Aventis Energy Inc · CSE:AVE
Aventis Energy — Investor Presentation (October 2026)
22 slides from Aventis Energy's investor presentation, Oct 29, 2026
Slide 1: Corporate Presentation October 2026
CSE: AVE | FRA: C0O0 | OTC: VBAMF CSE: AVE | FRA: C0O0 | OTC: VBAMF C O R P O R AT E P R E S E N TAT I O N 2 0 2 6 OCTO BER 2026
Slide 2: Legal Disclaimer
LEGAL DISCLAIMER WARNING TECHNICAL INFORMATION FORWARD-LOOKING INFORMATION This management presentation was prepared as a summary overview only of The scientific and technical information in this presentation regarding the Certain statements in this presentation constitute “forward-looking the curre
Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS GOLD-BEARING VMS AT SENECA HIGH-GRADE COPPER AT STING Hole SN05-57: 2.6 m of 3.05 g/t Au, 20.28% Zn, 0.94% Cu and 100 g/t 100% owned. Historical channel samples to 14.3% Cu over 3.12 m; 2024 Ag (historical core length). hole VB24-001 cut 20.5 m at 1.21% Cu. ANOMALOUS URANIUM AT
Slide 4: Project Portfolio
PROJECT PORTFOLIO G O L D F O C US SENECA VMS GO LD Br itish Colu mbia C o m m o d i t i e s : G o l d , s i l v e r, z i n c , c o p p e r, l e a d I n t e r e st : O pt i on t o a c q u i r e 1 0 0 % N ext : Ph a s e 1 wor k t o d e fi ne d r il l t a r g et s COPPER FOCUS STING CO PPER Ne wf ou n
Slide 5: Gold
01 GOLD SENECA VMS GOLD PROJECT | BRITISH COLUMBIA A gold-bearing VMS project with five target areas. 5 CSE: AVE | FRA: C0O0 | OTC: VBAMF
Slide 6: Seneca VMS Gold Project
SENECA VMS GOLD PROJECT 863.16 ha | Option to acquire 100% | 120 km by road from Vancouver PROJECT OVERVIEW: • Three contiguous claims, 863.16 ha, on the east side of the Chehalis River. • Road access by Highway 7 through Harrison Mills. Power line on the Project boundary. • Independent NI 43-101 te
Slide 7: Seneca VMS Gold Project: Four zones on one 4.5 km belt
SENECA VMS GOLD PROJECT Four zones on one 4.5 km belt; two drilled in detail DEPOSIT MODEL Four features of the Kuroko-type VMS model. Sea-floor hot springs Clusters along one horizon Metal sulphides laid down on an ancient sea The rest of the 4.5 km belt is the target floor by volcanic hot springs
Slide 8: Seneca VMS Gold Project: 100+ historical holes
SENECA VMS GOLD PROJECT 100+ historical holes; the high-grade intercepts carry gold DRILL INTERSECTIONS HISTORICAL HISTORY & DRILLING Main drilling programs ran from 1971 to 2006. Hole (year) Zone Int. (m) Zn % Cu % Pb % Ag g/t Au g/t SN05-57 (2005) Seneca 2.6 20.28 0.94 - 100 3.05 1971 to 2006 Minn
Slide 9: Seneca VMS Gold Project: Five target areas and Phase 1 program
SENECA VMS GOLD PROJECT Five target areas and a Phase 1 program to define drill targets PHASE 1 PROGRAM Four work streams recommended in the 2023 technical report. TARGET AREAS 5 TARGETS Reinterpretation of Data compilation Northeast block 800 × 800 m historical geophysics Block northeast of the Sen
Slide 10: Gold Market
GOLD MARKET RECORD DEMAND RISING PRICE 5,002 t US$3,432/oz Total demand in 2025, the first year above Record annual average in 2025, up 44% from 5,000 t, worth a record US$555B. US$2,386 in 2024. Sources: LBMA Gold Price PM averages (2026 is January to July). World Gold Council, Gold Demand Trends C
Slide 11: Copper
02 COPPER STING COPPER PROJECT | NEWFOUNDLAND AND LABRADOR A 100%-owned copper project, drilled in 2024. 11 CSE: AVE | FRA: C0O0 | OTC: VBAMF
Slide 12: Sting Copper Project
