Lundin Mining Corporation · TSX:LUN

Lundin Mining — Bank of America Merrill Lynch – Canada Mining Conference 2015

25 slides from Lundin Mining's conference presentation, September 2015

  1. Slide 1: Bank of America Merrill Lynch – Canada Mining Conference

    TSX: LUN OMX: LUMI Bank of America Merrill Lynch – Canada Mining Conference September 2015

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward-Looking Information This presentation contains forward-looking information, including, but not limited to, guidance on estimated annual production and cash costs. This forward-looking information is not based on historical facts, but rather on current

  3. Slide 3: Lundin Mining – Globally Diversified Portfolio

    Lundin Mining – Globally Diversified Portfolio Lundin Mining Head Office Lundin Mining Toronto, Canada UK Office West Sussex, UK Zinkgruvan (100%) Zinc-Lead-Copper Freeport Cobalt (24%) (Sweden) Cobalt Refinery (Finland) Eagle (100%) Nickel-Copper (USA) Neves-Corvo (100%) Aguablanca (100%) Nickel-Co

  4. Slide 4: Operating Highlights

    Operating Highlights Operations performing well – meeting or exceeding expectations Copper Zinc Nickel (Cu) (Zn) (Ni) • Strong performance in • Solid results at • Production at Eagle and first half of 2015 Zinkgruvan. Increased Aguablanca largely production guidance meeting or exceeding • Improved p

  5. Slide 5: Sales Mix First Half 2015

    Sales Mix First Half 2015 • 70% of sales were from Candelaria (Chile – Cu) and Eagle (U.S.A. – Ni/Cu) • 66% of sales were from copper Sales Breakdown by Mine Sales Breakdown by Metal Aguablanca Other 5% Gold 6% Zinkgruvan 6% 8% Zinc 8% Neves- Corvo 17% Candelaria Nickel 53% 14% Copper 66% Eagle 17%

  6. Slide 6: YTD Cash Costs – Very Competitive

    YTD Cash Costs – Very Competitive Source: Cost curves from Wood Mackenzie as of Q2 2015 6 * Cash cost curves are based on the expected annual costs for 2015, whereas YTD costs have been highlighted for LUN assets for illustrative purposes

  7. Slide 7: Strong Financial Position

    Strong Financial Position US$ M June 30, 2015 Cash and Cash Equivalents $507 Net Debt1 $497 Available Credit Facilities $360 Cash and Cash Equivalents 600 $507 400 $355 $US M 200 $175 - Q4/14 Q1/15 Q2/15 • Cash balance grew by over $300M in the first six months of the year • Net debt has improved fr

  8. Slide 8: 2015 Production and Cost Outlook

    2015 Production and Cost Outlook • Raised copper and lead (contained tonnes) Guidance Tonnes Cash Costsa production guidance and Candelaria (80%) 135,000 – 140,000 $1.35/lb lowered copper cost outlook Eagle 20,000 – 23,000 Neves-Corvo 50,000 – 55,000 $1.55/lb Copper • Zinkgruvan outperforming, Zinkg

  9. Slide 9: Operational Overview and Outlook

    Operational Overview and Outlook Candelaria (80%) Neves-Corvo (100%) Eagle (100%) Zinkgruvan (100%) Tenke Fungurume Aguablanca (100%) (24%) 9

  10. Slide 10: Candelaria (Cu/Au/Ag), Chile

    Candelaria (Cu/Au/Ag), Chile Atacama Province, Region III, approximately 20 km south of Copiapó 10

  11. Slide 11: Candelaria H1/15 Performance and Outlook

    Candelaria H1/15 Performance and Outlook • Production (100% basis) of 96.0 kt in H1/15 Location Chile exceeded expectations as a result of higher Ownership 80% throughput and recoveries 2015 Production 135,000-140,000 t Cu • Cash costs of $1.20/lb YTD, below annual Guidance (80%) guidance due to ope

  12. Slide 12: Candelaria New Mine Plan – Improved Production & Costs

    Candelaria New Mine Plan – Improved Production & Costs • 25% increase in LOM copper production (2.4 Mt vs. 1.9 Mt) • Mine life extended to 2032 from 2028 • Low cost operation with average LOM cash costs of $1.54/lb • Total capex of $460 million for 2016 – 2019 (+ capitalized waste stripping of $436

