Power Minerals Limited · ASX:PNN

Power Minerals — PepinNini Minerals — Shareholder Meeting (2009)

48 slides from Power Minerals's shareholder meeting presentation, 2009

  1. Slide 1: PepinNini Minerals Limited 2009

  2. Slide 2: Crocker Well Project

    Crocker Well Project m Submission of an application for a Mining Lease at Crocker Well for the development of a uranium mine m Completion of 17 cored boreholes and 267 RC boreholes as part of a resource validation program to verify and upgrade the JORC compliant uranium resource from Inferred to Ind

  3. Slide 3: Revised processing circuit and geophysical surveys

    m A new revised processing circuit incorporating beneficiation by flotation, solid liquid separation by pressure filtration and a Carbonate strip followed by Sodium Diuranate (SDU) and Uranium Peroxide precipitation has been designed for treating the Crocker Well ore. Overall uranium recovery for pr

  4. Slide 4: Bankable Feasibility Study and community consultation

    m Progression of a Bankable Feasibilty Study together with Environmental Baseline, Hydrogeological, Geotechnical and Mining studies for the Crocker Well Development m Commencement of consultations with pastoralists, indigenous groups and the local community regarding the proposed mine development at

  5. Slide 5: Musgrave Province Project

    Musgrave Province Project m Completion of a Farm-in and Joint Venture Agreement with Rio Tinto Exploration Pty Limited to explore three tenement areas covering approximately 1,382 km² of ground considered prospective for Nickel Copper Sulphide mineralisation and other commodities m Completion of 12

  6. Slide 6: North Queensland Project

    North Queensland Project m New vein systems identified at surface with gold grades of up to 1,710 g/t (55 oz/t) within EPM 15547 The Return. Silver grades of up to 20 oz/t also identified m Widespread copper (max.32.8%), gold (max. 335g/t), silver (max. 1,360g/t) and lead (max. 64.7%) mineralisation

  7. Slide 7: 36 exploration tenements covering 16,000 sq.kms

    North Queensland (exploration) Musgrave Province (exploration) Robinson Range Iron Ore (exploration) Curnamona Province (U3O8 Development) 36 exploration tenements covering 16,000 sq.kms.

  8. Slide 8: Curnamona Province Project

    Curnamona Province Project (40% PepinNini 60% Sinosteel Corporation) Advanced Uranium Project – Crocker Well z Strategic alliance with Sinosteel Corporation to jointly develop the Uranium Project z Currently drilling prospects with potential to add to the uranium resource already defined at Crocker

  9. Slide 9: 5 Tenements covering 3,778 km2

    To Beverley (U) Mine EL4239 5 Tenements covering 3,778 km2

  10. Slide 10: Field Camp at Crocker Well

    Field Camp at Crocker Well

  11. Slide 11: Boreholes completed for resource verification at Crocker Well

    More than 300 boreholes have been completed for resource verification at Crocker Well

  12. Slide 12: Recent Field Activities

    Recent Field Activities Helicopter geophysical surveys Drilling Meteorological Station (Temperature, pressure, evaporation, humidity, rainfall, Sampling wind speed and direction, dust and radiation)

  13. Slide 13: Ministerial Visit 20th January, 2009

    Ministerial Visit 20th January, 2009

  14. Slide 14: Preliminary Mine Design

    EAST CENTRAL JUNCTION ORIGINAL Preliminary Mine Design

  15. Slide 15: Current Proposed Processing Plant Layout

    Pressure Filtration Precipitation & Drying replaces CCD for solids liquid H2O2 Precipitation separation Filter Press & Rotary Vacuum Drying Leach Circuit Seven stage; H2SO4 at 90°C; 24 hour residence time Solvent Extraction Circuit Batman Pulsed Column & Mixer-settler Na2CO3 strip Grind Circuit SAG

  16. Slide 16: Potential Additional U3O8 Resource Targets

    Oo o o Potential Additional U,O, Resource Targets | Wn | Crocker Well Project — South Australia inerals limited Radiometrics and Surface Sample Results Rep 0.29% U,0, Rockchips J . ; I aes RGB Ternary Radiometrics > tet 1 0.89% U;0, Rockchips 2 © 2.4% UsOs Rockchips Sin U,0, Rockchips | 250,000t @ 0

  17. Slide 17: Sinosteel $6 million commitment for non-uranium targets

    TMI RTP Magnetics Kalkaroo (Cu-Au-Mo) Billeroo Carbonatite Johnaroo ( Birthday Well South Koolka ( ( ( White Dam (Au) Willow Crocker’s Well $6 million expenditure commitment by Sinosteel Corporation for non-uranium 0 5 10 More than 30 priority base metal (Cu/Au, Pb/Zn) targets ready to explore kilom

