Empire Resources Limited · ASX:ERL

Empire Resources — Explorer's Conference 2012

38 slides from Empire Resources's conference presentation, February 2012

  1. Slide 1: Investor update – February, Explorer's Conference 2012

    Investor update – February Explorer’s Conference 2012 Advanced exploration of copper-gold 1 projects in WA

  2. Slide 2: Disclaimer

    Disclaimer This presentation is for information purposes only This presentation has been prepared by Empire Resources Limited (“Empire” or the “Company”) and contains general background information about Empire’s activities current as at the date of this presentation (“Information”). It is Informati

  3. Slide 3: Highlights – ERL

    Highlights – “ERL” ERL • FOCUS - advanced copper and gold projects • All projects j in Western Australia • Major tenement position in an emerging new base metals province at Yuinmery • JORC Resource of 1.07 million tonnes at 1.82% copper and 0.78g/t gold • Active resource expansion drilling • Experi

  4. Slide 4: Investment Case

    Investment Case • Large L footprint f t i t within ithi emerging i b base metals t l province i • Established quality resource and expanding g • Upside through exploration success confirmed • Additional exposure to advanced stage copper, gold and uranium assets • Sound, prudent, experienced manageme

  5. Slide 5: Current Activities

    Current Activities • Resource expansion drilling at Yuinmery project • Defining new resource, resource A Zone • Drilling at other Yuinmery prospects • Initial mining studies commenced at Yuinmery • Drilling at Wynne (100%) and Damperwah (70%) copper projects 5

  6. Slide 6: Other assets

    Other assets • 60% Pennys Find high grade gold resource – 52,000ozs 52 000ozs • 45% Troy Creek copper project with incoming party p spendingg $3M $ to earn over 3 years. • 28% equity in listed FYI Resources after disposal of uranium project 6

  7. Slide 7: About Empire

    About Empire Capital Structure Shares on issue: 150.0 million Unlisted options on issue: 13.93 million Market capitalisation: circa $7.5 million Directors Source: Paritech Tom Revy Chairman (Non-executive) Da id Sargeant David Managing Director Adrian Jessup Executive Director – Technical 7

  8. Slide 8: Yuinmery Project

    Yuinmery Project Greenstone Belts Tenement position in emerging Youanmi b base metall province i 8

  9. Slide 9: Yuinmery Project: Location – comparative projects

    Yuinmery Project Location – comparative projects 9

  10. Slide 10: Yuinmery Project: Location – comparative projects

    Yuinmery Project Location – comparative projects ƒGolden Grove Project – ƒ65mt @ 2.0% Cu and 0.7g/t Au (2011) ƒJaguar Project: (Leonora) ƒJaguar 3.2mt 3 2mt @ 1.8% 1 8% Cu, Cu 9.8% 9 8% Zn and 0.7 g/tAu (2011), ƒBentley Bentley 3.04mt @ 2.0% Cu, 9.8% Zn and 0.7g/t Au (2010), ƒTeutonic Bore 1.55mt @

  11. Slide 11: Yuinmery Project: Location – comparative projects

    Yuinmery Project Location – comparative projects ƒGolden Grove Project – ƒ65mt @ 2.0% Cu and 0.7g/t Au (2011) ƒJaguar Project: (Leonora) ƒJaguar J 32 t@1 3.2mt 1.8% 8% C Cu, 9 9.8% 8% Zn and 0.7 g/tAu (2011), ƒBentley 3.04mt 3 04mt @ 22.0% 0% Cu Cu, 9 9.8% 8% Zn and 0.7g/t Au (2010), ƒJust Deserts R

  12. Slide 12: Yuinmery Project: VMS deposit model

    Yuinmery Project VMS deposit model 12

  13. Slide 13: Yuinmery Project: Original copper-gold prospects

    Yuinmery Project Original copper-gold prospects 13

  14. Slide 14: Yuinmery Project: Geology and Prospects

    Yuinmery Project RESOURCES LIMITED Upper Felsic Volcanics 686 000 mE 688 000 mE Lower Felsic Volcanics Mafic Intrusives Granite Felsic Breccia Sulphides Fault Exhalite \EEUORL \ \ 6 888 a ye cael, -~ Claudius 6 836 OO) mN_ id = —— Yuinmery Project GEOLOGY and PROSPECTS

