  1. Slide 1: A350 XWB Programme Update

    A350 XWB Programme Update Jan 2014 Presented by Didier EVRARD Head of A350 XWB Programme A350 XWB Programme Update Deutsche Bank Presentation

  2. Slide 2: Safe Harbour Statement

    A350 XWB Programme Update Jan 2014 Safe Harbour Statement DISCLAIMER This presentation includes forw ard-looking statements. Words such as “anticipates”, “believes”, “estimates”, “expects”, “intends”, “plans”, “projects”, “may” and similar expressions are used to identify these forw ard-looking stat

  3. Slide 3: Content

    A350 XWB Programme Update Jan 2014 Content Achievements & Flight Test campaign Route to industrial ramp-up Customers A350-1000 status © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  4. Slide 4: Development Aircraft kicking into life in 2013

    A350 XWB Programme Update Jan 2014 5 Development Aircraft kicking into life in 2013… January February March MSN001 in Sta30 MSN001 GVT MSN001 &003 in FAL April May June MSN001 &003 in C63 MSN001 First Flight MSN001 painted July October MSN002 moving to Sta 30 August MSN003 First Flight MSN004 fusela

  5. Slide 5: Flight Test campaign key achievements

    A350 XWB Programme Update Jan 2014 Flight Test campaign key achievements  System Tests performed  AUTOLAND tests + Auto-Pilot / Auto-Thrust /  RAT perfo assessment Flight Director functional  WAI perfo assessment  Lapse-Rate Take Off completed  Climb perfo for AFM completed  Aero Configuratio

  6. Slide 6: MSN5000 Wing bending Ultimate Load

    A350 XWB Programme Update Jan 2014 MSN5000 Wing bending Ultimate Load Successfully conducted Ultimate Load test without any structural damage © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  7. Slide 7: MSN003 high altitude tests Bolivia

    A350 XWB Programme Update Jan 2014 MSN003 high altitude tests Bolivia  13 hours long flight to Bolivia without any technical issue  La Paz 13,300 feet above sea level  Demonstration & validation of engines, APU and systems functionality under extreme conditions during take-off and landing  Stop-

  8. Slide 8: On track for Type Certification and EIS in second half 2014

    A350 XWB Programme Update Jan 2014 A350-900 Flight test Aircraft progress MSN005 Cabin, Operability, Certification Standard Training, ETOPS, MSN005 Route Proving MSN004 MSN004 Avionics development Certification MSN002 MSN002 Cabin development Certification MSN003 Performance Systems & Powerplant MSN

  9. Slide 9: Flight tests campaign progressing

    A350 XWB Programme Update Jan 2014 Flight tests campaign progressing MSN001 / MSN003 MSN001 • Active flight testing ongoing • Active flight testing ongoing MSN003 • First cabin-fitted aircraft MSN002 • Cabin completion ongoing • Station 22 / painting MSN004 • Second cabin-fitted aircraft MSN001 Firs

  10. Slide 10: All development aircraft have entered the FAL: MSN002

    A350 XWB Programme Update Jan 2014 All development aircraft have entered the FAL MSN002 • Active flight testing ongoing MSN001 • Active flight testing ongoing MSN003 • First cabin-fitted aircraft MSN002 • Cabin completion ongoing • Station 22 / painting MSN004 • Second cabin-fitted aircraft MSN005 •

  11. Slide 11: All development aircraft have entered the FAL: MSN004

    A350 XWB Programme Update Jan 2014 All development aircraft have entered the FAL MSN004 • Active flight testing ongoing MSN001 • flight testing started MSN003 • First cabin-fitted aircraft MSN002 • Cabin completion ongoing • Station 22 / painting MSN004 • Second cabin-fitted aircraft MSN005 • Statio

  12. Slide 12: All development aircraft have entered the FAL: MSN005

    A350 XWB Programme Update Jan 2014 All development aircraft have entered the FAL MSN005 • Active flight testing ongoing MSN001 • flight testing started MSN003 • First cabin-fitted aircraft MSN002 • Cabin completion ongoing • Station 22 / painting MSN004 • Second cabin-fitted aircraft MSN005 • Statio

  13. Slide 13: Innovation to address maturity at EIS

    A350 XWB Programme Update Jan 2014 Preparation to EIS with Airline 1 Flight test conditions to mirror Airlines operations measuring same KPI’s such as Operational Reliability, Operational Interruptions, etc. Head of Airline 1 Board of Directors Advisory A/L Office Flight Line & Line Maintenance Flig

  14. Slide 14: Content

    A350 XWB Programme Update Jan 2014 Content Achievements & Flight Test campaign Route to industrial ramp-up Customers A350-1000 status © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  15. Slide 15: Transition from development to serial production

    A350 XWB Programme Update Jan 2014 Transition from development to serial production © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  16. Slide 16: Ramp-up Structured approach

