CREDIT SUISSE 2010 ENERGY SUMMIT Vail, CO February 2, 2010 Mountaineer Plant (WV) 345-kV Transmission Line

Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995
“Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934. Although AEP and each of its Registrant Subsidiaries believe that their expectations are

Slide 3: Brian X. Tierney - EVP and CFO
Brian X. Tierney - EVP and CFO 3

Slide 4: AEP Value Proposition
AEP Value Proposition Regulated Utility Platform ― Diversified service territory ― Successful regulatory track record ― Value compared to regulated peer group Earnings Growth Prospects ― Investment in utility platform greater than depreciation level (2 - 4%) ― With transmission opportunities (4

Slide 5: Highly Diversified Regulated Utility Platform
Highly Diversified Regulated Utility Platform 2009 Earnings Contribution Kentucky Public Power Service of Southwestern 2% Oklahoma Electric 5% Power Ohio 9% Power Texas 22% 7% All Others Columbus 6% Southern Power 20% Indiana & Michigan Appalachian 16% Power 13% 2009 Retail Load Fuel Mix Wholesale *

Slide 6: Traditional Rate Making Environment
Traditional Rate Making Environment Growth in Net PP&E Track Record of Rate Relief $40.0 $800 .9% Secured 6 Pending/Future $700 $35.0 R =~ $36.3 G $35.3 E CA $34.3 $600 PP& $33.0 011 $500 $ in billions $30.0 2 $ in millions - 2 005 $29.9 $400 $26.8 $320 $340 $25.0 $659 $300 $24.3 $527 $153 $450

Slide 7: Utility Operations Capital Expenditures
Utility Operations Capital Expenditures $4,500 $3,914 $3,852 $4,000 AMI/gridSMART $28 $3,522 $3,500 Environm ental $994 $887 New Generation $3,000 $2,783 $1,366 $525 $2,393 Corporate/Other $ in millions $2,500 $891 $811 $149 $30 $90 Nuclear $146 $457 $2,044 $1,961 $2,000 $95 Generation $114 $133 $59

Slide 8: Transmission Investment Opportunities
Transmission Investment Opportunities ETT: Projects in Texas ERCOT jurisdiction ― $600MM of projects est. in service 2010- 2013 ― ETT’s opportunity could reach $3.0B in the next decade Transco: Within our existing footprint ― Provides opportunity to: ― Develop new AEP-only projects ― Reduce regulato

Slide 9: 2010 Ongoing Earnings Guidance
2010 Ongoing Earnings Guidance 2009A: $2.97 2010E: $2.80-$3.20 Utility Operations $ 2.87 $ 3.01 Transmission Operations $ 0.01 $ 0.02 Nonutility Operations $ 0.19 $ 0.09 Parent & Other $(0.10) $(0.12) $2.97 0.45 $3.00 $3 0.29 (0.14) (0.17) (0.03) 0.12 (0.36) $2 • Other Revenue (0.13) • D&A • Other T

Slide 10: Normalized Load Trends
Normalized Load Trends AEP Residential Normalized GWh Growth AEP Commercial Normalized GWh Growth %Change vs. Prior Year %Change vs. Prior Year 5% 5% 3% 1.1% 1.0% 2.4% 3% 0% 0% -3% -0.9% -0.7% -0.8% -0.7% -0.5% -0.8% -1.8% -1.4% -3% -1.3% -5% -5% -8% -8% -10% -10% 1Q09 2Q09 3Q09 4Q09 YTD09 2010E 1Q0

Slide 11: Additional 2010 Earnings Drivers
Additional 2010 Earnings Drivers 2010 Guidance: $2.80 - $3.20 O&M Assumptions Rate Relief Assumptions $23MM increase over 2009, net of $320MM, net of trackers revenue offsets $167MM secured Includes $80MM increase in AR, OH, OK, VA, WV employee and operational expenses Active or pending

