Orion Minerals Limited · ASX:ORN

Orion Minerals — Corporate Update (January 2020)

34 slides from Orion Minerals's corporate update, January 2020

  1. Slide 1: Prieska Copper-Zinc Project: Outcomes of the Bankable Feasibility Study

    ASX/JSE: ORN ASX/JSE: ORN PRIESKA COPPER-ZINC PROJECT Outcomes of the Bankable Feasibility Study PAGE Community update: January 2020

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation contains summary information about Orion in such forward-looking statements; and not materially changed. Minerals Ltd and its subsidiaries (Orion or Company) and their • may include, among other things, statements regarding Orion confirms that the form and context in whi

  3. Slide 3: Contents

    CONTENTS 1) Executive Summary – What do we intend to do and why? Why Develop a mine? Who are the mine owners? How does the country benefit? Bankable Feasibility Highlights 2) Project Licencing – What approvals do we still need before we can start? 3) Exploration and Mineral Resources – What are we m

  4. Slide 4: Executive Summary: What do we intend to do and why?

    EXECUTIVE SUMMARY What do we intend to do and why? Build a modern, safe and profitable copper and zinc mine • We have found – 30.5 million tonnes of rock, with 1.2% as copper and 3.7% as zinc • From which we can mine – 20.7 million tonnes, with 1.1% as copper and 3.4% as zinc • For a mine life of –

  5. Slide 5: Executive Summary: Why develop a mine?

    EXECUTIVE SUMMARY Why develop a mine? To benefit the country, while earning a profit for the mine owners • A profitable mine – that will produce copper for an all-in-sustaining cost of R54,700/t Cu, and receive an estimated R97,850/t Cu (44% margin) • Amount of money generated over the initial 10 ye

  6. Slide 6: Executive Summary: Who are the mine owners?

    EXECUTIVE SUMMARY Who are the mine owners? Community Trust Employees’ Trust BEE Shareholders ORN Public- listed Shares To benefit the country, while earning a (5%) (5%) (20%) (70%) profit for the mine owners Prieska Copper Zinc Mine PAGE 6

  7. Slide 7: Executive Summary: How does the region benefit?

    EXECUTIVE SUMMARY How does the region benefit? • Improved water supply – 20ML a day Water Treatment Plant planned for Prieska • Improved residential development – Contributes to the 3,500 new residences planned in the IDP • Provides employment – 900 people directly, 2,700 – 9,000 indirectly benefit

  8. Slide 8: Bankable Feasibility Study Highlights

    EXECUTIVE SUMMARY Bankable Feasibility Study Highlights PAGE 8 Reference: Orion Minerals ASX/Sens announcement on 24 June 2019

  9. Slide 9: Project Licencing: What approvals do we still need?

    PROJECT LICENCING What approvals do we still need before we can start? Licences and permits Prieska Project Permit Areas Repli Vardocube Social and Labour Plans – Commitments to ensure the community at ✓ ✓ large benefits Environmental Authorisations – Commitments to ensure the environment is ✓ looke

  10. Slide 10: Exploration and Mineral Resources: What are we mining?

    EXPLORATION AND MINERAL RESOURCES What are we mining? • The Prieska Deposit is one of the largest known single lens Volcanogenic Massive Sulphide (VMS) deposits. Massive • The Deposit is in the 3km thick Copperton Formation of the Areachap Group. Sulphides in Prieska • The Areachap Group also hosts

  11. Slide 11: What will the mine look like?

    EXPLORATION AND MINERAL RESOURCES What will the mine look like? NW Hutchings Shaft SE 300m below surface to water level Current Flooded Water Level Already mined 900m depth to the future bottom of mine To be mined PAGE 11

  12. Slide 12: What is available to be mined?

    EXPLORATION AND MINERAL RESOURCES What is available to be mined? Combined Prieska Project Mineral Resource for Repli + Vardocube Tenements (Effective Date: 11 January 2019) Cu Zn Mineral Classifica Cu Zn Tonnes (metal (metal Resource tion (%) (%) tonnes) tonnes) Deep Indicated 18,507,000 217,000 1.2

  13. Slide 13: Mine Plan: What does underground mining entail?

    MINE PLAN What does underground mining entail? • Dewatering – 8.7 million cubic metres of water to pump out in 18 months. Water to be stored in lined dams or treated for secondary use • Shaft and mine refurbishment – Shaft has been inspected. New steelwork will be used as required • Specialised mech

  14. Slide 14: Mining Method

    MINING METHOD How we will bring the rock to the surface? PAGE 14

  15. Slide 15: Mineral Processing: What happens once the rock is on the surface?

    MINERAL PROCESSING What do we do once the rock is on the surface? Concentrator will be on site: • Crushing – Crushing will happen underground • Milling – Two ball mills will be used • Flotation – Copper, gold and silver concentrate will be floated first and then zinc concentrate • Drying – Concentra

  16. Slide 16: Mineral Processing: Concentrator site layout

    MINERAL PROCESSING What is the concentrator site layout? PAGE 16

  17. Slide 17: Mineral Processing: What will we sell? Copper

    MINERAL PROCESSING What will we sell? Copper (in concentrate) • Copper’s main uses are electrical cables, motors, piping, construction, air conditioning and metals alloys • Will be helped by the growth of the electric vehicle market and rising electrification needs globally • The global copper metal