    A350 XWB Programme Update Jan 2014 Ramp-up Structured approach Focussing on 5 top priorities:  Design stability  Critical Suppliers  Missing parts  Quality  Customization © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  17. Slide 17: Customization Activity ramp-up

    A350 XWB Programme Update Jan 2014 Customization Activity ramp-up Since 2011, 6 Contractual 5Definition Freeze declared: Customer Definition Activity is ramping-up: 5 CDF’s in 2013 – 10 in 2014 – 13 in 2015 © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  18. Slide 18: A350 RC Convergence Toolbox

    A350 XWB Programme Update, January 2014 A350 RC Convergence Toolbox RC Convergence Project Business Improvement Steering MAKE DtC Transverse Transverse Transverse Strategic (incl. Buy in Make (Make & Buy) Projects Process Engineering Supplier consumption) Improvement Convergence Hourly DtC Transvers

  19. Slide 19: Ramp-up Price

    A350 EBIT pre R&D before One Offs Early RC – Buy / Make aircraft Ramp - UP Rank 100 x Serial Price A350 XWB PRICE Launch Price A350 XWB Launch Price A350 Page 21 © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  20. Slide 20: Content

    A350 XWB Programme Update Jan 2014 Content Achievements & Flight Test campaign Route to industrial ramp-up Customers A350-1000 status © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  21. Slide 21: 812 orders from 39 Customers (incl. 189 -1000)

    A350 XWB Programme Update Jan 2014 Firm order status – end December 2013 30 Countries – 3 Alliances – 6 Leasing companies Asia & Pacific Americas Africa & Middle East Europe Private Customer Leasing Companies Alliances UNIDENTIFIED 812 orders from 39 Customers (incl. 189 -1000) © AIRBUS S.A.S. All r

  22. Slide 22: MSN006 first Customer aircraft entered in the FAL

    A350 XWB Programme Update Jan 2014 MSN006 First Customer aircraft MSN006 first Customer aircraft entered in the FAL © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  23. Slide 23: Catalogue enrichment 2011 – 2013

    A350 XWB Programme Update Jan 2014 Catalogue enrichment 2011 – 2013 Where we started Z300 Equinox Journey Cirrus Arcus Celeste* Solstys CL3620 Still 2012 2013 expanding! Pinnacle 5751 Bars Nespresso Flex floor Hybrite PYC 5810 maker path NELIs marking Constant catalogue enrichment demonstrated High

  24. Slide 24: Content

    A350 XWB Programme Update Jan 2014 Content Achievements & Flight Test campaign Route to industrial ramp-up Customers A350-1000 status © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  25. Slide 25: A350-1000 endorsed by the market

    A350 XWB Programme Update Jan 2014 A350-1000 development A350-1000 • Low risk development from -900 • Industrial means launched • Detailed design freeze by end-2013 • On track for EIS mid-2017 Concept Design Definition Final assembly First freeze freeze freeze start flight EIS 2011 2012 2013 2014 20

  26. Slide 26: A350-1000 development from A350-900 is low risk

    A350 XWB Programme Update Jan 2014 A350-1000 derived from -900 Revised wing trailing edge structure ext TE Reinforced structure where needed + 5 frames High systems commonality 6 wheel bogie main landing gear + 6 frames 1 frame longer MLG bay Higher thrust engine Trent XWB 97,000 lb thrust A350-1000

  27. Slide 27: -1000 production rate increase to answer market needs

    A350 XWB Programme Update Jan 2014 A350-1000 market growing Number of new aircraft 2,500 2,369 ~6,500 units 2,208 for A350 2,000 ~1900 units (+26% since A350 XWB launch) 1,500 1,210 1,000 710 500 0 250 300 350 400 Twin-aisle passenger aircraf t Source: Airbus GMF 2012 -1000 production rate increase

  28. Slide 28: Industrial Set-up sized to rate 13 and flexibility across A350 family

    A350 XWB Programme Update Jan 2014 Industrial Enablers Investing for additional capacity and ramp-up New Station 30 New Station 50 Instead current St. 59 New Station 59 Sections preparation Industrial Set-up sized to rate 13 and flexibility across A350 family © AIRBUS S.A.S. All rights reserved. Con

  29. Slide 29: Dedicated TXWB-97 FTB campaign in less than 2 years

    A350 XWB Programme Update Jan 2014 A350-1000 – Trent XWB-97 Powerplant Dedicated TXWB-97 FTB campaign in less than 2 years © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

  30. Slide 30: Next steps

    A350 XWB Programme Update Jan 2014 Next steps Certification on time on H2 2014 Deliver mature aircraft at EIS Ramp-up gates to be secured (Supply Chain,…) Execution of new Customization policy Investing for additional capacity and ramp-up Capitalize on the A350 family position to increase market sha

  31. Slide 31: A350 XWB Programme Update Jan 2014

    A350 XWB Programme Update Jan 2014 © Airbus S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS. No intellectual property rights are granted by the delivery of this document or the disclosure of its cont