  15. Slide 15: Just Desserts Prospect

    Just Desserts Prospect Gossanous tuff

  16. Slide 16: Just Desserts Prospect

    Just Desserts Prospect Gossanous tuff outcrop

  17. Slide 17: Just Desserts Prospect

    Just Desserts Prospect Banded gossanous quartz outcrop

  18. Slide 18: Just Desserts Prospect

    Just Desserts Prospect Diamond drill cores

  19. Slide 19: Just Desserts Prospect

    Just Desserts Prospect Existing JORC resource, long section 19

  20. Slide 20: Just Desserts Prospect

    Just Desserts Prospect Cross section 20

  21. Slide 21: Just Desserts Prospect

    Just Desserts Prospect Development Study Options Study parameters • Based on current JORC Mineral Resource • Investigation options of 1. Small open cut to provide underground access AND 2 Larger open cut only 2. • Use of current metal prices, indicative metal recoveries, factors for dilution and ore

  22. Slide 22: Just Desserts Prospect

    Just Desserts Prospect Starter pit versus maximum pit extraction Schematic 22

  23. Slide 23: Just Desserts Prospect

    Just Desserts Prospect Option 1: Starter Pit access for U/G S h Schematic ti Target material within pit shell - 0.9Mt @ 1.1% Cu and 0.6g/t Au Target material available from u/g – 1.0Mt 1 0Mt @ 1.5% 1 5% Cu and 00.6g/t 6g/t Au The Targets are detailed on the following slide 23

  24. Slide 24: Just Desserts Prospect

    Just Desserts Prospect Path to development • Additional drilling required to: - 1. Increase mineral resource confidence 2 Explore 2. E l mineralisation i li ti extensions t i • Upgrade Mineral Resource Estimate • Metallurgical test work and processing options • Establish Ore Reserve 24

  25. Slide 25: Just Desserts Prospect

    Just Desserts Prospect Expansion of resource below 25

  26. Slide 26: A Zone Prospect

    A Zone Prospect Long Section and Deeper Drilling 26

  27. Slide 27: A Zone Prospect

    A Zone Prospect Long Section and Deeper Drilling 27

  28. Slide 28: Yuinmery Project

    Yuinmery Project Other targets being tested ƒ Numerous prospects with large coincident geochemical, geophysical anomalies indicative of a highly fertile VMS system with sparse drill coverage ƒ Systematic RAB, RC and diamond drilling required Examples ƒ C-Zone - 3.07m @ 3.09% Cu, and 0.2g/t Au and 0.

  29. Slide 29: Yuinmery Project

    Yuinmery Project Anomaly Compilation Drill Depth (m) 29

  30. Slide 30: Yuinmery Project

    Yuinmery Project Original tenements 30

  31. Slide 31: Yuinmery Project

    Yuinmery Project Expanded tenure Expanded tenement position Empire 100% 78 sq km La Manche Option 149 sq km TOTAL 227 sq km 31

  32. Slide 32: Yuinmery Project

    Yuinmery Project Expanded tenure Expanded tenement position Empire 100% 78 sq km La Manche Option 149 sq km TOTAL 227 sq km 32

  33. Slide 33: Yuinmery Project

    Yuinmery Project Target Testing Resources/potential 4 Sulphides found, not yet defined 4 Untested 8 Source of anomaly not yet found 8 33

  34. Slide 34: Yuinmery Project

    Yuinmery Project Comparative Study 34

  35. Slide 35: Yuinmery Project

    Yuinmery Project No environmental or heritage issues 35

  36. Slide 36: Summary

    Summary ƒ Large ground position ƒ Focused developer ƒ History of exploration success g geological ƒ Right g g setting g ƒ High grade copper and gold ƒ Growth through resources expansion ƒ Exploration upside on highly prospective targets: C-Zone, B-Zone Augustus, B-Zone, Augustus Smith Well ƒ Initial

  37. Slide 37: Investment Case

    Investment Case • Large L footprint f t i t within ithi emerging i b base metals t l province i • Established quality resource and expanding g • Upside through exploration success confirmed • Additional exposure to advanced stage copper, gold and uranium assets • Sound, prudent, experienced manageme

  38. Slide 38: Contact details

    C t t details: Contact d t il David Sargeant g Empire Resources Limited 53 Canning Highway Victoria Park WA 6100 08-9361-3100 0438-690-699 Contact us at [email protected] or via our web site: resourcesempire.com.au 38

Empire Resources — Explorer's Conference 2012 on 6ix