American Electric Power Company, Inc. · NASDAQ:AEP

American Electric Power — Debt Investor Presentation (May 2006)

93 slides from American Electric Power's debt investor presentation, May 16, 2006

  1. Slide 1: American Electric Power Fixed Income Investor Meeting

    AMERICAN ELECTRIC POWER FIXED INCOME INVESTOR MEETING CHICAGO, IL MAY 16, 2006 p. 1

  2. Slide 2: Forecast Horizon and Assumptions: Safe Harbor Statement

    Forecast Horizon and Assumptions “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements, which are subject to risks and uncertainties. These factors include electric load and customer growth; weather conditions, includ

  3. Slide 3: Susan Tomasky, EVP & Chief Financial Officer

    Forecast Horizon and Assumptions Susan Tomasky Executive Vice President & Chief Financial Officer p. 3

  4. Slide 4: Capital Investment Forecast

    Forecast Horizon Capital andForecast Investment Assumptions Capital Investment Forecast excluding AFUDC $3,723MM $3,611MM $3,538MM $4,000 MM $3,500 MM $3,000 MM $2,500 MM $2,000 MM New Build Generation & $1,500 MM Ongoing Infrastructure $1,000 MM Replacement investment can be $500 MM throttled $0 MM

  5. Slide 5: New Generation

    Forecast Horizon and Assumptions New Generation IGCC PSO RFPs SWEPCO RFPs ¾ Expect to obtain ¾ Submitted RFPs ¾ Submitted RFPs permits and finalize totaling 900 totaling 2,100 engineering by 2007 megawatts of megawatts of ¾ Construction of 600 baseload and baseload, megawatt facility to peaking capa

  6. Slide 6: Forecast Horizon and Funding Assumptions

    Forecast CapitalHorizon and Funding Investment Assumptions Actual Projection ($ in millions) 2004 2005 2006 2007 2008 Planned Capital Investment, excluding AFUDC Committed Construction Expenditures * $ (1,671) $ (2,499) $ (2,181) $ (1,633) $ (1,045) Discretionary Cap Ex Predicated on Rate Recovery &

  7. Slide 7: Environmental Investment

    Forecast $4.1 BillionHorizon and Assumptions Environmental Investment Projected Environmental Environmental Capital Investment* Investment Allocation Other 2004** $299 Kentucky 4% Power Co. 8% 2005** $703 Ohio Power & CSP 2006 $1,455 48% 2007 $1,001 2008 $426 2009 $215 2010 $19 Appalachian Power Co.

  8. Slide 8: Low Cost Production Supports Investment

    Low Cost Production Supports Investment & Forecast Horizon and Assumptions Investment Sustains Low Cost Production ¾ Lowers exposure to high cost emission Typical Pulverized Coal Plant allowances Comparison of Variable Production Cost Pre- and Post- FGD/SCR (future view)* ¾ Creates opportunity to bu

  9. Slide 9: Regulatory Activity Underway

    Forecast Horizon Regulatory andUnderway Activity Assumptions ¾ TCC Stranded Cost Recovery True-up Filing – Final Order Issued ¾ Ohio Companies filing for pass through of FERC OATT changes ¾ Indiana Depreciation Petition ¾ APCo General Rate Case Filing in Virginia ¾ APCo Filing for Recovery of E&R Co

  10. Slide 10: Texas Regulatory Activity

    Forecast Horizon Texas andActivity Regulatory Assumptions TCC Stranded Cost Recovery Case ¾ February 16, 2006 – PUCT final order provides for net true-up of $1.475 billion ¾ March 3, 2006 – Requested approval of financing order to issue $1.8 billion in low-cost securitization bonds – Final order exp

  11. Slide 11: Regulatory Activity Underway

    Forecast Horizon Regulatory andUnderway Activity Assumptions Ohio Companies Pass through of FERC OATT Changes Filed Feb 3, 2006 - Seeking authority to pass through to customers the changes in the FERC OATT related to the elimination of the SECA revenues and the costs associated with the Wyoming-Jack

  12. Slide 12: Regulatory Activity Underway

    Forecast Horizon Regulatory andUnderway Activity Assumptions Appalachian Power - Virginia E&R & General Rate Case Activity Virginia E & R Cost Recovery Factor - Filed July 1, 2005 - Seeking recovery of $62.1 Million in new Environmental & Reliability costs ¾ Oct 14, 2005 – SCC ruled VA law does not

