Environmental Clean Technologies Limited · ASX:ECT
Environmental Clean Technologies — Investor Presentation (October 2012)
17 slides from Environmental Clean Technologies's investor presentation, Oct 9, 2012
Slide 1: Introduction to ECT
Introduction to ECT Investor Briefing Tuesday 9 October 2012 | Twilight Investor Briefing
Slide 2: Disclaimer
Disclaimer Environmental Clean Technologies Limited has taken all reasonable care in compiling and producing the informaEon contained in this presentaEon. The Company will not be responsible for any loss or damage arising from the use of the informaEon contained in this presentaEon. The informaEon p
Slide 3: Overview
Overview Global Energy Overview A brief introduction to ECT Low Rank Coal challenge & the Coldry solution Strategic Partners Government Initiatives ECT Next Steps
Slide 4: Global Electrical Energy: Drivers
Global Electrical Energy: Drivers Economic Activity = Electricity Demand Available generation means; Policy Drivers Non-renewable: – Available resources (size, development, policy) – Resource cost of production & delivery to market – Relative fuel prices (competition) – Geopolitical, Regulator
Slide 5: Energy Sector Stats
Energy Sector Stats: Energy sector: – In 2011 coal was the fastest growing form of primary energy (inc. renewables) – Global electricity demand s : in 2009 was 17,200 TWh, and is projected to eyover Kto s s Me31,700 a g e grow TWh by 2035 d is g r o w g (for in reference, Australia consumed about
Slide 6: ECT introduction
ECT introduction Technology commercialisation company Listed on the Australian Stock Exchange (ASX:ESI) Focused on: Core competencies: – Energy Sector – Brown Coal – Resource sector – Process Development Economic Outcomes, Energy & Resource Security, CO2 mitigation Coldry Process – Low ran
Slide 7: Low rank coal challenge
Low rank coal challenge High moisture Low calorific value (CV) Low thermal efficiency Higher CO2 emissions Low market value due to limited use – Not suitable in black coal power stations due to low CV – Not economic to transport due to high moisture content – Spontaneous combustion risk du
Slide 8: Coldry Solution
Coldry Solution Brown coal densification – Destroy microstructure via mechanical shear – Liberate physically and some chemically trapped moisture Low temperature (as low as 35°C – 45°C) Waste heat utilisation from host power station reduces operating expenditure Low pressure Power station
Slide 9: Coldry Process
Coldry Process Coldry is a simple, mechanical process which generates a Black Coal Equivalent energy pellet. 1. Screening and adding a small quanEty of water to the raw coal 2. IniEaEng an exothermic chemical reacEon to expel water through aKriEoning and extrusion of a plasEcized mixture 3. Warm air
Slide 10: Coldry Solution
ENVIRONMENTAL CLEAN TECHNOLOGIES LIMITED aa TURBINE L_ | CONDENSER $e con. ON ATTRITION/EXTRUDE COLDRY PROGESS = WASTE HEAT EXCHANGE CONDITION ) Coldry Solution PRECIPITATOR ~R ™ PULERISER COLDRY BCE PELLETS ——_«<> EXPORT
Slide 11: Status of Development - Coldry
Status of Development - Coldry • Ownership of Intellectual Property • Bench, Test, Pilot plant development sequences passed • Detailed commercial design in progress • First Commercial project to be built in Victoria (following design & subsequent construction) Design for Tender: Phase 1 complete, 2
Slide 12: Coldry Modular Design
Coldry Modular Design Victorian Project Detail design currently under way
Slide 13: Strategic Partners & Suppliers
Strategic Partners & Suppliers Monash Capital – Cornerstone investor Arup – Process design & engineering, procurement GHD – Planning, power station integration McConnell Dowell – Fabrication & Construction JC Steele – Critical Equipment / Process optimisation Mecrus – EL services
Slide 14: Target Markets
Target Markets Coldry: – Energy security for developing nations via dewatering and making more widely usable domestic high moisture coal resources • Example – India, China, Indonesia – Energy export for countries with large high moisture coal reserves • Example – Australia, Indonesia, Poland – Low c
Slide 15: State & Federal Government Initiative
State & Federal Government Initiative Advanced Lignite Demonstration Program $90 million, competitive, merit-based grant program Targeting pre-commercial demonstration of fit-for- purpose “coal upgrading” processes Aims: – To develop and deploy emerging technology to reduce greenhouse gas emis
Slide 16: Looking to the Future
Looking to the Future Coldry to advance to demonstration – Completion of ‘Design For Tender’ for Loy Yang-based Demonstration plant – Commissioning targeted for 2014 – Commercial rollout to 2mtpa following demonstration – O/S deployment in target locations Matmor – Pilot plant development target
Slide 17: Thank you
Thank you Ashley Moore Chief Operating Officer & Executive Director [email protected] +61 3 9909 7684
Environmental Clean Technologies — Investor Presentation (October 2012) on 6ix