    1Q2026 Corporate Presentation JUNE 2026 Since 1981 PMW INTERNATIONAL BERHAD Integrated Infrastructure Solutions Provider Listed on ACE Market, Bursa Malaysia ACE Market since 18 Nov 2025 | Stock Code: 0379 | Shariah-Compliant | Industrial Products and Services pmw-group.com

  2. Slide 2: Company & Business Overview

    COMPANY & BUSINESS qe: OVERVIEW Transmission Telecommunication Monopoie | Catenary Pole Lightings Solutions (Solar & LED) be Underground Manhole

  3. Slide 3: PMW at a Glance

    PMW at a Glance End-use applications 1) Electricity (since 2006) ▪ Electricity transmission and distribution poles ▪ Catenary poles for railway electrification 2) Telecommunication (since 2006) ▪ Fiber optic concrete pole ▪ 5G SMART pole ▪ Telecommunication monopole ▪ Telecommunication steel pole ▪

  4. Slide 4: Our Geographical Market

    Our Geographical Market Worldwide Presence, Locally Rooted Manufacturing Excellence & Lighting Solutions COPYRIGHT © 2026 PMW GROUP OF COMPANIES PAGE 04

  5. Slide 5: Key Management

    Key Management Lee Choy Datuk Brian Lee Khim Hwa Teik San Cherng Jey Chief Business Chief Operating Officer Chief Operating Officer Development Officer West Malaysia East Malaysia Lee Haji Zulkepli Chen Lee Hon Hwa Siew Yoke bin Hj. Hussin See Mei Chief Executive Officer Chief Human Chief Compliance

  6. Slide 6: FY2025 & 1Q2026 Key Accomplishment

    FY2025 & 1Q2026 Key Accomplishment Corporate Exercise Apr & Aug 2025: Completed strategic acquisitions Nov 2025: Successful listing of PMW on the of 49% stake in PMW Concrete & 100% stake in ACE Market of Bursa Malaysia Securities PMW Winabumi. Started to consolidate these 2 Berhad on 18 November 20

  7. Slide 7: Nationwide Facilities to Support Scalable Growth

    Nationwide Facilities to Support Scalable Growth Factory Factory (New) Corporate Office Kota Kinabalu Factory 1 Upcoming Kota Kinabalu Ipoh (spun poles & piles) Factory 2 (piles & pipe culvert) Factory(s) • Ipoh Factory 1 (mould, machinery Factory (New) and steel poles) Upcoming Bemban, Perak • Ipoh

  8. Slide 8: Our Factory Utilisation Rate

    Our Factory Utilisation Rate **Ipoh Factory 1 (Moulds and machineries) and Ipoh Factory 4 (Lighting) are customised, made-to- order products; hence, production capacity is not [(Design capacity assuming 24-hour/7-days operations) vs actual output] quantifiable. Concrete Factories Concrete FYE2025 1Q

  9. Slide 9: Financial Highlights

    FINANCIAL HIGHLIGHTS 1Q FY2026 Financial Results Review Building Lasting Foundations Brightening the Future

  10. Slide 10: Financial Snapshot

    Financial Snapshot As At 31 March 2026 Total Assets Total Liability as at end-Mar 2026 as at end-Mar 2026 RM281.5 mil RM100.8 mil REVENUE 1QFY26 Cash & Bank Balance Total Equity RM30.35 mil as at end-Mar 2026 as at end-Mar 2026 RM93.0 mil RM180.8 mil Balance of IPO proceed: RM48 mil Current Ratio as

  11. Slide 11: Revenue Overview

    Revenue Overview Revenue Growth (RM Mil) Revenue by Product Type (RM Mil) 3.94, 13.65, 0.07, 0% 13.86, 4.67, 3% 1.39, 8% 16.39, 7% 15% 208.52 1% 8% 194.25 1.99, 18.34, 3.9, 2% 7% 165.34 164.52 Q4 53.4 11% 15.15, 0.88, 134.87 8% 3% Q3 58.5 127.2, 144.88, 22.5, 85.24 0.27, 77% 75% 74% 1% Q2 47.1 30.35

