure Acquisition Metallurgical testwork, Project Execution Plan Community engagement Pre-feasibility or scoping Financing study, Construction Commence exploration Offtake marketing Maide
Slide 13: ASX Peer Comparison
ASX PEER COMPARISON For personal use only Market Resource Grade Resource Category Company Capitalisation Size Type Project Location (TGC%) (JORC) ($m) (Mt) Syrah Resources (SYR) 581 1,150 10.2% Flake Measured, Ind, Inf Mozambique Triton Minerals (TON) 76 1,457 10.7% Flake Indicated, Inferred Mozambi
Slide 14: Summary
SUMMARY Objective: Deliver shareholder upside through For personal use only defining and developing a graphite resource Tenure is demonstrably highly prospective for graphite. Four prospects have delivered excellent early stage results - Epanko North and Kituti being prepared for drilling High
Slide 15: Contact
CONTACT Gabriel Chiappini Director For personal use only [email protected] T: (+61 8) 9226 3815 W: www.greenrock.com.au A Tanzanian Graphite Explorer greenrockenergy.com.au