Slide 1: A Clean Energy Company Corporate Presentation – February 2020
A Clean Energy Company Corporate Presentation – February 2020 ASX: PLL NASDAQ: PLL ABN 50 002 664 495
Slide 2: Executive Summary
Executive Summary PIEDMONT
Slide 3: Why Piedmont Lithium?
STRONGMARKET OUTLOOK Wave of electric vehicles coming to market36% annual growth projected for lithium hydroxideLarge investments in US and Europe battery supply chain IDEALPROJECT LOCATION World-class Carolina Tin-Spodumene Belt (“TSB”)60+ years of lithium processing on TSBAbundant infrastructure a
Slide 4: Lithium Demand Driven by Growth in Electric Vehicle Sales
Lithium Demand Driven by Growth in Electric Vehicle Sales 4 Source: Green Car Reports Source: EV Reports.com
Slide 5: It's Not Just Tesla…
It’s Not Just Tesla… 5 Hyundai Ionic Audi e-tron Ford F-150 VW ID.3 Porsche Taycan Mercedes EQC Jaguar I-Pace Mini Cooper EV Rivian SUV Porsche Taycan
Slide 6: …and It's Not Just Cars
…and It’s Not Just Cars 6 Rivian Trucks Proterra Buses Xos Semis Ampere Ferries
Slide 7: Hydroxide Taking Share and Supply Deficits are Looming
Hydroxide Taking Share and Supply Deficits are Looming 7 Source: Rodney Hooper / RK Equity forecasts. Carbonate Hydroxide Lithium hydroxide is required for the high-nickel cathode used in more energy-dense, longer-range batteries“Lithium extracted from mining for the future-relevant product ‘lithium
Slide 8: Piedmont Ideally Located in North Carolina…
Piedmont Ideally Located in North Carolina… # 1 State for Business 0%State Mining Royalties 23%Corporate Tax Rate ~100%Past Lithium Production 8
Slide 9: …in the Heart of 'Auto Alley'
9 …in the Heart of ‘Auto Alley’ Location drives lower costs and more sustainable supply chain
Slide 10: Location Drives Low Production Costs
10 Location Drives Low Production Costs
Slide 11: Low Costs Underpin Strong Project Economics
US$298 M(A$438 M)Run-rate EBITDA US$1.45 B(A$2.13 B)After-tax NPV 34%After-tax IRR 25Year Mine Life Low Costs Underpin Strong Project Economics 11 Source: Updated Scoping Study. Refer to the announcement dated August 7, 2019. Enlarged Mineral Resource Drives Improved Economics
Slide 12: Highly-Experienced Leadership Team
Technical Consultants Highly-Experienced Leadership Team Management Team Keith PhillipsManaging Director & CEO30+ Years Wall Street experience with JPMorgan, Merrill Lynch and Dahlman Rose Patrick BrindleVP – Project Management20+ years US and global engineering, procurement and construction experie
Slide 13: Hitting Milestones Should Drive Re-Rating in 2020
13 Hitting Milestones Should Drive Re-Rating in 2020 First-mover land package 55,000m drilling Large high-grade resource Robust scoping study Section 404 permit Hydroxide testwork Prefeasibility study Offtake agreements Definitive feasibility study Financing and construction Market Cap – US$mm
Slide 14: Corporate Snapshot
Corporate Snapshot Piedmont Lithium Limited Shares / ADRs (1 ADR = 100 Shares) 824.3 mm 8.24 mm Price (@ 2/7/20) A$0.13 US$8.25 Market Cap (@ 2/7/20) A$107 mm US$69 mm Cash (@ 12/31/19) A$17.1 mm US$11.4 mm Key Shareholders Australian Super 13.1% Fidelity 9.0% BNY Mellon (ADRs) 7.5% Officers and Dir
Slide 15: Lithium Markets
Lithium Markets PIEDMONT
Slide 16: EV Mega-Trend is Building Momentum
EV Mega-Trend is Building Momentum Source: Bloomberg New Energy Finance 16 World-leader VW all-in on EVsFocus on LiOH from spodumene“Mining is considered the future-proof solution, both commercially and in terms of sustainabilityEU CO2 penalties a catalystUS$39B exposure in 2021Mass market vehicles
Slide 17: Economics are the Key Driver of EV Demand
Economics are the Key Driver of EV Demand Tesla Model 3 Tesla Model 3 Source: Clean Technica and OEM websitesReflects New Jersey waiver of 6.625% state sales tax 17 TESLA MODEL 3 AUDI S4 CATEGORY Luxury sport sedan Luxury sport sedan 0-60 MPH 3.9 seconds 4.4 seconds RANGE 322 miles 420 miles PURCHAS
Slide 18: EU CO2 Emissions Penalties Spurring EV Development
EU CO2 Emissions Penalties Spurring EV Development 18 Source: Orocobre