  13. Slide 13: Eagle Mine (Ni/Cu), Michigan, U.S.A.

    Eagle Mine (Ni/Cu), Michigan, U.S.A. 50 km northwest of Marquette in the Upper Peninsula of Michigan 13

  14. Slide 14: Eagle H1/15 Performance and Outlook

    Eagle H1/15 Performance and Outlook • Nickel production of 13.7 kt and copper Location Michigan, USA production of 11.8 kt in H1/15 Ownership 100% › Meeting expectations in its first full 2015 25,000–28,000 t Ni year of production Production Guidance 20,000–23,000 t Cu 2015 Cost Guidance $2.00/lb Ni

  15. Slide 15: Neves-Corvo (Cu/Zn), Portugal

    Neves-Corvo (Cu/Zn), Portugal Situated 220 km southeast of Lisbon 15

  16. Slide 16: Neves-Corvo H1/15 Performance and Outlook

    Neves-Corvo H1/15 Performance and Outlook • Strong copper production of 30.8 kt in Location Portugal H1/15 Ownership 100% 50,000–55,000 t Cu 2015 Production • higher throughput and better grades 60,000–65,000 t Zn Guidance 4,000-5,000 t Pb • Zinc production of 33.4 kt in H1/15 2015 Cost Guidance $1.

  17. Slide 17: Zinc Expansion Project – Neves-Corvo

    Zinc Expansion Project – Neves-Corvo • Feasibility Study for expansion of zinc substantially complete • Scope covers underground development of lower Lombador Zn deposits › Expansion of shaft capacity to 5.6 Mtpa › Zinc plant expansion to 2.5 Mtpa of ore throughput › Maximum zinc production nominall

  18. Slide 18: Zinkgruvan (Zn/Pb/Cu), Sweden

    Zinkgruvan (Zn/Pb/Cu), Sweden Situated 200 km southwest of Stockholm 18

  19. Slide 19: Zinkgruvan H1/15 Performance and Outlook

    Zinkgruvan H1/15 Performance and Outlook • Zinc production of 39.7 kt in H1/15 Location Sweden Ownership 100% › Higher throughput and recoveries 80,000–85,000 t Zn 2015 Production 30,000–33,000 t Pb Guidance • Lead production of 14.8 kt in H1/15 2,000–3,000 t Cu impacted by lower grades 2015 Cost Gu

  20. Slide 20: Aguablanca (Ni/Cu), Spain

    Aguablanca (Ni/Cu), Spain Situated 80 km north of Seville 20

  21. Slide 21: Aguablanca H1/15 Performance and Outlook

    Aguablanca H1/15 Performance and Outlook • Nickel production of 5.0 kt and copper Location Spain production of 4.1 kt Ownership 100% 2015 Production 7,000–7,500 t Ni › Consistent higher grades YTD with Guidance 5,500–6,000 t Cu lower throughput impacting Q2 only 2015 Cost Guidance $3.75/lb Ni • Nick

  22. Slide 22: Tenke Fungurume (Cu/Co), DRC

    Tenke Fungurume (Cu/Co), DRC Situated 175 km northwest of Lubumbashi 22

  23. Slide 23: Tenke H1/15 Performance and Outlook

    Tenke H1/15 Performance and Outlook • Copper production (100% basis) of Location Democratic Republic 105.0 kt in H1/15 of Congo Ownership 24% • Cobalt production (100% basis) of 7.5 kt 2015 Production Guidance 50,000 t Cu (attributable share) in H1/15 2015 Costs $1.12/lb Cu • Copper cash costs of $1

  24. Slide 24: Well Positioned in Any Market

    Well Positioned in Any Market  High quality, diversified asset base  Diversified metals exposure  Meaningful production scale  Strong free cash flow and good margins  Conservative balance sheet 24

  25. Slide 25: Thank You

    TSX: LUN OMX: LUMI Thank You

Lundin Mining — Bank of America Merrill Lynch – Canada Mining Conference 2015 on 6ix