  13. Slide 13: IGCC Regulatory Activity

    Forecast IGCCHorizon andActivity Regulatory Assumptions Ohio - Cost Recovery Filing Ohio Next Steps 2006: Phase 1 – PUCO AUTHORIZED ¾ Secure cost recovery plan ¾ Effective during 2006 – April 10, 2006 – PUCO authorized ¾ Seeks recovery of initial costs, including those implementation of Phase 1 Rate

  14. Slide 14: Regulatory Activity Completed

    Forecast Horizon Regulatory andCompleted Activity Assumptions Ohio – Rate Stabilization Plan (2006 – 2008) ¾ Annual 3% and 7% generation rate increases at CSP & OP, respectively ¾ POLR rate rider for environmental additions ¾ Ability to request additional 4% annual increase in generation rate ¾ Elim

  15. Slide 15: Steve Smith, SVP & Treasurer

    Forecast Horizon and Assumptions Steve Smith Senior Vice President & Treasurer p. 15

  16. Slide 16: Projected Capital Expenditures by Company

    Forecast Horizon Forecasted Capitaland Assumptions Expenditures Company 2006 2007 2008 (in thousands) AEP SYSTEM* $3,722,600 $3,611,400 $3,537,700 AEGCo $14,300 $30,000 $39,700 APCo $942,800 $691,500 $751,700 CSPCo $342,700 $473,700 $553,400 I&M $311,200 $278,700 $262,000 KPCo $100,000 $127,100 $144

  17. Slide 17: Long-Term Debt Maturity Profile

    Forecast Horizon Long-Term and Assumptions Debt Maturity Profile(1) (3) Year 2006 2007 2008 AEP Service Corporation $ 2,000,000 (2) $ 2,000,000 (2) $ 34,000,000 AEP Inc. $ 395,860,000 $ 345,000,000 $ - AEP Generating Company $ - $ - $ - Appalachian Power $ - $ 342,500,000 $ 200,000,000 Columbus Sout

  18. Slide 18: 2006 Key Operating Company Highlights

    Forecast 2006 HorizonCompany Key Operating and Assumptions Highlights (in millions) Dependent on Actual Capital Investment Projected Capital Target Equity Company Expenditures Projected Issuances Ratio $500 - $600 APCO $943 (completed*) 42-45% CSP $343 $100 - $150 44-48% I&M $311 $400 - $500 38-42%

  19. Slide 19: Long-Term Debt Guidelines

    Forecast Horizon Long-Term and Debt Assumptions Guidelines Issuers: ¾ Issue at operating companies. Size: ¾ Make transactions index eligible if possible. ¾ When possible, issue a size sufficient for competitive execution. Maturity: ¾ Issue maturities for which the market has appetite. ¾ Achieve weig

  20. Slide 20: Appendix

    Forecast Horizon and Assumptions APPENDIX p. 20

  21. Slide 21: Credit Ratings

    Forecast Horizon and Assumptions Credit Ratings Current Ratings for AEP, Inc & Subsidiaries Moody’s S&P Fitch Senior Senior Business Senior Senior Senior Senior Company Unsecured Secured Outlook profile Unsecured Secured Outlook Unsecured Secured Outlook AEP, Inc. Baa2 - S 6 BBB - S BBB - S AEP, Inc

  22. Slide 22: Capital Investment

    Forecast Capital Horizon and Investment Assumptions 2004 - 2006 2004 Actual Totaled $1.6 Billion 2005 Actual Totaled $2.5 Billion (see note below ) $100 MM $7 MM Transmission $79 MM $9 MM $230 MM Transmission $392 MM $373 MM Distribution $164 MM Distribution Environmental Environmental $65 MM $259 M

  23. Slide 23: Environmental Compliance Investment

    Forecast Horizon Environmental and Assumptions Compliance Investment Compliance Allocation Current Programs $2.0 Billion: $135 MM $578 MM $0.5 Billion for NOx $1.5 Billion for SO2 Future Programs $3,405 MM $2.1 Billion: $1.9 Billion for SO2 $0.2 Billion for Other NOx Compliance SO2 Compliance Mercur