STING COPPER PROJECT ~3,675 ha | 100% owned | 10+ government-documented mineral occurrences GEOLOGY Three historical copper zones in the Bay of Islands ophiolite. 1 Jumbo Lode Gregory River Fault South bank of Jumbo Brook, 14 km south of Trout River; trail or helicopter access. Massive to disseminat
Slide 13: Sting Copper Project: All five 2024 holes intersected copper
STING COPPER PROJECT All five 2024 holes intersected copper 2024 DRILLING PROGRAM About 35 km northeast of York Harbour Metals’ York Harbour project. 14.3% Cu 9.0% Cu 1.21% Cu over 3.12 m, historical over 9.14 m, 1922 channel over 20.5 m from 81.8 m, channel sample sample VB24-001 Hole 2024 highligh
Slide 14: Copper Market
COPPER MARKET SUPPLY GAP DEMAND GROWTH 10 Mt +50% by 2040 Shortfall by 2040, about 25% below demand, From 28 Mt in 2025 to 42 Mt by 2040, with AI without meaningful new supply. and defence adding to demand. SUPPLY PEAK LONG LEAD TIMES 27 Mt in 2030 17 years Mined supply peaks in 2030, then falls to
Slide 15: Athabasca Uranium
03 ATHABASCA URANIUM CORVO URANIUM PROJECT | SASKATCHEWAN Operated by Standard Uranium. Drilled in winter 2026. Second-phase drilling planned for 2027. 15 CSE: AVE | FRA: C0O0 | OTC: VBAMF
Slide 16: Corvo Uranium Project
CORVO URANIUM PROJECT 12,364 ha | Option to earn 75% from Standard Uranium PROJECT OVERVIEW: • 14 mineral claims in the eastern Athabasca Basin region, near Wollaston Lake. Road accessible. • 60 km east of Cameco’s McArthur River mine and 45 km northeast of Atha Energy’s Gemini Mineralized Zone. • 2
Slide 17: Corvo Uranium Project: Historical uranium over 800 m of strike
CORVO URANIUM PROJECT Historical uranium over 800 m of strike; showings to 7.34% U₃O₈ PREVIOUS WORK Drilling in 1978 to 1979, surface showings and modern geophysics. Historical drilling, 1978 to 1979 Uranium over 800 m of strike Ten holes tested strong conductors; all ten TL-79-3: 0.116% U₃O₈ over 1
Slide 18: Corvo Uranium Project: Anomalous uranium in all nine holes
CORVO URANIUM PROJECT Anomalous uranium in all nine completed holes 2026 DRILL PROGRAM Funded by Aventis and operated by Standard Uranium. ANOMALOUS URANIUM WINTER 2026 Total metres of core by uranium threshold, nine completed holes. Manhattan, Brooklyn and Multi-kilometre mineralized Tribeca system
Slide 19: Uranium Market
URANIUM MARKET SUPPLY GAP RISING TERM PRICE 60,213 tU US$96.50/lb Mine output in 2024, trailing reactor demand Long-term price at September 30, 2026, up of about 67,000 tU. from US$83.00 a year earlier. Source: Cameco month-end prices (UxC and TradeTech). World Nuclear Association, Nuclear Fuel Repo
Slide 20: Management & Advisors
MANAGEMENT & ADVISORS M A NA G E M E NT MICHAEL MULBERRY JOHN EREN BRYCE CLARK, CPA PAUL CHUNG Chief Executive Officer & Director Director Chief Financial Officer Director • In mining since the mid-1990s. • VP Corporate Development, Gold Line • Principal of Bryce A. Clark & Associates Ltd., a • Co-f
Slide 21: Capitalization
CAPITALIZATION 9.6 million shares fully diluted 9.6M 1-for-10 shares fully diluted consolidation, effective October 1, 2026 ISSUED & OUTSTANDING 9,424,844 OPTIONS & WARRANTS 181,417 TOTAL 9,606,261 21 CSE: AVE | FRA: C0O0 | OTC: VBAMF
Slide 22: Contact
EMAIL: PHONE: 250 - 997 Seymour Street, [email protected] +1 (604) 229-9772 Vancouver, BC, V6B 3M1 C O R P O R AT E P R E S E N TAT I O N 2 0 2 6 CSE: AVE | FRA: C0O0 | OTC: VBAMF
Aventis Energy — Investor Presentation (October 2026) on 6ix