Slide 12: Investment Attributes
Investment Attributes Strong utility platform Consistent regulatory outcomes Active fuel recovery Geographic and regulatory diversity Growth through capital investment Consistent dividend policy 50-60% payout ratio targeted Nearly a century of dividend payments to shareholders Grow

Slide 13: Appendix
13 AMERICAN’ ELECTRIC POWER IX 13

Slide 14: Detailed Ongoing Earnings Guidance
Detailed Ongoing Earnings Guidance 2009A: $2.97 American Electric Power 2010E: $2.80 - $3.20 2009 Actual vs. 2010 Guidance 2009 Actual 2010 Guidance Performance Driver ($ millions) Performance Driver ($ millions) UTILITY OPERATIONS: Gross Margin: 1 East Regulated Integrated Utilities 66,976 GWh @ $

Slide 15: Multi-Year Capital Investment Funding Plan
Multi-Year Capital Investment Funding Plan Actual Projection 2009 2010 Capital Expenditures (Excluding AFUDC) $ (2,791) $ (2,310) Transmission Initiatives (JV Equity Contributions) (43) (89) Dividend on Common Stock (759) (786) Cash Sources (Uses) Cash from Operations 2,484 3,775 Proceeds from Sale

Slide 16: Utility Operations Capital by Subsidiary
Utility Operations Capital by Subsidiary ($ in millions) 2010E 2011E Total APCo $380 $294 $674 I&M $265 $238 $503 KPCo $52 $71 $123 Texas Wires $142 $256 $398 PSO $166 $150 $316 SWEPCo $446 $461 $907 CSP $256 $187 $443 OPCo $302 $267 $569 Other Utility Companies $35 $37 $72 Total Utility Operations

Slide 17: Capitalization & Liquidity
Capitalization & Liquidity 70% Total Debt/Capitalization Current Liquidity Summary Liquidity Summary Actual 65% (unaudited) 12/31/09 62.5% ($ in millions) Amount Maturity 60.7% Revolving Credit Facility $1,500 Mar-11 60% 59.1% 59.1% Revolving Credit Facility 1,454 Apr-12 57.2% 57.2% Revolving Credit

Slide 18: AEP Credit Ratings
AEP Credit Ratings Current Ratings for AEP, Inc. & Subsidiaries Moody's S&P Fitch Senior Senior Senior Company Unsecured Outlook Unsecured Outlook Unsecured Outlook American Electric Power Company Inc. Baa2 N BBB S BBB S AEP, Inc. Short Term Rating P2 N A2 S F2 S AEP Texas Central Company Baa2 S BBB

Slide 19: Long-term Debt Maturity Profile
Long-term Debt Maturity Profile ($ in millions) Year 2010 2011 2012 AEP, Inc. $ 490 $ - $ - AEP Generating Company $ - $ 130 $ - Appalachian Power $ 200 $ 250 $ 250 Columbus Southern Power $ 150 $ - $ 45 Indiana Michigan Power $ - $ - $ 100 Kentucky Power $ - $ - $ - Ohio Power $ 679 $ - $ - Public

Slide 20: Summary Rate Case Information
Summary Rate Case Information APCo Virginia General Rate Case – Docket #PUE-2009-00030 On August 14, 2009, APCo filed an update to its pre-biennial base rate case, originally filed July 15, 2009 with the Virginia SCC, per the statute, for recovery of generation and distribution costs requesting an i

Slide 21: Summary Rate Case Information
Summary Rate Case Information SWEPCO Texas General Rate Case – Docket #37364 On August 28, 2009 SWEPCO filed a base rate case with the Public Utility Commission of Texas requesting an increase of $75 million to cover costs related to the construction of the Stall and Turk plants as well as enhanced

Slide 22: Summary Rate Case Information
Summary Rate Case Information Kentucky General Rate Case – Docket #2009-00459 On December 29, 2009, KPCo filed a base rate case with the Kentucky Public Service Commission requesting an increase of $123.6 million to cover costs related to enhanced distribution reliability spending, depreciation of c

