Capital Power Corporation · TSX:CPX

Capital Power — Corporate Update (November 2012)

6 slides from Capital Power's corporate update, Nov 21, 2012

  1. Slide 1: Port Dover and Nanticoke Wind Project Community Liaison Committee Meeting (CLC)

    Port Dover and Nanticoke Wind Project Community Liaison Committee Meeting (CLC) Herb Shields November 21, 2012 6:30 – 8:30 p.m. Jarvis Community Centre

  2. Slide 2: Purpose of the CLC

    Purpose of the CLC  The purpose of the CLC is to: – Act as a liaison facilitating two way communication between Capital Power and members of the public with respect to issues related to the construction, installation, use, operation, maintenance and retirement of the Project; – Provide a forum for

  3. Slide 3: CLC Objectives

    CLC Objectives  The proposed objectives of the CLC are to: – Increase the public’s knowledge base of wind energy and the Project by providing accurate and up-to-date information on the construction, installation, use, operation, maintenance and retirement of the Facility; – Help Capital Power bette

  4. Slide 4: CLC Meeting Format

    CLC Meeting Format A total of four (4) CLC meetings will be held over a two-year period. (i.e. up to two meetings annually) and will be:  Conducted in a local facility (e.g. Jarvis Community Centre – to be confirmed);  Held in the evening (6:30 pm to 8:30 pm – to be confirmed);  2 hours in length

  5. Slide 5: CLC Terms of Reference

    CLC Terms of Reference  All CLC members will be provided with a Terms of Reference document.  The Terms of Reference outlines the following: – Mandate and Purpose; – Objectives; – Membership; – Roles and Responsibilities of Participants; and – CLC Meeting Format.

  6. Slide 6: Questions?

    Questions? Herb Shields, MA Chair and Facilitator Stantec Consulting Ltd. Ph: (519) 836-6050 Ext. 243 Fx: (519) 836-2493 Cell: (226) 979-3071 [email protected]

Capital Power — Corporate Update (November 2012) on 6ix