  1. Slide 1: Silverton Wind Farm Community Consultative Committee

    1 Silverton Wind Farm Community Consultative Committee Thursday 28 April 2016

  2. Slide 2: Agenda

    2 Agenda. 1. Welcome Confirmation of February meeting minutes Review previous meeting actions 2. Project status update 3. CCC membership review 4. Other business 5. Next meeting and close Silverton Wind Farm 28 April 2016

  3. Slide 3: 1. Review previous meeting actions

    3 1. Review previous meeting actions. Action item CCC Status Who Meeting 1 On behalf of CCC members, to remind media representatives October Ongoing KE about the protocols for interviewing and quoting CCC 2013 members when speaking to the media 5 AGL to send out hardcopies of the TMP when it becomes

  4. Slide 4: 1. Review previous meeting actions

    4 1. Review previous meeting actions. Action item CCC Status Who Meeting 11 Send group link to Silverton Wind Farm Social Impact February Closed HO Statement document 2016 12 Add CCC membership renewals to next meeting’s agenda February Closed HO 2016 13 Provide information on public consultation av

  5. Slide 5: Silverton Wind Farm

    2. Project status update. 5 Silverton Wind Farm › Location: Barrier Ranges approximately 5km north of Silverton › Capacity: up to 200 MW › Generation: approximately 700 GWh » powering more than 120,000 average NSW homes › Connection: 220 kV TransGrid substation, Broken Hill › Wind turbines: 3.X MW*

  6. Slide 6: Silverton Wind Farm approval and connection

    2. Project status update. 6 Silverton Wind Farm › Project Approval includes the construction and operation of 282 WTGs › Connection involves the construction of 220 kV transmission line (>24km) Silverton Wind Farm 28 April 2016

  7. Slide 7: 2. Project status update

    2. Project status update. 7 › AGL remains committed to the Silverton Wind Farm » 25 February 2016  Community Consultative Committee › Hydrogeological assessment  March 2016 » Project Approval condition 2.64 – groundwater interception › Invitation to Tender (ITT) issued to shortlist » Indigenous en

  8. Slide 8: Construction Water

    2. Project status update. 8 Construction Water › Umberumberka reservoir is currently empty and heavily sedimented. » Photos showing reservoir previously full and the current situation » We are currently progressing planning with Essential Water » Require ~45 ML/pa Silverton Wind Farm 28 April 2016

  9. Slide 9: Sediment / Erosion Control Plan

    2. Project status update. 9 Sediment / Erosion Control Plan › Environmental Assessment and Statement of Commitment (SOC58) requires the establishment of a Sediment / Erosion Control Plan to minimise deterioration of water quality » Establish soil and water management practices guided by the best pra

  10. Slide 10: Indigenous Heritage

    2. Project status update. 10 Indigenous Heritage › Environmental Assessment (Appendix 6) » New South Wales Archaeology Pty Ltd undertook an Indigenous and Non Indigenous heritage assessment of the proposed Silverton Wind Farm. » The field survey and assessment was undertaken in partnership with the

  11. Slide 11: Modification – Project Extension

    2. Project status update. 11 Modification 2 – Project Extension › AGL submitted Modification 2 to the Department of Planning and Environment (DPE) on 25 February 2016. » Exhibited from 4-18 March 2016 (extended to Easter). » Final submissions report issued to DPE on 14 Apr 2016. Modification 3 – Pro

  12. Slide 12: 3. CCC membership review

    3. CCC membership review. 12 › Current Terms Of Reference (TOR) formed in 2012 in consultation with community › Membership for duration of development and construction › TOR included review of effectiveness of CCC every 12 months Silverton Wind Farm 28 April 2016

  13. Slide 13: 3. CCC membership review. Current members

    3. CCC membership review. Current members. 13 Cynthia Langford Pastoralist / turbine John Taplin Silverton Village host Committee Naomi Schmidt Pastoralist / turbine Peter Price Silverton Village host Committee / Silverton Pub Phil Blore Pastoralist / turbine Albert Woodroffe Silverton Village host

  14. Slide 14: 5. Other business

    14 5. Other business. › Broken Hill Solar Plant Community Open Day – Sunday 22 May 2016 › Questions from group and observers? Silverton Wind Farm 28 April 2016

  15. Slide 15: 6. Next meeting and close

    15 6. Next meeting and close. › Next meeting: › Date › Time › Location Silverton Wind Farm 28 April 2016