  24. Slide 24: 2006 Projected Cash Flow

    Forecast 2006 Horizon Projectedand CashAssumptions Flow ($ in millions) 2005 2006 Actual Guidance * Beginning Cash Balance $ 320 $ 401 Cash from Operations: Income from Continuing Operations 787 1,023 Depreciation and Amortization 1,318 1,363 Pension Funding in Excess of Expense (626) (126) Extraord

  25. Slide 25: Capital Structure

    Forecast Capital Horizon and Assumptions Structure Capital Structure Actual 12/31/2005 Actual 3/31/2006 Debt Equity Total Debt Equity Total Balance Sheet Capitalization Long-term Debt 12,226 - 12,226 12,142 - 12,142 Short-term Debt 10 - 10 226 - 226 Preferred Stock Subject to Mandatory Redemption -

  26. Slide 26: Debt Schedules

    Forecast Debt Horizon and Assumptions Schedules American Electric Power Service Corp Series Interest Maturity Amount Notes Payable 9.600% 12/15/2008 $38,000,000 American Electric Power Inc Series Interest Maturity Amount Senior Notes 4.709% 08/16/2007 $345,000,000 Senior Notes 6.125% 05/15/2006 $395

  27. Slide 27: Debt Schedules

    Forecast Debt Horizon and Assumptions Schedules AEP Texas Central* AEP Texas North Series Interest Maturity Amount Series Interest Maturity Amount First Mortgage Bond 7.125% 02/01/2008 $18,581,000 First Mortgage Bond 7.750% 06/01/2007 $8,151,000 Pollution Control Bond 4.550% 11/01/2029 $100,635,000

  28. Slide 28: Debt Schedules

    Forecast Debt Horizon and Assumptions Schedules Appalachian Power Company Columbus Southern Power Series Interest Maturity Amount Series Interest Maturity Amount Pollution Control Bond 2.800% 05/01/2019 $30,000,000 Pollution Control Bond Floating 08/01/2020 $48,550,000 Pollution Control Bond 2.700%

  29. Slide 29: Debt Schedules

    Forecast Debt Horizon and Assumptions Schedules Indiana Michigan Power Company Kentucky Power Series Interest Maturity Amount Series Interest Maturity Amount Pollution Control Bond 2.625% 10/01/2019 $25,000,000 Senior Notes 5.500% 07/01/2007 $125,000,000 Pollution Control Bond 2.625% 04/01/2025 $40,

  30. Slide 30: Debt Schedules

    Forecast Debt Horizon and Assumptions Schedules Ohio Power Company Public Service Company of Oklahoma Series Interest Maturity Amount Series Interest Maturity Amount Pollution Control Bond Floating 07/01/2014 $50,000,000 Pollution Control Bond Floating 06/01/2014 $33,700,000 Pollution Control Bond F

  31. Slide 31: Debt Schedules

    Forecast Debt Horizon and Assumptions Schedules Southwestern Electric Power Company Series Interest Maturity Amount Notes Payable 4.470% 04/23/2011 $24,974,947 Notes Payable Floating 06/30/2008 $12,538,117 Notes Payable 6.360% 02/22/2007 $4,000,000 Notes Payable 7.030% 02/22/2012 $20,000,000 First M

  32. Slide 32: Summary of Major 2006 Financial Performance Drivers

    Forecast Summary Horizon of Major andPerformance 2006 Financial Assumptions Drivers ¾ Load Growth of 2.5% ¾ $500MM rate recovery assured or in progress ¾ Rising fuel costs of 11-13% ¾ Higher planned outages, increased retail load and sale of TCC generation to impact off system sales ¾ Decline in uti

  33. Slide 33: 2006 Earnings Guidance

    2006Forecast Earnings Horizon Guidanceand Assumptions Range: $2.50 - $2.70 p. 33

  34. Slide 34: Coal Procurement

    Forecast Coal Horizon and Assumptions Procurement Total AEP System AEP Eastern System PRB & Other Northern Northern 18% Appalachia Appalachia Central 24% 32% Appalachia 37% Central Powder River Appalachia Basin & Others 39% 50% Coal Supply (on average) AEP Western System Lignite ¾ Purchase 75 MM ton

