Intertek Group Plc · LSE:ITRK

Intertek — Technical Presentation (November 2011)

28 slides from Intertek's technical presentation, Nov 15, 2011

  1. Slide 1: Rechargeable Lithium-Ion Batteries for Systems Certification Updates

    RECHARGEABLE LITHIUM-ION BATTERIES FOR SYSTEMS CERTIFICATION UPDATES Rich Byczek, 11/15/11 1 www.intertek.com

  2. Slide 2: Agenda

    Agenda • IEC 62133 adoption, transition • Certification options for Lithium-Ion Batteries • End product requirements and application • Transportation requirements for Lithium-Ion Batteries 2 www.intertek.com

  3. Slide 3: North American Certification Capabilities

    North American Certification Capabilities IEC 62133: Cortland, New York (CBTL) Detroit (CBTL) UL 2054: Detroit, MI and Cortland, NY UL 1642: Detroit, MI and Cortland, NY UN-DOT: Detroit, MI Battery Performance: Detroit, MI Battery Advisory Service: Detroit/ Cleveland 3 www.intertek.com

  4. Slide 4: Battery Standards Arena: US-Based Standards

    BATTERY STANDARDS ARENA US- Based Standards: UL-1642: Lithium Batteries - Focus on single-cells - Used for Lithium-Metal (PRIMARY) - Used for Lithium-Ion (SECONDARY) UL-2054: Household and Commercial Batteries - Focus on Portable Batteries - Typically Battery Packs - References UL 1642 for Lithium C

  5. Slide 5: Battery Standards Arena: IEC-Based Standards

    BATTERY STANDARDS ARENA IEC - Based Standards: IEC-60086 - Primary Batteries (Non-rechargeable) - Covers Performance and Safety IEC-62133 - Secondary Batteries (Rechargeable) - Focus on Lithium-ion Batteries - First Edition, October 2002 - Second Edition in process, potential 2012 release 5 www.inte

  6. Slide 6: IEC 62133 Adoption, Transition: Background

    IEC 62133 ADOPTION, TRANSITION BACKGROUND: - For many years, IECEE (“CB SCHEME”), has accepted the UL Standard as the basis for accepting batteries. - Based on common usage of UL 1642/ 2054 for battery packs. - Proposal in place to fully accept IEC 62133 within IECEE, as standard has been released s

  7. Slide 7: IEC 62133 Adoption, Transition

    IEC 62133 ADOPTION, TRANSITION • At the moment, IEC is working with product level groups to enforce the IEC62133 standard into the product level standard • Some product level committees are making revision changes to their standard to comply with battery requirement • CMC accepted a firm and final e

  8. Slide 8: IEC 62133 Adoption, Transition: Transition Testing

    IEC 62133 ADOPTION, TRANSITION TRANSITION TESTING: NOW until April 30, 2012: - Assuming battery is already tested and certified to UL-1642: - “Delta” testing to be performed on UL-1642 Transition: certified cells. Additional Test to UL1642must be performed to meet IEC62133 From May 1, 2012, full tes

  9. Slide 9: IEC 62133 Adoption: Who Is Affected

    IEC 62133 ADOPTION, TRANSITION Who is affected by this regulatory change? Portable Battery IEC 62133 Medical Devices Powertools Household App Other (Except IEC60601 IEC60745 IEC60335 Telecom and A/V) 9 www.intertek.com

  10. Slide 10: IEC 62133 Adoption: Who Is Not Yet Affected

    IEC 62133 ADOPTION, TRANSITION Who is NOT YET affected by this regulatory change? Portable Battery Use UL standards Audio Video ICT IEC60065 IEC60950 NOTE: TC 108 expects to adopt IEC 62133 2nd edition by 2013 10 www.intertek.com

  11. Slide 11: IEC 62133 Delta Testing

    IEC 62133 ADOPTION, TRANSITION DELTA TESTING: For Lithium Cells already certified to UL-1642, the following tests must be applied APPLIES TO CELLS ONLY Required: - 25 cell samples - Copy of the cell manufacturer’s ISO-9001/13485 or similar Quality System certification. - Rating in Ah (Amp-hours) - M

  12. Slide 12: IEC 62133 Tests and Evaluations Required

    IEC 62133 ADOPTION, TRANSITION TESTS and EVALUATIONS REQUIRED 1.4 IEC - Parameters measurement tolerances: 2 IEC - General Safety Considerations: 2.1 IEC - Insulation and Wiring: 2.2 IEC - Venting: · 2.4 IEC 62133 – Terminals Contacts: 2.5 IEC – Assembly of Cells into Batteries: 2.6 IEC – Quality Pl

  13. Slide 13: CB Certification Options: Battery Manufacturer Level

    CB CERTIFICATION OPTIONS BATTERY MANUFACTURER LEVEL for CB: CELLS MUST BE IEC-62133 TO CERTIFY THE BATTERY DELTA TESTING ON CELLS (ALREADY CERTIFIED TO UL-1642) - Requires 25 cell samples - Provided CB cert for those cells - Can be used until April 30, 2012 - Re-certification not required after May

