Aeris Resources Limited · ASX:AIS

Aeris Resources — Q1 FY27 Earnings Presentation

22 slides from Aeris Resources's earnings presentation, Oct 29, 2026

  1. Slide 1: Q1 FY27 Quarterly Results

    rsonal use only Q1 FY27 Quarterly Results 29 October 2026 Presented by: Andre Labuschagne

  2. Slide 2: Disclaimer

    DISCLAIMER rsonal use only This investor presentation has been prepared by Aeris Resources Limited (“Aeris” or the “Company”). By attending an FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS investor presentation or briefing, or accepting, accessing or reviewing this presentation, you acknowledge

  3. Slide 3: Disclaimer

    DISCLAIMER rsonal use only DISCLAIMER NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES To the maximum extent permitted by law, Aeris and each of its respective related bodies corporate, shareholders and This Presentation does not constitute an offer to sell, or the solicitation of an offer to bu

  4. Slide 4: Aeris Resources

    AERIS RESOURCES Australian mid-tier, copper and gold rsonal use only producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu $/t)

  5. Slide 5: Group Q1 Summary

    FY27 Unit Jun 26 QTR Sep 26 QTR Guidance GROUP Q1 SUMMARY Safety – LTIFR Copper produced /mmhr kt 4.6 6.5 5.1 5.9 22 – 27 Solid quarter, operations on track Gold produced koz 12.9 10.8 42 – 51 rsonal use only Silver produced koz 71.5 48.8 130 – 160 Cu eq production1 kt 11.3 9.3 37 – 46 Copper equiva

  6. Slide 6: Tritton

    rsonal use only TRITTON New South Wales

  7. Slide 7: Tritton Q1 Results

    Jun 26 Sep 26 FY27 Production Summary Unit QTR QTR Guidance TRITTON Q1 RESULTS Ore Mined Mined Grade kt % Cu 615.9 1.46 756.5 1.08 - - Ore Milled kt 451.1 452.0 - Production ahead of plan Milled Grade % Cu 1.61 1.47 - rsonal use only Recovery % Cu 90.1 88.4 - Copper Produced kt 6.5 5.9 22 – 27 Gold

  8. Slide 8: Avoca Tank

    AVOCA TANK Additional ore included in FY27 mine plan rsonal use only

  9. Slide 9: Constellation Update

    CONSTELLATION UPDATE rsonal use only Construction Construction underway Underway Site construction underway Mining Lease 5km of 25km haul road completed and sealed Granted 22 July 2026

  10. Slide 10: Constellation Waste Stripping

    CONSTELLATION WASTE STRIPPING rsonal use only Construction Construction underway Underway Mining Lease Granted 22 July 2026

  11. Slide 11: Cracow

    rsonal use only CRACOW Queensland

  12. Slide 12: Cracow Q1 Results

    FY27 Production Summary Unit Jun 26 QTR Sep 26 QTR Guidance CRACOW Q1 RESULTS Ore Mined Mined Grade Ore Milled kt g/t kt 150.3 2.33 167.1 127.4 2.24 157.3 - - - Strong mined and milled tonnes Milled Grade g/t 2.20 1.97 - rsonal use only Recovery % Au 88.9 88.4 - Gold Produced koz 10.5 8.8 34 – 41 Go

  13. Slide 13: Golden Plateau

    GOLDEN PLATEAU Material increase to Mineral Resource1 rsonal use only Grade Contained Metal Tonnes Deposit Category Au Ag Au Ag (kt) (g/t) (g/t) (koz) (koz) 220% increase in contained gold metal Measured 95 2.8 8 8.4 23 Indicated 910 2.1 5 60 160 Open Pit Measured and Indicated Mineral Resources now

  14. Slide 14: Golden Plateau

    GOLDEN PLATEAU rsonal use only Construction Construction underway Underway Mining Lease Granted 22 July 2026 Jun 26 MRE Drill hole Oct 26 MRE Drill hole

  15. Slide 15: Projects and Corporate

    PROJECTS AND CORPORATE rsonal use only

  16. Slide 16: Group Projects

    GROUP PROJECTS Base metals exploration at Jaguar rsonal use only Assays back from drill program testing 8 base metals anomalies Encouraging results including low level sulphide mineralisation and pathfinder elements returned from Ceberus, Atalanta, Hera and Panther prospects1 Downhole EM logging of

  17. Slide 17: Corporate

    CORPORATE Closing cash and receivables of $178.7 million after significant capital investment rsonal use only Jun 26 Sep 26 (A$ Million) QTR QTR Closing Cash 164.9 127.8 Receivables – Tritton 37.4 50.8 Useable Cash and Receivables 202.3 178.7

  18. Slide 18: Q1 cash flow

    CORPORATE Q1 cash flow ($ million) rsonal use only Note - Projects include, Stockman and Jaguar

  19. Slide 19: Aeris Resources

    AERIS RESOURCES Australian mid-tier, copper and gold rsonal use only producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu $/t)

  20. Slide 20: rsonal use only

    rsonal use only

  21. Slide 21: Appendix

    rsonal use only APPENDIX

  22. Slide 22: FY27 Guidance

    FY27 GUIDANCE Group FY27 Guidance FY26 Actual Tritton FY27 Guidance FY26 Actual rsonal use only Production Production Copper kt 22 - 27 23 Copper kt 22 - 27 23 Gold koz 42 - 51 49 Gold koz 8 - 10 8 Silver koz 130 - 160 256 Silver koz 100 - 130 229 Copper equivalent kt 37 - 46 42 Operating Costs Oper

Aeris Resources — Q1 FY27 Earnings Presentation on 6ix