  35. Slide 35: Fuel Recovery

    Forecast Horizon and Assumptions Fuel Recovery AEP System Off System Sales Counterparties 25% Customer 55% Shareholder 20% Fuel Cost Recovery (on average) ¾ Fuel recovery varies by jurisdiction ¾ 80% of fuel cost is recoverable across the AEP System ¾ Active Fuel Clause Jurisdictions: – AEP EAST: AP

  36. Slide 36: Jurisdictional Fuel Clause Summary

    Forecast Horizon Jurisdictional Fuel and Assumptions Clause Summary STATE FUEL CLAUSE ADJUSTMENT FREQUENCY Arkansas Yes Monthly Indiana Yes Capped at increasing rates through June 30, 2007 Kentucky Yes Monthly Louisiana Yes Monthly Michigan Yes Annually Ohio No Although there is no recovery mechanis

  37. Slide 37: Rate Case Summary Information

    Forecast SummaryHorizon andInformation Rate Case Assumptions West Virginia Base Case Rate Filing On August 26, 2005, Appalachian Power Co. and Wheeling Power Co. filed an application with the West Virginia Public Service Commission (WVPSC) to increase electric rates and charges, a request for the re

  38. Slide 38: Rate Case Summary Information

    Forecast SummaryHorizon andInformation Rate Case Assumptions Virginia E&R Factor Filing On July 1, 2005, Appalachian Power Co. filed a request with the Virginia SCC to recover incremental actual and projected costs for environmental compliance and T&D System reliability in the amount of $62.1MM. The

  39. Slide 39: What AEP Offers

    Forecast Horizon and What AEP Assumptions Offers Utility Operations: The Platform for Growth & Financial Strength 1 Strength and scale in assets and operations 2 Focused utility business model 3 Earnings growth driven by native load & capital investment 4 Pioneering advanced technologies in the sect

  40. Slide 40: Strength & Scale in Assets & Operations

    Forecast Strength Horizon & Scale and Assumptions in Assets & Operations Utility Operations: The Platform for Growth Generation* 35,600 MW capacity Transmission 39,000 miles Distribution 205,483 miles Customers 5 million * Figures do not include mothballed or decommissioned units (1,015 MW of capaci

  41. Slide 41: Where We Operate

    ForecastWhere Horizon We and Assumptions Operate Ohio West Virginia Virginia Indiana Michigan Kentucky Tennessee Texas Oklahoma 250 MW transmission line connects AEP East & Arkansas AEP West territories Louisiana p. 41

  42. Slide 42: AEP Interstate Project

    Forecast AEPHorizon and Interstate Assumptions Project ¾ Line connects AEP’s Amos 765 kV station to Allegheny Power’s Doubs 500 kV station in DEANS Maryland, and terminates at PSEG’s Deans 500 kV station in New Jersey ¾ Total line length is approximately 550 miles ¾ Will improve power transfer capab

  43. Slide 43: Domestic Generation Fleet

    Forecast Horizon Domestic and Assumptions Generation Fleet Capacity by NERC Region Capacity by Fuel Mix Pumped Nuclear Storage/Wind/Hydro SPP 3% 6% 24% Natural Gas/ Oil 19% ERCOT 3% Coal/Lignite ECAR 72% 73% Does not sum to 100% due to rounding Operating Statistics Commercial Availability Factor Cap

  44. Slide 44: Coal Delivery

    Forecast Horizon and Assumptions Coal Delivery Total AEP System AEP Eastern System DELIVERY MODE DIVERSITY 2005 Actual Belt 2005 Actual Truck 3% 12% Belt Rail Direct 8% 33% Truck Rail/ 9% Barge* Rail Direct 19% 43% Rail/ Barge* 15% Barge Direct 33% AEP Western System 2005 Actual Barge Direct Belt 25

  45. Slide 45: AEP's Coal Transportation Assets

    Forecast Horizon AEP’s Coal and Assumptions Transportation Assets Coal Transportation to AEP AEP’s substantial coal Plants* transportation assets include: 2005 Actual ¾7,065 railcars ¾2,318 barges 20% ¾53 towboats ¾1 active coal handling terminal 80% (20 million tons of annual capacity) AEP-owned As

  46. Slide 46: Investing in IGCC

    ForecastInvesting HorizonInand Assumptions IGCC Generation Technology Comparative Statistics PC IGCC NGCC Nominal Capacity (MW) 600 600 600 Heat Rate (Btu/kWh) 8700 8600 7200 Total Plant Cost (EPC) ($/kW) 1700 1900 480 Production Cost ($/MWh) 17 16 57 Cost of Electricity, without CO2 Capture ($/MWh)

