Altoro Metals Limited · ASX:ARO

Altoro Metals — Variscan Mines — Investor Presentation (July 2021)

24 slides from Altoro Metals's investor presentation, Jul 15, 2021

  1. Slide 1: ASX Announcement – Investor Presentation Revised

    ASX Announcement – 15 July 2021 INVESTOR PRESENTATION REVISED TO INCLUDE ADDITIONAL DISLCOSURE Variscan Mines Limited (“Variscan” or the “Company” or the “Group”) (ASX:VAR) advises that on 21 June 2021 it released an Investor Presentation to the market. The presentation included two peer comparison

  2. Slide 2: Investor Webinar: San Jose Drilling Results Update

    Investor Webinar San Jose Drilling Results Update Revised 15 July 2021

  3. Slide 3: Disclaimer

    DISCLAIMER This document is for information purposes only. It is not a prospectus, disclosure document or offering document under Australian law or under any other law and does not constitute an offer or invitation to apply for securities. In particular, this presentation is not an offer of securiti

  4. Slide 4: Variscan in Cantabria

    VARISCAN IN CANTABRIA

  5. Slide 5: High Grade Spanish Zinc Projects

    HIGH GRADE SPANISH ZINC PROJECTS | ASX:VAR 4

  6. Slide 6: Novales-Udias Project – Cantabria, Northern Spain

    NOVALES-UDIAS PROJECT – CANTABRIA, NORTHERN SPAIN THICK HIGH GRADE MVT MINERALISATION SUPPORTIVE 9KM FROM REOCIN ZINC-LEAD SIGNIFICANT REGIONAL MINE DRILL RESULTS EXPLORATION UPSIDE GOVERNMENT & 62MT @ 8.7%ZN POLICIES GLENCORE SMELTER POTENTIAL MINE STRATEGIC SUPPLY DEEP WATER PORT STRONG MINING RE-

  7. Slide 7: Substantial Trends Delineated in Proven Mining District

    SUBSTANTIAL TRENDS DELINEATED IN PROVEN MINING DISTRICT | ASX:VAR 6

  8. Slide 8: San Jose Mine

    SAN JOSE MINE

  9. Slide 9: Exploration & Mining Licences Located on the Reocín Formation

    EXPLORATION & MINING LICENCES LOCATED ON THE REOCÍN FORMATION | ASX:VAR 8

  10. Slide 10: San Jose Mine – Historic Production (1970-1988)

    SAN JOSE MINE -– HISTORIC PRODUCTION (1970-1988) +9% Zn Avg. 6.3% Zn +3.3% Pb | ASX:VAR 9

  11. Slide 11: San Jose Mine – Putting in Context with Today

    SAN JOSE MINE – PUTTING IN CONTEXT WITH TODAY SAN JOSE COMPARABLE Zn-Pb HEAD GRADES TO WORLD CLASS CURRENT OPERATIONAL MINES 18.00% 16.00% 14.00% 12.00% Avg. 6.9% Zn 10.00% 8.00% 6.00% Avg. 2.3% Pb 4.00% 2.00% 0.00% Methodology: Avg. head grade from San Jose (1970-1998) plotted with most recent publ

  12. Slide 12: San Jose Mine - Local Infrastructure Is in Place

    SAN JOSE MINE - LOCAL INFRASTRUCTURE IS IN PLACE ROAD ACCESS OFFICE CORE SHACK ELECTRIC GRID CONNECTION WORKSHOP MINE ENTRANCE ROAD ACCESS | ASX:VAR 11

  13. Slide 13: 3D Laser Survey Showed Positive Drill Intersections Remaining

    3D LASER SURVEY SHOWED POSITIVE DRILL INTERSECTIONS REMAINING | ASX:VAR 12

  14. Slide 14: Drilling Campaign

    DRILLING CAMPAIGN

  15. Slide 15: Underground Drilling Results at La Caseta & 168-177 Trends

    UNDERGROUND DRILLING RESULTS AT LA CASETA & 168-177 TRENDS DDH NOVDD027: 16.9m @ 12.5% Zn + 2.0% Pb DDH NOVDD028: 15.6m @ 3.2% Zn + 0.3% Pb DDH NOVDD025: 7.0m @ 8.3% Zn + 0.1% Pb DDH NOVDD017: 5.0m @ 14.2% Zn + 4.3% Pb DDH NOVDD015: 5.0m @ 11.4% Zn + 2.8% Pb DDH NOVDD018: 5.0m @ 16.5% Zn + 1.7% Pb D

  16. Slide 16: Plan View of Selected Mineralised Intersections

    PLAN VIEW OF SELECTED MINERALISED INTERSECTIONS IN THE LA CASETA AND 168-177 TRENDS WITH MINERALISED TRENDS INDICATED | ASX:VAR 15

  17. Slide 17: N-S Long-Section of Underground Drilling at La Caseta

    N-S LONG-SECTION OF UNDERGROUND DRILLING AT LA CASETA DISCOVERY OF LOWER LENS | ASX:VAR 16

  18. Slide 18: Benchmarking vs. Recent ASX Reported Zinc Drilling Results

    BENCHMARKING VS. RECENT ASX REPORTED ZINC DRILLING RESULTS Varsican Mines Rumble Resources; Alta Zinc | ASX:VAR Source: Company ASX Announcements: VAR: 25 May 2021; RTR: 19 Apr 2021; AZI: 21 Apr 2021, 6 Apr 2021 17 Methodology: Bubble size calculated multiplying mean Zn grade by mineralised interval

  19. Slide 19: Underground Drilling Results at La Caseta

    UNDERGROUND DRILLING RESULTS AT LA CASETA DDH NOVDD046: 23m @ 11.51% Zn + 3.72% Pb DDH NOVDD041: 18m @ 9.87% Zn + 3.24% Pb DDH NOVDD037: 11m @ 9.95% Zn + 5.58% Pb DDH NOVDD029: 12m @ 9.15% Zn + 4.03% Pb DDH NOVDD040: 21m @ 5.65% Zn + 0.70% Pb DDH NOVDD042: 9m @ 10.67% Zn + 1.76% Pb DDH NOVDD045: 9m

  20. Slide 20: +400m Southward Extension of Discovery

    +400M SOUTHWARD EXTENSION OF DISCOVERY | ASX:VAR 19

  21. Slide 21: N-S Long Section of La Caseta – Lower Lens Strike Extended

    N-S LONG SECTION OF LA CASETA – LOWER LENS STRIKE EXTENDED | ASX:VAR 20

  22. Slide 22: Forthcoming Catalysts

    FORTHCOMING CATALYSTS San Jose Mine • Assays pending • Follow up Underground drilling • Selected step out surface drilling • Refine mineralization model Buenahora • Surface drilling permits pending • Exploration of underground workings • Reprocess historic seismic survey data Guarajaz • Mapping • Ge

  23. Slide 23: Stay Connected

    STAY CONNECTED CONTACT THE MANAGING DIRECTOR [email protected] +44 7799694195  +61 8 93169100  [email protected]  www.variscan.com.au Variscan Mines Limited Variscan Mines Cantabria, S.L. Suite 8, 7 The Esplanade Bo Ronaz, s/n Novales Mt Pleasant, Perth, WA 6153 39526 Alfoz de Ll

  24. Slide 24: | ASX:VAR

    | ASX:VAR 23

Variscan Mines — Investor Presentation (July 2021) on 6ix