American Electric Power Company, Inc. · NASDAQ:AEP

American Electric Power — Credit Suisse 2011 Energy Summit

20 slides from American Electric Power's conference presentation, Feb 7, 2011

  1. Slide 1: Credit Suisse 2011 Energy Summit

    Credit Suisse 2011 Energy Summit February 7-8, 2011 1

  2. Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995

    “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934. Although AEP and each of its Registrant Subsidiaries believe that their expectations are

  3. Slide 3: Brian X. Tierney - EVP and CFO

    Brian X. Tierney - EVP and CFO 3

  4. Slide 4: American Electric Power

    American Electric Power Serving electric customers in ‰ Regulated Electric Utility 11 states – Regulatory and economic diversity – Operating Company Model ‰ Focus on Capital Allocation – Capital for Growth – Return of Capital to Shareholders – Pension Funding ‰ Strong Balance Sheet – Stable credit r

  5. Slide 5: 2011 Earnings Drivers

    2011 Earnings Drivers $3.50 $3.10 $3.03 0.32 $3.00 0.10 0.06 0.01 0.05 (0.22) (0.08) $2.50 (0.07) (0.05) (0.05) $2.00 $1.50 $1.00 $0.50 $0.00 Weather Other Utility Ohio OSS, net of Non-Utility Trans O&M, net of SEET Load Rate 2011E 2010A Costs, net Switching sharing / Parent Operations offsets Recov

  6. Slide 6: Normalized Load Trends

    Normalized Load Trends AEP Residential Normalized GWh Sales AEP Commercial Normalized GWh Sales %Change vs. Prior Year %Change vs. Prior Year 15% 15% 10% 10% 5% 5% 2.1% 1.3% 2.0% -0.3% 0.6% 1.9% 0.7% 0% 0% -1.2% -0.3% -0.4% -1.6% -1.6% -5% -5% 1Q10 2Q10 3Q10 4Q10 YTD 10 2011E 1Q10 2Q10 3Q10 4Q10 YTD

  7. Slide 7: 2011 Guidance and Business Initiatives

    2011 Guidance and Business Initiatives 2011 Guidance: $3.00 - $3.20 per share 2011 Earnings Drivers Business Initiatives ¾ Recovering Economy ¾ Operating Transcos in OH, ¾ Rate changes (69% secured) OK and MI; filings pending in other states ¾ Continued O&M discipline - $34M decrease net of offsets

  8. Slide 8: AEP Ohio ESP Filing – Core Policy Issues

    AEP Ohio ESP Filing – Core Policy Issues Investment in Ohio Jobs in Ohio Energy Security Supports economic Jobs are a key Secure, reliable and development and component of growth predictable electricity essential tax base potential in Ohio supply is basis for sustained investment and employment in O

  9. Slide 9: Transmission as a Growth Engine

    Transmission as a Growth Engine Cumulative Capital Spending, ‰ Electric Transmission Texas (ETT) After Ownership Division ($M) Annual Earnings Potential ($M) $7,000 $350 – Growing Rate Base High Case – $1.1B CREZ opportunity; Received $6,000 AEP Transco $300 CCN approval on one CREZ line; 3 PATH + P

  10. Slide 10: Earnings and Dividends

    Earnings and Dividends On-Going EPS History Since 2004 Dividend History Since 2004 $/share $/share 3.60 2.00 3.40 .1% .0 % $1.84 = 4 1.80 4 R $3.24 = 3.20 C AG $3.10 G R $1.71 $3.00 $2.97 $3.03 A $1.64 $1.64 C $1.58 3.00 1.60 $2.77 $1.50 2.80 $2.73 $1.40 $1.42 2.60 1.40 $2.33 2.40 1.20 2.20 2.00 1.0

  11. Slide 11: Long-term EPS Growth Rate

    Long-term EPS Growth Rate ‰ 4-6% EPS growth 2012-14 – Average annual capital spend between $2.9-3.4B Average Annual EPS Growth – Utility platform replacement capital defined over two periods of about $1.4B (annual depreciation) – Growth in rate base of $1.5-2.0B Period of 4-6% average per year, allo

  12. Slide 12: AEP Highlights

    AEP Highlights ‰ Premier Utility Platform ‰ Traditional and Effective Regulatory Relationships ‰ Energy Policy Initiatives Create Technology Deployment and Investment Opportunity ‰ Strong Value and Total Return Proposition Mountaineer Plant (WV) 12

  13. Slide 13: Appendix

    Appendix 13

  14. Slide 14: Highly Diversified Regulated Utility Platform

    Highly Diversified Regulated Utility Platform 2010 On-Going Earnings 2010 Retail Load Contribution Public Service of Kentucky Southwestern Oklahoma Power 3% Wholesale * 10% Electric 6% Power 11% Residential Ohio Power 30% 24% Texas Industrial 8% 33% All Others Columbus 5% Southern Power Indiana & 17

  15. Slide 15: Detailed Ongoing Earnings Guidance

    Detailed Ongoing Earnings Guidance 2010A: $3.03 2011E: $3.00 - $3.20 American Electric Power Financial Results for 2011 Guidance vs 2010 Actual 2010 2011 Actual Guidance Performance Driver ($ millions) Performance Driver ($ millions) UTILITY OPERATIONS: Gross Margin: 1 East Regulated Integrated Util

  16. Slide 16: Capital Expenditures

    Capital Expenditures $3,000 $2,900 $2,615 AEP Transco $2,487 $350 $2,500 $160 JV Equity $1 $47 $113 $280 Contributions, net $77 $2,243 $34 AEP River Ops & $50 $223 Other Non-Utility $457 $24 $56 Environm ental $2,000 $303 $319 $256 New Generation $ in millions $62 $263 $82 $133 Corporate/Other $1,50

  17. Slide 17: Capitalization & Liquidity

    Capitalization & Liquidity 70% Total Debt/Capitalization Current Liquidity Summary 65% Liquidity Summary Actual 62.5% (unadited) 12/31/10 60.7% ($ in millions) Amount Maturity 59.1% 59.1% Revolving Credit Facility $1,500 Jun-13 60% Revolving Credit Facility 1,454 Apr-12 57.2% 57.2% 57.0% 1 Revolving

  18. Slide 18: Cash Flow Guidance

    Cash Flow Guidance $ in millions 2010A 2011E Cash From Operations Income from Continuing Operations $ 1,218 $ 1,499 Depreciation & Amortization 1,641 1,611 Pension Funding (500) (150) Other Cash Flow Items 659 834 Ligigation Resolution 1 - (449) Working Capital 2 279 7 Cash From Operations $ 3,297 $

  19. Slide 19: Rate Changes

    Rate Changes $700 Pending/Future $600 Settlement on file pending approval $500 Secured $ in millions $400 $659 $300 $527 $235 $450 $28 $200 $45 $352 $329 $100 $162 $0 2006A 2007A 2008A 2009A 2010E 2011E Note: Rate changes in this chart exclude revenues with offsetting costs Active or pending rate ca

  20. Slide 20: Approved Rate Bases & ROEs

    Approved Rate Bases & ROEs Jurisdiction Rate Base Approved ROE Approved Debt/Equity Effective Date APCo-Virginia * 10.53% 58/42 8/1/2010 $2,060MM APCo-West Virginia $1,656MM 10.50% 57/43 7/28/2006 KPCo-Kentucky $995MM 10.50% 57/43*** 6/30/2010 I&M-Indiana $2,000MM 10.50% 44/56 3/4/2009 I&M-Michigan

American Electric Power Company — Credit Suisse 2011 Energy Summit on 6ix