  47. Slide 47: AEP Texas Central Company

    Forecast AEP TexasHorizon Centraland Assumptions Company President and Chief Operating Officer: Charles Patton AEP Texas Central Company (TCC) (organized in Texas in 1945) is engaged in the generation (to an extremely limited extent), transmission and sale of power to affiliated and non-affiliated e

  48. Slide 48: AEP Texas Central Company Capital Structure

    AEP Texas Horizon Forecast Centraland Company Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 2,291,625 1,214,989 3,506,614 1,907,505 1,274,583 3,182,088 1,935,576 953,570 2,889,146 %

  49. Slide 49: AEP Texas Central Major Customers

    AEP Texas Forecast Central Horizon andCompany Assumptions AEP TEXAS CENTRAL MAJOR CUSTOMERS • Top 10 customers = 67% of industrial sales* ($) Valero Energy Corporation Koch Industries, Inc. • Metropolitan areas account for 78% ultimate sales Air Liquide America, LP • 53 persons per square mile (U.S.

  50. Slide 50: Regulatory Information: Public Utility Commission of Texas

    Regulatory Information Forecast Horizon and Assumptions Public Utility Commission of Texas (PUCT) AEP Regulated Electric Utilities Texas Central Company Texas North Company Southwestern Electric Power Company Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R:3 Qu

  51. Slide 51: AEP Texas North Company

    AEP TexasHorizon Forecast North and Company Assumptions President and Chief Operating Officer: Charles Patton AEP Texas North Company (TNC) (organized in Texas in 1927) is engaged in the generation, transmission and sale of power to affiliated and non-affiliated entities and the distribution of elec

  52. Slide 52: AEP Texas North Company Capital Structure

    AEP Texas Horizon Forecast North Company and Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 356,754 240,632 597,386 314,357 312,777 627,134 276,845 316,275 593,120 % of Capitalizatio

  53. Slide 53: AEP Texas North Major Customers

    Forecast AEP TexasHorizon and Assumptions North Company AEP TEXAS NORTH MAJOR CUSTOMERS Chevron Texaco Corporation Kinder Morgan • Top 10 customers = 32% industrial sales* ($) Occidental Permian Ltd. • Metropolitan areas account for 59% ultimate sales Crown Cork & Seal Co., Inc Rhodia Inc. • 8 perso

  54. Slide 54: Regulatory Information: Public Utility Commission of Texas

    Regulatory Information Forecast Horizon and Assumptions Public Utility Commission of Texas (PUCT) AEP Regulated Electric Utilities Texas Central Company Texas North Company Southwestern Electric Power Company Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R: 3 Q

  55. Slide 55: Appalachian Power

    Forecast Horizon Appalachian Powerand Assumptions President and Chief Operating Officer: Dana Waldo Appalachian Power Company (APCo) (organized in Virginia in 1926) is engaged in the generation, transmission and distribution of electric power to approximately 942,000 retail customers in the southwes

  56. Slide 56: Appalachian Power Capital Structure

    Forecast Horizon Appalachian Powerand Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 1,947,075 1,360,131 3,307,206 1,995,658 1,427,502 3,423,160 2,345,511 1,821,484 4,166,995 % of Ca

  57. Slide 57: Appalachian Power Generation Production Statistics

    Forecast Horizon Appalachian Powerand Assumptions APCo Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three Year Average MWh Produced 32,901,943 29,551,752 32,949,364 31,801,020 Coal Consumption (tons burned) 13,015,569 11,604,352 13,187,986 12,602,636 Operating Inform

  58. Slide 58: Appalachian Power Bill Comparison and Major Customers

    Appalachian Power Forecast Horizon and Assumptions APPALACHIAN AREA UTILITIES TYPICAL BILL COMPARISON* West Virginia Customers West Virginia Virginia APCo 433,615 APCo 55.28 APCo 57.80 Allegheny 485,295 AEP – Wheeling 57.91 ODPCo 58.07 Allegheny 70.09 Dominion Virginia 87.18 Virginia Customers Conec