Slide 19: Supply Curtailments Support Positive Market Outlook
Supply Curtailments Support Positive Market Outlook 19 Wodgina on care and maintenance; Kemerton delayed 9 months Mt. Holland deferred at least one year Stage 2 and 3 expansions deferred indefinitely Mt. Cattlin mine shutdown; Sal de Vida downsized Bald Hill on care and maintenance La Corne on care
Slide 20: USA is Favorable Jurisdiction vs. Leading Producers
USA is Favorable Jurisdiction vs. Leading Producers 40% royalties / social unrest / ‘war for water’ Kirchnerist politics / hyperinflation / export taxes High cost power and transport / labor shortages Imported raw materials / 16% VAT on re-exports Low costs and taxes / large market / critical materi
Slide 21: Recent Developments in the US Electric Vehicle Space
Recent Developments in the US Electric Vehicle Space 21 Nevada battery capacity to increase to 57 GWh and ‘Giga-Texas’ is rumored as next project Investing $600M to produce XC90 e-SUV and battery packs at Ridgeville, SC plant Joint venture to build $2.3B battery plant in Lordstown, OH Investing $2.7
Slide 22: Piedmont Positioned as a Domestic Supplier to the US EV Sector
Piedmont Positioned as a Domestic Supplier to the US EV Sector 22 Cathode Batteries Vehicles RawMaterials LithiumChemicals USA Import
Slide 23: Spodumene's Hydroxide Cost Advantage
Spodumene’s Hydroxide Cost Advantage 23 Source: McKinsey & Co., costs represent indicative 2025 costs for typical South American brine operations and typical Western Australian spodumene operations. Brine is typically lower cost for carbonate… …but spodumene is typically lower cost for hydroxide “Sp
Slide 24: Project Background Materials
Project Background Materials
Slide 25: High-Grade Mineral Resource
High-Grade Mineral Resource 27.9 Mt @ 1.11% Li2O764,000 tonnes of contained LCE100% of the lithium is attributable to spodumene mineralizationShallow open pits – 74% of resource within 100m of surface and 97% within 150mOpen along strike and at depth 25 One of North America’s Largest Hard-Rock Lithi
Slide 26: Vast Exploration Upside
Vast Exploration Upside 26 Large Areas of the Carolina Tin-Spodumene Belt Remain Unexplored Current Exploration Target Core Property Tonnes (Mt) Grade (Li2O%) 4.0-4.5 1.0-1.2 Central Property Tonnes (Mt) Grade (Li2O%) 2.0-2.5 1.1-1.3 Total Tonnes (Mt) Grade (Li2O%) 6.0-7.0 1.0-1.3 *The potential qua
Slide 27: Unique "Spodumene-Only" Mineralogy
Unique “Spodumene-Only” Mineralogy 27 “The first question an investor should ask a hard-rock lithium CEO is “how much of the lithium reports to spodumene?” – Jon Hykawy , PhD – President, Stormcrow Capital XRD analysis confirms pure spodumene nature of Piedmont’s ore bodyAbsence of petalite and lepi
Slide 28: Strong Metallurgical Recoveries
Strong Metallurgical Recoveries Recovered Grade 28 Resource Grade of 1.11% Li2O+ Exceptional Metallurgical Recoveries‘Spodumene-only’ mineralogyAbundant clean process water50+ years of precedent on TSBBench scale testwork results= Leading ‘Recovered Grade’Bench-Scale LiOH Testwork in Progress
Slide 29: By-Product Industrial Minerals Provide Strong Credit
Quartz Solar Panel Glass Quartz Composites Technical Glass Feldspar Architectural Glass Industrial Ceramics Coatings Mica Cosmetics Automotive Paints Welding Rods By-Product Industrial Minerals Provide Strong Credit 29
Slide 30: Disclaimers Cautionary Statements and Important Information
Disclaimers Cautionary Statements and Important InformationThis presentation does not constitute or form part of any offer to sell, or solicitation of any offer to buy, any securities in the United States or any other country. This presentation may not form the basis of any contract or commitment wh
Slide 31: A Clean Energy Company Piedmont Lithium Limited
A Clean Energy Company Piedmont Lithium Limited Corporate Presentation – February 2020 Keith D. Phillips – President and CEO +1 973 809 0505 [email protected] Exploration Office5706 Dallas-Cherryville Hwy. 279 | Bessemer City | NC 28016| USA www.piedmontlithium.com Registered Office28 Th