Slide 23: Summary Rate Case Information
Summary Rate Case Information I&M Michigan General Rate Case – Docket #U-16180 On January 27, 2010, I&M filed a base rate case with the Michigan Public Service Commission requesting an increase of $62.5 million to cover increased costs related to distribution O&M, taxes, interest and employee relate

Slide 24: Coal Procurement – 2010 Projected
Coal Procurement – 2010 Projected AEP East Total AEP System Colorado/Utah 2% Illinois Basin 2% Central Northern Northern Appalachian Appalachia Powder River Appalachia Basin 26% 41% 33% 39% Illinois Basin 1% Powder River Basin Colorado/Utah 1% 29% Lignite 5% Central Appalachia AEP West 21% Lignite 2

Slide 25: JV Strategy – Nationwide Grid Expansion
JV Strategy – Nationwide Grid Expansion SPP ERCOT PJM PJM/MISO Prairie Wind COD: 2013-14 ETT COD: 2010-2017 PATH-WV COD: 2014 Pioneer COD: 2015 110 miles of 765 kV 345 kV ERCOT Expansion 275 miles of 765 kV 240 miles of 765 kV Partners: Westar (50%) & MidAmerican Partner: MidAmerican Ene

Slide 26: Electric Transmission Texas, LLC
Electric Transmission Texas, LLC Overview: ETT is a 50/50 JV between AEP and MidAmerican Energy Holding Company that plans to construct and operate transmission projects within ERCOT with an investment opportunity of more than $3 billion. Current JV rate base is $127 million with a debt to capit

Slide 27: EHV Transmission in PJM: PATH
EHV Transmission in PJM: PATH Project Description: 275 miles of 765-kV transmission line from AEP’s John Amos substation near St. Albans, W.Va., through a new midpoint station, ending at a new substation near Kemptown, MD. Overview: FERC order issued on February 29, 2008 approving: ― Cash return o

Slide 28: Prairie Wind Transmission, LLC
Prairie Wind Transmission, LLC Overview: In May 2008, ETA signed an agreement with Westar Energy to form Prairie Wind Transmission, LLC (PWT). PWT is a 50/50 JV that is proposing to build approximately 110 miles of 765-kV lines extending from Wichita, KS. The project will provide enhanced elec

Slide 29: Tallgrass Transmission, LLC
Tallgrass Transmission, LLC Overview: In July 2008, ETA signed an agreement with Oklahoma Gas & Electric to form Tallgrass Transmission, LLC (TG). TG is a 50/50 JV that is proposing to build approximately 170 miles of 765-kV lines in Oklahoma The project will promote wind development in the we

Slide 30: Pioneer Transmission, LLC
Pioneer Transmission, LLC Overview: In August 2008, AEP signed an agreement with Duke Energy to form Pioneer Transmission, LLC (PT). PT is a 50/50 JV that is proposing to build approximately 240 miles of 765-kV lines extending from AEP’s Rockport Station to Duke’s Greentown station in Indiana.

Slide 31: Upper Midwest EHV Development—SMART Study
Upper Midwest EHV Development—SMART Study Project Description: a comprehensive study of the transmission needed in the Upper Midwest to support renewable energy development and transporting that energy to consumers throughout the study area. The SMART Study will develop EHV overlay alternative that
Source: Internet Archive copy of test22.aep.com
More decks from American Electric Power Company, Inc.
Q3 2026 Earnings Presentation40 slides · Oct 28, 2026
Q3 2026 Earnings Presentation12 slides · Oct 28, 2026
Q2 2026 Earnings Presentation41 slides · Jul 30, 2026
Q2 2026 Earnings Presentation39 slides · Jul 30, 2026
Q2 2026 Earnings Presentation12 slides · Jun 30, 2026
Q1 2026 Earnings Presentation39 slides · May 5, 2026