  14. Slide 14: CB Certification Options: Battery Pack Test

    CB CERTIFICATION OPTIONS BATTERY MANUFACTURER LEVEL for CB: BATTERY PACK TEST to IEC-62133 (Cells already IEC 62133): - Requires 35 packs - Copy of the battery manufacturer’s ISO-9001/13485 or similar Quality System certification. - Battery Bill of Materials (BOM) - 2D layout drawing with Label Artw

  15. Slide 15: CB Certification Options: End Product Level

    CB CERTIFICATION OPTIONS END PRODUCT LEVEL for CB: SCENARIO: END product to IEC 60601-xx, Cells are UL-1642, pack has no certification, “portable” device - Previous Slide applies SCENARIO 2: END product to IEC 60601-xx, Cells are UL-1642, pack has no certification, Non-portable device (Ie: device is

  16. Slide 16: CB Certification Options: IEC 60601-1 3rd Edition Note

    CB CERTIFICATION OPTIONS NOTE: IEC 62133 Battery Certification is REQUIRED for IEC 60601-1 3rd Edition Certification 16 www.intertek.com

  17. Slide 17: ETL Certification Options

    ETL CERTIFICATION OPTIONS BATTERY MANUFACTURER LEVEL (US, non-CB): CELL TESTING TO UL-1642 (if not already certified): - Requires 150 cell samples - Note that preconditioning may require up to 90 days of charge/discharge cycling. - Need to know the rated life expectancy in charge/discharge cycles -

  18. Slide 18: ETL Certification Options: End-Product Standard Requirements

    ETL CERTIFICATION OPTIONS IF…. END-PRODUCT STANDARD NOTES SPECIFIC BATTERY STANDARD REQUIREMENTS (such as UL- 2054), then Full testing must be performed at the battery level 18 www.intertek.com

  19. Slide 19: Transportation Requirements

    TRANSPORTATION REQUIREMENTS 19 www.intertek.com

  20. Slide 20: UN / USDOT Battery Designations for Lithium Batteries

    TRANSPORTATION REQUIREMENTS UN / USDOT Battery Designations for Lithium/ Li-Ion Batteries - Class 9 Material - UN3090: Lithium (Lithium Metal) Batteries - UN3091: Lithium Batteries contained in equipment - UN3480: Lithium-Ion Batteries - UN3481: Lithium-Ion Batteries contained in equipment - IATA 96

  21. Slide 21: Transportation Requirements: UN Manual Latest Edition

    TRANSPORTATION REQUIREMENTS LATEST and GREATEST UN MANUAL: Recommendations on the Transport of Dangerous Goods. Manual of Tests and Criteria. 5th Revised Edition (Issued December 2009) Section 38.3 refers to “Lithium Battery Testing Requirements” Per Federal register 49 CFR sections 171.7 - 5th edit

  22. Slide 22: Tests T1 – T8

    Tests T1 – T8 T1-T5 (Same Samples, Tested in Order, All Types) T1: Altitude Simulation T2: Thermal Test T3: Vibration T4: Shock T5: External Short Circuit T6: Impact (Primary and Rechargeable Cells Only) T7: Overcharge (Rechargeable Batteries Only) T8: Forced Discharge (Primary and Rechargeable Cell

  23. Slide 23: UN Manual: Samples Needed for Secondary Cells

    UN Manual of Tests and Criteria Samples Needed: SECONDARY CELLS (5th edition) Cylindrical Prismatic (18650, Canister) (Pouch) Tests T1-T5, T6 and T8 are required FULLY FULLY 1st Cycle 50 Cycle TOTAL CHARGED DISCHARGED 50% CHARGE DISCHARGED Cylindrical 10 5 10 10 35 Cells Prismatic 10 10 10 10 40 Cel

  24. Slide 24: UN Manual: Samples Needed for Secondary Batteries

    UN Manual of Tests and Criteria Samples Needed: SECONDARY BATTERIES (5th edition) SMALL BATTERY: LARGE BATTERY: Gross Mass up to 12 kg Gross Mass over 12 kg Tests T1-T5 and T7 are required 1st Cycle 25 Cycle CHARGED TOTAL CHARGED Small Batteries 8 8 16 (50 cycles) Large Batteries 4 4 8 (25 cycles) 2

  25. Slide 25: UN Manual: Samples Needed, Additional Criteria

    UN Manual of Tests and Criteria Samples Needed: additional criteria - Lithium Ion Rechargeable Packs - Up to 6,200 Wh rating - Cells/ Modules already tested - 1 (or 2) sample(s) only, cycled 25 times, fully charged - Tests 3,4,5 and 7 only - More than 500g Lithium or 6,200 Wh Rating - Cells/Module a

  26. Slide 26: Battery Testing Info Needed

    BATTERY TESTING INFO NEEDED Basic information needed to quote your test program: - Nominal Voltage and Capacity (Ah) rating - Maximum charging current and voltage - Maximum discharge current and voltage - Normal discharge current - Cutoff voltage (voltage at which output is cut off or battery is con

  27. Slide 27: Questions?

    QUESTIONS? - Please use the Q&A box and type questions. 27 www.intertek.com

  28. Slide 28: Thank You

    Thank You. Rich Byczek, Technical Lead, EV and Energy Storage 734-591-9161 [email protected] 28 www.intertek.com

Intertek Group — Technical Presentation (November 2011) on 6ix