  18. Slide 18: Previous drill intersections by earlier explorers

    Encouraging drill intersections by previous explorers include 10m @ 2.07g/t Au, 0.74% Cu, 5.6m @ 8.5% Cu and 32m @ 0.66% Zn

  19. Slide 19: Musgrave Province Project

    Musgrave Province Project TARGETING Nickel, copper, PGE’s (Giles Complex) Copper, lead, zinc, silver (Birksgate Complex)

  20. Slide 20: Musgrave Province Project tenements

    Musgrave Province Project 4 Granted Exploration Licences 4 Exploration Licence Applications covering 9,525km2

  21. Slide 21: Exploration Highlights 2009

    Exploration Highlights 2009

  22. Slide 22: Rio Tinto Joint Venture

    Rio Tinto Joint Venture • Three tenements covering 1,382m2 • Expenditure of $4m over 4 years to earn 51% • One tenement granted – EL3931 Woodroffe • Two tenement applications – Jalakana & Aparatjara Targeting Ni-Cu sulphide & base metal mineralisation Æ High Priority Tempest EM anomalies identified

  23. Slide 23: EL4048 Mt Caroline Drilling

    EL4048 Mt Caroline Drilling SUMMARY • Focusing on the Giles Complex mafic-ultramafic Caroline Intrusion – prospective for Ni-Cu sulphide & PGE mineralisation • 19 diamond boreholes completed (7579.7m) • 856 vacuum boreholes completed (9595.35m) • Reprocessing & reinterpretation of Tempest EM survey

  24. Slide 24: EL4048 Mt Caroline Drilling

    EL4048 Mt Caroline Drilling

  25. Slide 25: EL4048 Mt Caroline Drilling

    EL4048 Mt Caroline Drilling Induced Polarisation geophysical survey – 7 lines (14.1km) Coincident EM & magnetic anomalies – follow up drilling Æ Further follow up drilling of other anomalies in tenement

  26. Slide 26: EL3535 Pine Ridge

    EL3535 Pine Ridge SUMMARY Focusing on known prospects: - Kenmore I & II - Eremophila, Southbank Giles Complex mafic and - ultramafic rocks Birksgate Complex meta- - igneous & meta-sedimentary rocks 5 diamond boreholes completed (1007.98m) 535 vacuum boreholes completed (3445.5m)

  27. Slide 27: EL3535 Pine Ridge

    EL3535 Pine Ridge PIN002: 124.68m- 124.68m-124.97m 0.48% Cu Mineralised migmatitic gneiss and metabasites rocks (Birksgate Complex) PIN002: 310.5- 310.5-312.15m 0.4% Cr Serpentinised olivine-bearing ultramafic rocks (Giles Complex?) Garnetites & calcsilicates Æ Broken Hill-type? PIN002: 339m

  28. Slide 28: EL3931 Woodroffe

    EL3931 Woodroffe Focusing on: - Giles Complex mafic EL3931 Woodroffe ultramafic rocks (including Caroline Intrusion - Birksgate Complex meta-igneous & meta-sedimentary rocks Cleared for exploration: EL4048 Mt Caroline 12 diamond boreholes 811 vacuum boreholes Æ Testing Tempest EM anomalies

  29. Slide 29: Queensland Projects

    Queensland Projects 100% interest in 24 tenements 2,773 sq.kms

  30. Slide 30: Tenements prospective for gold, copper, uranium, phosphate and potash

    The tenements are prospective for gold, copper, base metals, uranium, phosphate and potash

  31. Slide 31: Uranium

    143° 00" 146" 00° Ciiarsey EPM 17879 QO Ironhurst d EPM 18168 —_—_———_—— Log Creek 50 km EPM 17953 Robin Hood 19" 00" 19" 00" EPM 16917 5 Lower Percy Townsville EPM 15469 18020 The Gilbert River less ice ane a EP See bee Deep S EPM 15200. ~ The Bluff EPM 15419 20" 00" Woolgar East foe" 00" PepinNini

  32. Slide 32: Uranium Targets

    Uranium Targets m Uranium occurrences which have been inadequately tested by previous explorers and favourable geological settings for uranium mineralisation have been identified in 10 tenements m Principal targets are hard rock volcanic type deposits similar to the nearby Maureen and Ben Lomond Ura

  33. Slide 33: Uranium, phosphate and potash

    uranium, phosphate and potash

  34. Slide 34: Uranium Phosphate Potash Targets

    Uranium Phosphate Potash Targets m Numerous Uranium enriched Phosphate Rock prospects previously identified within EPM 14834 Plain Creek. Additional potential within Loyo and Rush tenements m Phosphate grades of up to 27% have been reported by previous explorers together with uranium grades of up to

