Slide 1: Quarterly IR Updates: 4th Quarter 2017 Financial Results & Updates
QUARTERLY IR UPDATES 4th Quarter 2017 Financial Results & Updates 7th February 2018 Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 2: Disclaimer
2 Disclaimer This Presentation is not intended to form the basis of any investment decision with respect to Malaysia Marine and Heavy Engineering Holdings Berhad (MHB). Neither this presentation nor anything contained herein shall form the basis of, or be relied upon in connection with, any contract

Slide 3: Contents
3 Contents • Overview • Projects • Financials • Highlights • Moving Forward Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 4: Overview
Overview Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 5: Key Highlights
5 Key Highlights FINANCIALS • Revenue of RM956.4 mil • Pretax Profit of RM11.0 mil PROJECTS Heavy Engineering Unit (HEU) Milestones: Offshore • Sail-away of F12 Kumang WHP topside and jacket • Sail-away of Besar-A topside • Sail-away of Baronia CPP jacket, bridge & piles • Sail-away of PETRONAS

Slide 6: Projects
Projects Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 7: Besar-A WHP Topside, Jacket & HUC
7 Sail-away of Topside on 3rd March 2017 Besar-A WHP Topside, Jacket & HUC Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 8: F12 Kumang WHP Topside, Jacket & HUC
8 Sail-away of Topside on 3rd March 2017 F12 Kumang WHP Topside, Jacket & HUC Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 9: Baronia CPP Jacket, Bridge & Piles
9 Sail-away of Jacket on 7th March 2017 Baronia CPP Jacket, Bridge & Piles Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 10: Petronas PFLNG 2 Turret system
10 Sailed away on 2nd December 2017 Petronas PFLNG 2 Turret system Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 11: FSO Benchamas 2 External Turret
11 Completed integration of external turret on 22nd November 2017 FSO Benchamas 2 External Turret Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 12: Facilities Improvement Project
12 Completed modification and rejuvenation work on 30th September 2017 Facilities Improvement Project Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 13: RAPID Package 22
13 Completion of plate rolling on 30th June 2017 RAPID Package 22 Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 14: RAPID Package 3 Area 3
14 Completion of piping and pipe support pre-fabrication on 31-Mar-2017 RAPID Package 3 Area 3 Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 15: Bokor CPP EPCIC
15 Progress at 6.04% Bokor CPP EPCIC Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 16: Sepat – A WHP EPCIC
16 Progress at 28.33% Sepat – A WHP EPCIC Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 17: RAPID Projects - Package 5 Centralised Piping Fabrication (CPF)
17 Progress at 99.43% RAPID Projects - Package 5 Centralised Piping Fabrication (CPF) Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 18: RAPID Projects – Package 5 ROG
18 Progress at 55.26% RAPID Projects – Package 5 ROG Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 19: RAPID Projects – Package 3 Area 2
19 Progress at 79.76% RAPID Projects – Package 3 Area 2 Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 20: RAPID Projects – Package 14
20 Progress at 42.13% RAPID Projects – Package 14 Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 21: FSO “Nautica Bergading”
21 Refurbishment and Conversion (99.80% Progress) FSO “Nautica Bergading” Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 22: FSO “Benchamas-2”
22 RLE and Conversion (93.40% Progress) FSO “Benchamas-2” Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 23: Dangote (CALM) Buoy
23 Fabrication, procurement, construction, testing and pre-commissioning (93.80% Progress) Dangote (CALM) Buoy Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 24: Financials
Financials Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 25: Income Statement, Sequential Quarter
25 Financial Updates Income Statement, Sequential Quarter • Revenue Income Statement (RM 'm) 4Q 2017 3Q 2017 • HEU – Higher revenue contributed by new Revenue 247.954 215.350 projects. Heavy Engineering 162.277 117.627 • MBU – Lower revenue due to lower value Marine 85.677 97.723 and number of vesse

Slide 26: Income Statement, Year-on-Year
26 Financial Updates Income Statement, Year-on-Year • Revenue • HEU – Completion of several offshore projects Income Statement (RM 'm) 12M 2017 12M 2016 whilst revenue from new projects will be mainly Revenue 956.414 1,191.298 recognised in 2018. Heavy Engineering 591.324 746.666 Marine 365.090 444.

Slide 27: Balance Sheet
27 Financial Updates Balance Sheet Balance Sheet (RM 'm) Dec 2017 Dec 2016* Non-Current Assets 1,839.433 1,857.528 Inventories 2.399 10.747 Receivables 848.379 1,052.111 • Total assets of RM3.386bn Cash 674.968 671.128 • Receivables & Payables – completion of Others 20.864 11.007 offshore projects T

Slide 28: Backlog & Order Intake
28 Financial Updates Backlog & Order Intake Backlog RM million Backlog 2,556 1,772 1,575 1,023 1,273 629 Dec12 Dec13 Dec14 Dec15 Dec16 Dec17 Backlog CPP Bokor December 2017 1 RM1,273.4m Benchamas Order Intake RM million Sepat Phase 2A Besar A Rapid (4 Packages) 550 Dangote CALM Buoy Others Marine Bu

Slide 29: Shareholding Information
29 Corporate Updates Shareholding Information Technip SA Share Price RM 8.50% 2.00 Lembaga Tabung Haji 6.69% 1.50 As at PNB & PNB As at 1.00 0.92 Unit Trust 31 Dec 2016 Funds 2.07% 29 Dec 2017 EPF 1.53% 0.82 1.00 29/12/2017 Other Malaysian Shareholders 11.83% 0.50 2016 2017 Foreign Investors 2.88% M

Slide 30: Highlights
Highlights Malaysia Marine and Heavy Engineering Holdings Berhad

Slide 31: MMHE EPIC Marine & Services Sdn Bhd (MEMS)
31 MMHE EPIC Marine & Services Sdn Bhd (MEMS) • Incorporated on 16 August 2016 as a JV between Malaysia Marine and Heavy Engineering Sdn Bhd (MMHE) and Eastern Pacific Industrial Corporation Berhad (EPIC) • 1st floating dock in East Peninsular Malaysia. A 5,000 tons floating dock with maximum liftin

Slide 32: Dry Dock 3 (DD3)
32 Dry Dock 3 (DD3) • FID approved by the Board of Directors on 26 April 2017 • DD3 offers flexibility to cater various types of vessel, especially LNG Carrier • Dock size of 350m (L) x 80m (W) x 14m (D) • Overall progress is 15.4% as at 30 Dec 2017 • DD3 is expected to commence operation in Q3 2020

Slide 33: Moving Forward
33 Moving Forward • Strategy & Initiatives • ~ RM4.0 billion ongoing HEU tenders • Developing Onshore Construction & Fabrication capabilities through process module and non O&G industry • Seizing available Floater Conversion opportunities in international market • Developing Oil & Gas Services for o

Slide 34: Malaysia Marine and Heavy Engineering Holdings Berhad
Malaysia Marine and Heavy Engineering Holdings Berhad
Source: Internet Archive copy of mhb.com.my
More decks from Malaysia Marine & Heavy Engineering Holdings Bhd.
Q4 2025 Earnings Presentation24 slides · Feb 23, 2026
Q3 2025 Earnings Presentation23 slides · Nov 14, 2025
Q2 2025 Earnings Presentation25 slides · Aug 22, 2025
Q1 2025 Earnings Presentation23 slides · May 27, 2025
Q4 2024 Earnings Presentation24 slides · Feb 19, 2025
Q2 2024 Earnings Presentation26 slides · Aug 21, 2024
All 35 Malaysia Marine & Heavy Engineering Holdings Bhd decks