  18. Slide 18: Mineral Processing: What will we sell? Zinc

    MINERAL PROCESSING What will we sell? Zinc (in concentrate) • China produces and consumes 50% of zinc metal • Zinc’s main uses are in infrastructure and construction, the vehicle industry and electronics. Its most important application is in galvanizing steel (50% of zinc metal consumed) • Zinc chem

  19. Slide 19: Mine Infrastructure

    MINE INFRASTRUCTURE What needs to be built so we can operate the mine? • Processing plant – a 2.4Mtpa concentrator to produce copper and zinc products • Storage dams – Water reservoirs and tailings storage facility • Power supply – 40MVA from Cuprum Substation and renewable energy from solar and win

  20. Slide 20: Operating Philosophy and Human Resources

    OPERATING PHILOSOPHY AND HUMAN RESOURCES How many people will the mine need to operate? Operations will: Labour Category Number Management and Administration 93 • be continuous Engineering (surface and underground) 209 • require specialised skills Mineral Processing 125 • use contracts for select fu

  21. Slide 21: Operating Philosophy and Human Resources

    OPERATING PHILOSOPHY AND HUMAN RESOURCES How many people will the mine need to operate? PAGE 21 Note: Labour numbers are estimates and will vary based on operational requirements

  22. Slide 22: Project Development Milestones: What happens next?

    PROJECT DEVELOPMENT MILESTONES What happens next? PAGE 22

  23. Slide 23: Social and Labour Plan Projects: Social commitment

    SOCIAL AND LABOUR PLAN PROJECTS What is our social commitment? MoU and Steercom STRATEGIC Water Residential Energy Enterprise FOCUS Education Infrastructure Development Infrastructure Development 2.Skills 3.Residential 4.Renewable 5.Community 1.Water Works Energy Development Planning Liaison Centre

  24. Slide 24: Local Economic Development Projects

    SOCIAL AND LABOUR PLAN PROJECTS Local Economic Development Projects SLP Local Economic Development (LED) Projects Planned Expenditure - Repli Projects Total Comments Water Infrastructure R4.00m Upgrade and maintain Prieska Waterworks Residential Development Planning R1.62m Facilitate residential dev

  25. Slide 25: Water infrastructure

    LOCAL ECONOMIC DEVELOPMENT PROJECTS Water infrastructure Status • MoU between Siyathemba Municipality and Orion concluded MoU secures supply/offtake (6Ml/day) and pricing range, as well as Repli commitment to upgrade & maintain waterworks • Water Infrastructure Sub-Committee established • Water supp

  26. Slide 26: Residential development planning

    SOCIAL AND LABOUR PLAN PROJECTS Residential development planning Status • 50Ha area in Prieska identified for mine village (5Ha) and future residential development • Residential Development Sub-Committee established • Planning process (SPLUMA*) for mine residential suburb in Prieska in progress Bene

  27. Slide 27: Renewable energy

    SOCIAL AND LABOUR PLAN PROJECTS Renewable energy Status • Renewable Energy Generation Collaboration Agreement concluded between Orion and juwi. Proposed ‘behind the meter’ 35MW supply Benefits for Community • Contribute to the Municipality’s Alternative Energy Development Initiative - aimed at estab

  28. Slide 28: Local skills development

    SOCIAL AND LABOUR PLAN PROJECTS Local skills development Benefits for the community • Repli: To develop the skills of at least ten community members per year through a partnership with the Siyathemba Municipality and a preferred training centre or an alternative facility to be developed in Prieska T

  29. Slide 29: Human Resource Development

    SOCIAL AND LABOUR PLAN PROJECTS Human Resource Development Human Resource Development - Repli Human Resource Development - Vardocube Category Total Category Total ABET R19.10m ABET R750 000 Learnerships R5.47m Learnerships R960 000 Portable Skills R4.77m Portable Skills R630 000 Bursaries R2.29m Bur

  30. Slide 30: Human Resource Development

    SOCIAL AND LABOUR PLAN PROJECTS Human Resource Development ABET Total Adult Basic Education and Training (ABET) is provided to adults who want to finish their basic education and become literate. We believe ABET will play a fundamental role in building the foundation for employee career paths. We in

  31. Slide 31: Human Resource Development

    SOCIAL AND LABOUR PLAN PROJECTS Human Resource Development Bursaries Total A grant by the mine, awarded to someone to enable them to study at university or college. The bursary programme will be offered to qualifying school leavers interested in mining-related and non-mining related disciplines. Gra

  32. Slide 32: Procurement and Enterprise Development

    SOCIAL AND LABOUR PLAN PROJECTS Procurement and Enterprise Development Mining Goods 70% BEE Procurement • Black owned companies 44% BEE compliant companies require at least 50 + 1% The mine will Black Ownership comply with 21% HDP owned and controlled companies • BEE compliant Mining Charter III man

  33. Slide 33: Supplier Registration Portal

    SOCIAL AND LABOUR PLAN PROJECTS Supplier Registration Portal Status 115+ entities registered: • 65 from Siyathemba (local) • Educational seminars for SMME & NGO Development No. of SCNet Registrations (Siyathemba) 40 35 30 25 20 15 10 5 0 PAGE 34

  34. Slide 34: For further information, contact: Orion Minerals Limited