  12. Slide 12: Gross Profit / PAT Overview

    Gross Profit / PAT Overview Gross Profit (RM Mil) & Margin Gross Profit & Profit After Tax by quarter (RM Mil) 22.80% 32% 28% 10% 14% 13% 14% 24% 25% 24% 7% 26.71% 27.78% 24.41% 18.68 17.06% 17.12% 17.03% 19.62% 14.95 53.96 11.86 43.94 40.91 8.47 7.40 7.76 7.53 6.49 28.15 3.66 23.09 2.11 14.54 7.40

  13. Slide 13: Balance Sheet Position

    Balance Sheet Position As at 31 March 2026 RM MIL 31 Mar 2026 31 Dec 2025 % chg (Unaudited) (Audited) ROBUST FINANCIAL POSITION Non Current Assets 89.8 87.3 + 3% ▪ Balance sheet remains robust with cash & bank balances stood Current Assets 191.7 195.9 - 2% at RM93.0m and net cash position of RM45.7m

  14. Slide 14: Future Prospects

    FUTURE PROSPECTS Building Lasting Foundations Brightening the Future

  15. Slide 15: Strategic Construction of New Factory: Kota Kinabalu, Sabah

    Strategic Construction of New Factory Expansion: at Kota Kinabalu, Sabah Production Activity : Pipe Culvert & RC Pile Total Land Size : 10 acres Approved Capex : RM14.81 million Capacity (24 hrs/7 days) : 4,500 tonnes per month Total Capacity (Tonnes) Per Annum Post Completion / Operational 292k 238

  16. Slide 16: Strategic Construction of New Factory: Bemban, Perak

    Strategic Construction of New Factory Expansion: at Bemban, Perak Manufacturing Activity : Spun Piles Total Land Size : 12 acres Approved Capex : RM43.76 million Capacity (24 hrs/7 days) : 40,000 tonnes per month Total Capacity (Tonnes) Per Annum Post Completion / Operational 772k 238k 292k Timeline

  17. Slide 17: Strategic Construction of New Factory: Tanjung Manis, Sarawak

    Strategic Construction of New Factory Expansion: at Tanjung Manis, Sarawak Production Activity : Spun Piles & Poles Key Accomplishment Total Land Size : 29 acres 8 April 2026 Approved Capex : RM50.25 million Entered into Share Subscription and Shareholders’ Agreement with Capacity (24 hrs/7 days) :

  18. Slide 18: Strategic Market Expansion

    Strategic Market Expansion West Malaysia Foundation Market Lighting the way in Indonesia ▪ Strengthening partnerships beyond borders • Spun Pile supply (Ipoh F3) for Google Data Center, Puncak Alam ▪ Collaboration initiatives with PT Synergy Infra Main Contractor: Samsung C&T (KL) Sdn Bhd Hijau (our

  19. Slide 19: Orderbook & Tenderbook

    Orderbook & Tenderbook Orderbook as at 31 Mar 2026 Tender Book as at 31 Mar 2026 RM135.25 million RM298.71 million RM75.78m RM115.3m RM107.5m RM39.26m RM16.08m RM58.81m RM4.13m RM17.03m COPYRIGHT © 2026 PMW GROUP OF COMPANIES PAGE 019

  20. Slide 20: Industry & Growth Driver

    INDUSTRY & GROWTH DRIVER Building Lasting Foundations Brightening the Future

  21. Slide 21: Our Growth Driver

    Our Growth Driver Infrastructure development continues to gain momentum in Malaysia Significant and expanding market opportunity ▪ Ongoing nationwide infrastructure development continues to drive We are supported by multiple growth sectors: - demand for piling, foundation, and utility structures 1.