  35. Slide 35: Plain Creek Area

    Plain Creek Area m Located within the Devonian Carboniferous Drummond Basin m Approx. 300kms by sealed road to the port of Townsville m Field reconnaissance and sampling programs have confirmed high grade uranium, phosphate and potash potential

  36. Slide 36: 127 sites inspected and surface samples collected

    127 Sites have been inspected and 138 surface samples collected for assays Highest Uranium 3,513 ppm U3O8 from Sassafras Creek Prospect Highest Phosphate 21.4% P2O5 from Robyn Lorraine West Prospect Highest Potash 5.8% from Sassafras Creek & Homestead Prospects

  37. Slide 37: Gold and Base Metals

    EPM 18020 Clarke River Gooll EPM 15170 be Deep Creek EPM 15419 20° 00" Wooilgar East PepinNini Minerals Limited 2200s ¢-0 146" 00"

  38. Slide 38: Gold & Base Metals

    Gold & Base Metals m Widespread copper, gold, silver and lead mineralisation has been identified in rock chip samples m 335 g/t gold, 85 g/t silver, 0.2% copper & 2.8% lead m 54 g/t gold, 870 g/t silver, 32.8% copper m 65.1g/t gold, 435g/t silver, 9.98% copper m 3.6g/t gold, 653g/t silver, 20.30% co

  39. Slide 39: Gold & Base Metals

    ] TR Return Prospects a te | F Regional Geology Cainozolc Eromanga Basin Kennedy Province Voleanics | Kennedy Province Intrusives Gilberton Basin Pama Provinoe Granitoid i — we = peas | 1) etheridge Province iaNiai Minerals Limited FS] Soil Sampling Grid | _ EPM Application @ 341 denwrnynd Opener Pr

  40. Slide 40: 25m NS linespacing, 30m height

    25m NS linespacing 30m height

  41. Slide 41: Union Project Uranium

    7898500 N 7897500 N 7896500 N 7895500 N 790000 E 791000 E Union Project Uranium 792000 E 793000 E 793000 E 794000 E 7898500 N 7897500 N 7896500 N 7895500 N ee 40.0 cps 33.5 27.0 20.5 14.0 1.0

  42. Slide 42: Primary quartz-chlorite-sulphide ore from the Union Prospect

    Primary quartz-chlorite-sulphide ore from the Union Prospect

  43. Slide 43: Percyville EPM15440 Rock Chip Results

    Percyville EPM15440 - alk Valley Prospect (Rock Chip Results i Helimagnetics) ra : : ss6gitau List Au 23.8 gad’ 5 9.7 git Au 2B9GitAg ~238gitAg t=. °\* /24.7-git-Au ‘ 5BIgitAg — 29%, Cu “9, 5% cu. of “ S489. QPL AU) papers ; ” ep et he 237 g/t Au ‘ é \i | & 81.2 git’Ag 7 \ o>. : : \ - mri say 90.ig/

  44. Slide 44: The Return EPM recent rock sample results

    The Return EPM - Recent Pol metalic Rock Sam ple Results (Nov. 2008) 2git Au . 4.9g/t Au 19.1g/t Au Tg/t Ag _l2git Ag 1.1% Po» 6° Pb i —, z 14g/tadh > & . *22g/t Ag a a Sodepurtogs ha v4 ae +) N ie, by ppegit Au, 18gitAg ") ; : , N 21@/VAUy49git Ag s2.7artallaG ag 4 . ~ ; %, . > ' Z 500m warreeeeeee

  45. Slide 45: The Return EPM15547 surface rockchip results

    * * ta + * 1115 cottected by PNN] > tor (neta) 10g-1oz (n=30) 19-109 = (n=47) “19 (n=24) below detection (nil) values per tonne Au The Return EPM15547 - te PNN Surface Rockchips Results @ >10git Au Ogit Au Rock Chip “AZ 7 5qit- SAT SPPBS 0,5-1g/t Au » <0.5g/t Au Results (Gold) EPM 15547 The Return M

  46. Slide 46: 80% of surface samples returned economic gold grades

    80% of the 115 surface samples that have been collected by PepinNini for assays on this tenement have returned economic grades of gold with 15% returning more than 1oz/t

  47. Slide 47: Queensland Project Summary

    Queensland Project Summary m 100% interest in 24 tenements covering 2,773 sq kms m Confirmed high grade gold, copper, uranium, phosphate and potash potential m Priority high grade shallow gold targets ready to drill

  48. Slide 48: Thank You

    Disclaimer: Thank You • The information in this presentation is published to inform you about PepinNini Minerals Limited and its activities. All reasonable effort has been made to provide accurate information, but we do not warrant or represent its accuracy and we reserve the right to make changes t

PepinNini Minerals — Shareholder Meeting (2009) on 6ix