  59. Slide 59: Regulatory Information: Public Service Commission of West Virginia

    Regulatory Information Forecast Horizon and Assumptions Public Service Commission of West Virginia AEP Regulated Electric Utilities Wheeling Power Co. Appalachian Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup R: 1 D: 2 Qualifications for Commissioners

  60. Slide 60: Regulatory Information: Virginia State Corporation Commission

    Forecast Horizon Regulatory and Assumptions Information Virginia State Corporation Commission AEP Regulated Electric Utilities Appalachian Power Co. Commissioners Number: 3 Appointed/Elected: Elected Term: 6 years Political Makeup: R: 2 D: 1 Qualifications for Commissioners The Virginia State Corpor

  61. Slide 61: Columbus Southern Power

    Forecast Horizon Columbus andPower Southern Assumptions President and Chief Operating Officer: Kevin Walker Columbus Southern Power Company (CSPCo) (organized in Ohio in 1937, the earliest direct predecessor company having been organized in 1883) is engaged in the generation, transmission and distri

  62. Slide 62: Columbus Southern Power Capital Structure

    Forecast Horizon Columbus andPower Southern Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 904,081 897,881 1,801,962 987,626 898,650 1,886,276 1,214,529 981,546 2,196,075 % of Capita

  63. Slide 63: Columbus Southern Generation Production Statistics

    Forecast Horizon Columbus andPower Southern Assumptions Columbus Southern Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three Year Average MWh Produced 15,243,711 14,049,095 14,038,045 14,443,617 Coal Consumption (tons burned) 6,526,167 6,121,275 6,048,060 6,231,834 O

  64. Slide 64: Ohio Utilities Bill Comparison and Major Customers

    Forecast Horizon Columbus andPower Southern Assumptions OHIO UTILITIES TYPICAL BILL COMPARISON* Ohio Customers Ohio AEP Ohio* 1,408,846 AEP (OPCo) 63.41 AEP (CSP) 75.35 First Energy** 1,099,919 Cinergy (CG&E) 79.64 Cinergy (CG&E) 647,329 DP&L 91.12 DP&L 506,608 FE (CEI) 113.19 FE (Toledo Ed) 115.70

  65. Slide 65: Regulatory Information: Ohio Public Utilities Commission

    Regulatory Information Forecast Horizon and Assumptions Ohio Public Utilities Commission AEP Regulated Electric Utilities Columbus Southern Power Co. Ohio Power Co. Commissioners Number: 5 Appointed/Elected: Appointed Term: 5 years Political Makeup: R: 3 D: 0 I: 2 Qualifications for Commissioners Fi

  66. Slide 66: Indiana Michigan Power

    Forecast Indiana Horizon Power Michigan and Assumptions President and Chief Operating Officer: Marsha Ryan Indiana Michigan Power Company (I&M) (organized in Indiana in 1925) is engaged in the generation, transmission and distribution of electric power to approximately 581,000 retail customers in no

  67. Slide 67: Indiana Michigan Power Capital Structure

    Forecast Indiana Horizon and Michigan Assumptions Power CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 1,438,181 1,149,593 2,587,774 1,374,288 1,099,582 2,473,870 1,538,642 1,228,176 2,766,818 %

  68. Slide 68: I&M Generation Production Statistics

    Forecast Indiana Horizon and Michigan Assumptions Power I&M Generation Production Statistics – 2003 – 2005 Production Stat 2003 2004 2005 Three-Year Avg. MWh Produced 28,075,125 21,258,001 31,535,226 26,956,117 Coal Consumption (tons burned) 7,189,655 7,186,066 7,011,370 7,129,030 Operating Informat

  69. Slide 69: Indiana & Michigan Bill Comparison and Major Customers

    Indiana Michigan Forecast Power Horizon and Assumptions INDIANA & MICHIGAN UTILITIES TYPICAL BILL COMPARISON* Indiana Customers Indiana Michigan I&M 452,050 I&M 68.94 I&M 61.43 IP & L 458,796 IP & L 70.50 Consumers Energy 82.97 NIPSCO 442,554 Cinergy (PSI) 79.53 Detroit Edison 93.80 Cinergy (PSI) 74

