Kenya Pipeline Company PLC · NSEKE:KPC
Kenya Pipeline — Corporate Update (October 2024)
22 slides from Kenya Pipeline's corporate update, October 2024
Slide 1: Application for Review of the Imports Handling & Primary Storage Tariff
THE KENYA PIPELINE COMPANY LIMITED APPLICATION FOR REVIEW OF THE IMPORTS HANDLING & PRIMARY STORAGE TARIFF Presentation to STAKEHOLDERS FORUM INTERNAL USE ONLY KPC - Public 1
Slide 2: Contents
CONTENTS 1 KPC – An Overview 2 The Current Tariff 3 Application for Tariff Review INTERNAL USE ONLY KPC - Public 2
Slide 3: KPC – An Overview
1 KPC – An Overview INTERNAL USE ONLY KPC - Public 3
Slide 4: KPC – An Overview
1.0 KPC – An Overview Kenya Pipeline Company Limited (KPC) is fully owned Our Vision (100%) by the Government of Kenya. It was incorporated on 6th September 1973. Africa’s Premier Oil And Gas Company Commenced commercial operations in February 1978. KPC acquired the Kenya Petroleum Refinerie
Slide 5: The Pipeline Network System
1.0 KPC – An Overview … Cont’d The Pipeline Network System Kenya’s pipeline network currently consists of: Pipelines loop of 1,342 km running from Mombasa through Nairobi to the Western Kenya towns of Nakuru, Eldoret and Kisumu. The Mombasa Nairobi Pipeline constructed in 1978 (Line 1) has bee
Slide 6: Current Installed Pipelines Capacity
1.0 KPC – An Overview Current Installed Pipelines Capacity Achievable Date Distance Diameter Installed Flow Pipeline Segments throughput per completed (KM) (Inches) Rate (m3/hr) annum (m3) Mombasa - Nairobi (Line 5) 2018 450 20 1,300 10,818,600 Nairobi - Eldoret (Line 2) 1994 325 8&6 220 1,830,840 S
Slide 7: Storage Capacity
1.0 KPC – An Overview Storage Capacity The pipeline system is linked to various storage depots with a gross active storage of ~1,028,324 m3 . Storage Capacity in Depots (in m3) KOSF Aerial view Kisumu, 45,288 Eldoret, 48,089 Nakuru, 30,533 KOSF, 326,233 Nairobi , 232,580 JKIA, 54,141 Moi Airport,
Slide 8: Product Delivery
1.0 KPC – An Overview Product Delivery Product delivery is mainly through: Transfers to the Oil Marketers’ depots in Nairobi through interconnecting pipelines. Truck loading facilities at the Western Kenya Depots and KPRL. Airport hydrant system for direct fuelling into-plane. KPC’s client
Slide 9: Scope of tariff under review
1.0 KPC – An Overview Scope of tariff under review: Handling of imports from the Kipevu Oil Terminal (Kipevu Oil Terminal is owned by KPA but operated by KPC) Storage and handling at Kipevu Oil Facility Storage and handling at KPRL Changamwe & in the near future Port Reitz tanks Truck loadin
Slide 10: The Current Tariff
2 The Current Tariff INTERNAL USE ONLY KPC - Public 10
Slide 11: Current Tariff
2. Current Tariff The prevailing tariff was approved by EPRA in July 2021, with some adjustment done in October 2022. It covered the control period 2021/22 – 2023/24 with an extension of the 2023/24 rate to end of November 2024. 2021/22 Tariff 2022/23 Tariff 2023/24 Tariff Service In Kshs/m3 In
Slide 12: Current Tariff…Cont'd
2. Current Tariff…Cont’d Major investments undertaken during the ended tariff control period: 1. Upgrade of the petroleum fuels Truck Loading Facility at KPRL. 2. Construction of LPG truck loading facility. 3. Rehabilitation of the crude oil tanks at Port Reitz to handle AGO. Project completed in Ju
Slide 13: Application for Tariff Review
3 Application for Tariff Review INTERNAL USE ONLY KPC - Public 13
Slide 14: Application for Tariff Review
3. Application for Tariff Review Following the end of the 3-year tariff control period, KPC was required to make an application to EPRA for review of the tariffs. KPC submitted the application in March 2024. KPC and EPRA have had discussion on the application by KPC, majorly to clarify on the
Slide 15: Tariff Structure
3. Application for Tariff Review … Cont’d Tariff Structure This tariff application is guided by KPC’s Tariff Policy, which is aligned to EPRA’s guidelines, and provides that the tariff be derived from Revenue Requirements methodology. The formula is: RR = (RAB x RoR) + E + D + T RR: Revenue Requ
Slide 16: Tariff Principles
3. Application for Tariff Review … Cont’d Tariff Principles The tariff review is further guided by the principles set by EPRA and are detailed below: 1. Working Capital: The RAB to consist of the following two items: a. Cash determined as 45 days of Operations and Maintenance expenditure. b. Invento
Slide 17: Tariff Inputs: Regulated Asset Base
3. Application for Tariff Review … Cont’d Tariff Inputs Regulated Asset Base KOSF assets (Net Present Value) projected to 2023/24 - Projected Projected Projected be Kshs. 5.81 billion as at end of FY 2024/25 Rate base in Kshs. Billion provisional 2024/25 2025/26 2026/27 reducing to Kshs. 4.66 bill
Slide 18: Tariff Inputs: Operating Expenses
3. Application for Tariff Review … Cont’d Tariff Inputs 2023/24 Operating Expenses 2024/25 2025/26 2026/27 2022/23 (provisional) Operating expenses in Kshs. Billion KOSF expenses (less KPC places emphasis on efficiency 1.20 1.47 1.36 1.64 1.83 depreciation) and cost control and has only KPRL exp
Slide 19: Tariff Inputs: Throughput Projections
3. Application for Tariff Review … Cont’d Tariff Inputs Throughput Projections Throughput is based on estimated Projected Projected Projected domestic demand and transit imports Actual 2023/24 2024/25 2025/26 2026/27 through the port of Mombasa. Local Demand 5,514,170 5,845,999 6,037,312 6,235,1
Slide 20: Proposed Tariffs
3. Application for Tariff Review … Cont’d Proposed Tariffs The resultant proposed tariffs Proposed 2024/25 Proposed 2025/26 Proposed 2026/27 are as follows: In Kshs/m3 In US$/m3 In Kshs/m3 In US$/m3 In Kshs/m3 In US$/m3 Import handling and storage tariff Imports Handling 42.62 0.32 44.48 0.33 46
Slide 21: Impact on Pump Prices and Comparative Analysis
3. Application for Tariff Review … Cont’d Impact on Pump Prices The contribution of the import handling and storage tariff to the pump price is Kshs. 0.62/litre (Current is Kshs. 0.403/litre) Contribution to the pump prices is 0.0033% (Nairobi Petrol). Comparative analysis Variance Variance KOSF
Slide 22: The End…. Thank You
The End…. Thank You INTERNAL USE ONLY KPC - Public 22