  22. Slide 22: Investment Metrics

    INVESTMENT METRICS Building Lasting Foundations Brightening the Future

  23. Slide 23: Why Invest in PMW

    Why Invest in PMW Supporting Malaysia's utility, telecommunications and 01 Infrastructure Tailwinds infrastructure development through mission-critical products and solutions. Valuations @ 3 June 2026 Well-positioned to benefit from ongoing multi-billion ringgit Share Price (RM) 0.25 02 Growth Oppor

  24. Slide 24: Thank You

    Corporate Presentation JUNE 2026 THANK YOU Integrated Infrastructure Solutions Provider pmw-group.com

  25. Slide 25: Q&A Session

    Corporate Presentation JUNE 2026 Q&A SESSION Integrated Infrastructure Solutions Provider pmw-group.com

  26. Slide 26: Disclaimer

    DISCLAIMER Disclaimer: The material in this presentation is the general background information about the Company’s (PMW International Berhad (“PMW”)) activities as at the date of this presentation. This information is given in summary form and does not purport to be complete. Information in this pre

  27. Slide 27: Appendix

    Appendix pmw-group.com

  28. Slide 28: Building Lasting Foundations, Brightening the Future

    Founded in 1981 using the name BUILDING LASTING FOUNDATIONS, UBP @ Ipoh, Perak Specialising in BRIGHTENING spun concrete poles, foundation piles, steel poles, moulds & machinery, and lighting solutions Serving industries: Electricity, Telecommunication, Construction, Precast Concrete Manufacturer, D

  29. Slide 29: Who We Are

    Who We Are PMW International Berhad operates across the concrete infrastructure value chain, manufacturing prestressed spun poles and piles (including standard poles, monopoles, decorative poles and spun piles) and supporting customers with in-house mould and machinery engineering. Its manufacturing

  30. Slide 30: Our Business: Pre-Stressed Spun Concrete Poles & Steel Poles

    Our Business 1. Pre-Stressed Spun Concrete Poles & Steel Poles Our high-performance, steel-reinforced concrete poles are built for durability and reliability. From production to delivery, we ensure top quality at every stage to meet the diverse needs of our customers. Our Products Standard Pole Tele

  31. Slide 31: Our Business: Concrete Piles

    Our Business 2. Concrete Piles We offer a range of spun piles, including round piles in Class A, B, and C for varying strength and quality, and square piles known for their exceptional stability. Crafted from high-quality steel and concrete, our spun piles provide reliable support for buildings, bri

  32. Slide 32: Our Business: Moulds & Machines

    Our Business 3. Moulds & Machines Leading supplier of machinery, moulds, and production Our Moulds plants for precast concrete manufacturers. ✓ One Piece & Sectional Mould Our expertise spans the entire process, from design and ✓ Pile Mould planning to fabrication and consultation. ✓ Decorative Moul

  33. Slide 33: Our Business: Lighting

    Our Business 4. Lighting We offer a comprehensive range of LED lighting products, including street lights, floodlights, and commercial lighting systems. Our solutions are designed to enhance energy efficiency and provide superior illumination while reducing operational costs. Our Products ✓ Solar Li

  34. Slide 34: Group Structure

    Group Structure PMW International 100% 100% Winabumi1 PMW Industries 100% 100% Winabumi Marketing4 PMW Marketing 100% 100% Note: Mega Summit4 Tek Properties (1) Winabumi has been 100% acquired (from 0%) in Aug 2025 (2) PMW Lighting incorporated in FYE 100% 100% 2024 and commenced manufacturing PMW T

  35. Slide 35: Reported vs Proforma

    Reported vs Proforma 01 JAN 2025 30 APR 2025 31 AUG 2025 31 DEC 2025 PCI (Ipoh F2) 30% Associate 49% Subsidiary WBSB (KK F1) External Party 100% Subsidiary 2 Sabah Entities 70% Subsidiary 100% Subsidiary RECOGNITION PERIOD REPORTED PROFORMA PCI – 30% Associate Jan – Apr Share of 30% profit of PCI Co

  36. Slide 36: Reported vs Proforma (cont'd)

    Reported vs Proforma (cont’d) Ipoh Factory 2 / Kota Kinabalu Factory 1 Owner Operator Leasing Income & Material Trading Rent the manufacturing facilities & supply materials PCI PMW Spun Poles & Piles WBSB Manufacture products and supply to PMW & Customers Customer Customer Tr a di ng o f i les Spun