  70. Slide 70: Regulatory Information: Indiana Utility Regulatory Commission

    Regulatory Information Forecast Horizon and Assumptions Indiana Utility Regulatory Commission AEP Regulated Electric Utilities Indiana Michigan Power Co. Commissioners Number: 5 Appointed/Elected: Appointed Term: 4 years Political Makeup: R:3 D: 2 Qualifications for Commissioners Five members, appoi

  71. Slide 71: Regulatory Information: Michigan Public Service Commission

    Forecast Horizon Regulatory and Assumptions Information Michigan Public Service Commission AEP Regulated Electric Utilities Indiana Michigan Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R :1 D: 2 Qualifications for Commissioners The Michigan Public S

  72. Slide 72: Kentucky Power

    Kentucky ForecastPower Horizon and Assumptions President and Chief Operating Officer: Tim Mosher Kentucky Power Company (KPCo) (organized in Kentucky in 1919) is engaged in the generation, transmission and distribution of electric power to approximately Total Customers: 176,000 retail customers in a

  73. Slide 73: Kentucky Power Capital Structure

    Kentucky Power and Assumptions Forecast Horizon CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 525,698 317,138 842,836 508,310 320,980 829,290 493,030 347,841 840,871 % of Capitalization Per Bal

  74. Slide 74: Kentucky Power Generation Production Statistics

    Kentucky Power and Assumptions Forecast Horizon Kentucky Power Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three-Year Average MWh Produced 6,170,931 6,550,509 7,345,624 6,689,021 Coal Consumption (tons burned) 2,513,524 2,607,559 2,926,253 2,682,445 Operating Inform

  75. Slide 75: Kentucky Power Bill Comparison and Major Customers

    Kentucky Power and Assumptions Forecast Horizon KENTUCKY POWER UTILITIES TYPICAL BILL COMPARISON* Kentucky Customers Kentucky KPCo 174,631 KPCo 59.78 Kentucky Utilities 485,627 Kentucky Utilities 62.40 LG & E 389,196 LG&E 66.31 CIN 68.54 KENTUCKY POWER MAJOR CUSTOMERS * Typical bills are displayed i

  76. Slide 76: Regulatory Information: Kentucky Public Service Commission

    Regulatory Information Forecast Horizon and Assumptions Kentucky Public Service Commission AEP Regulated Electric Utilities Kentucky Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 4 years Political Makeup: R: 3 Qualifications for Commissioners Three members, appointed by the go

  77. Slide 77: Ohio Power

    Forecast Ohio PowerHorizon and Assumptions President and Chief Operating Officer: Kevin Walker Ohio Power Company (OPCo) (organized in Ohio in 1907 and re-incorporated in 1924) is engaged in the generation, transmission and distribution of electric power to approximately 710,000 retail customers in

  78. Slide 78: Ohio Power Capital Structure

    Forecast Ohio PowerHorizon and Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 2,082,195 1,487,920 3,570,115 2,053,641 1,490,479 3,544,120 2,280,107 1,784,586 4,064,693 % of Capitaliz

  79. Slide 79: Ohio Power Generation Production Statistics

    Forecast Ohio PowerHorizon and Assumptions Ohio Power Generation Production Statistics – 2002 - 2004 Production Stat 2003 2004 2005 Three Year Average MWh Produced 53,099,905 52,156,749 52,080,585 52,445,746 Coal Consumption (tons burned) 20,936,936 20,534,361 20,382,116 20,617,804 Operating Informa

  80. Slide 80: Ohio Utilities Bill Comparison and Major Customers

    Forecast Ohio PowerHorizon and Assumptions OHIO UTILITIES Ohio Customers TYPICAL BILL COMPARISON* AEP Ohio* 1,408,846 Ohio AEP (OPCo) 63.41 First Energy** 1,099,919 AEP (CSP) 75.35 Cinergy (CG&E) 647,329 Cinergy (CG&E) 79.64 DP&L 506,608 DP&L 91.12 Monongahela Power*** 29,196 FE (CEI) 113.19 FE (Tol

  81. Slide 81: Regulatory Information: Ohio Public Utilities Commission

    Regulatory Information Forecast Horizon and Assumptions Ohio Public Utilities Commission AEP Regulated Electric Utilities Columbus Southern Power Co. Ohio Power Co. Commissioners Number: 5 Appointed/Elected: Appointed Term: 5 years Political Makeup: R: 3 D: 0 I: 2 Qualifications for Commissioners Fi

  82. Slide 82: Public Service Company of Oklahoma

    Public Service Forecast Company Horizon and of Oklahoma Assumptions President and Chief Operating Officer: Stuart Solomon Public Service Company of Oklahoma (PSO) (organized in Oklahoma in 1913) is engaged in the generation, transmission and distribution of electric power to approximately 514,000 re

  83. Slide 83: Public Service Company of Oklahoma Capital Structure

    Public Service Forecast Company Horizon and of Oklahoma Assumptions CAPITAL STRUCTURE (thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 607,162 488,275 1,095,437 601,095 534,517 1,135,612 646,954 553,858 1,200,812 % of

  84. Slide 84: PSO Generation Production Statistics

    Public Service Forecast Company Horizon and of Oklahoma Assumptions Public Service Company of Oklahoma Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three-Year Average MWh Produced 14,845,846 12,512,486 15,375,848 14,244,727 Coal Consumption (tons burned) 4,678,950 4,

  85. Slide 85: PSO Bill Comparison and Major Customers

    Public Service Forecast Company Horizon and of Oklahoma Assumptions PUBLIC SERVICE COMPANY OF OKLAHOMA UTILITIES TYPICAL BILL COMPARISON* Oklahoma Customers Oklahoma PSO 507,214 OG&E 73.33 OG&E 668,766 PSO 74.20 SPSCo 82.52 PUBLIC SERVICE COMPANY OF OKLAHOMA Empire District 85.25 MAJOR CUSTOMERS * T

  86. Slide 86: Regulatory Information: Oklahoma Corporation Commission

    Regulatory Information Forecast Horizon and Assumptions Oklahoma Corporation Commission AEP Regulated Electric Utilities Public Service Company of Oklahoma Commissioners Number: 3 Appointed / Elected: Elected Term: 6 years Political Makeup: R: 3 Qualifications for Commissioners The Oklahoma Corporat

  87. Slide 87: Southwestern Electric Power

    Forecast Horizon Southwestern and Assumptions Electric Power President and Chief Operating Officer: Nick Akins Southwestern Electric Power Company (SWEPCo) (organized in Delaware in 1912) is engaged in the generation, transmission and distribution of electric power to approximately 450,000 retail cu

  88. Slide 88: Southwestern Electric Power Capital Structure

    Forecast Horizon Southwestern and Assumptions Electric Power CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 890,675 701,360 1,592,035 806,494 773,318 1,579,812 774,245 787,077 1,561,322 % of Cap

  89. Slide 89: SWEPCO Generation Production Statistics

    Southwestern Electric Forecast Horizon Power and Assumptions Southwestern Electric Power Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three-Year Average MWh Produced 20,539,365 20,071,578 20,167,754 20,259,566 Coal Consumption (tons burned) 12,536,179 13,032,475 12,4

  90. Slide 90: SWEPCO Bill Comparison and Major Customers

    Forecast Horizon Southwestern and Assumptions Electric Power SOUTHWESTERN ELECTRIC TYPICAL BILL COMPARISON* POWER UTILITIES Arkansas Louisiana Texas Arkansas Customers SWEPCO 66.15 SWEPCO 68.83 SWEPCO 63.95 SWEPCO 107,220 OG&E 72.11 CLECO 90.13 SPSCo 83.19 Entergy AR 667,714 Empire District 74.71 En

  91. Slide 91: Regulatory Information: Arkansas Public Service Commission

    Regulatory Information Forecast Horizon and Assumptions Arkansas Public Service Commission AEP Regulated Electric Utilities Southwestern Electric Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R: 3 Qualifications for Commissioners The Arkansas Public S

  92. Slide 92: Regulatory Information: Louisiana Public Service Commission

    Regulatory Information Forecast Horizon and Assumptions Louisiana Public Service Commission AEP Regulated Electric Utilities Southwestern Electric Power Co. Commissioners Number: 5 Appointed/Elected: Elected Term: 6 years Political Makeup: R: 2 D: 3 Qualifications for Commissioners The Louisiana Pub

  93. Slide 93: Regulatory Information: Public Utility Commission of Texas

    Regulatory Information Forecast Horizon and Assumptions Public Utility Commission of Texas (PUCT) AEP Regulated Electric Utilities Texas Central Company Texas North Company Southwestern Electric Power Company Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R:3 Qu