Tata Power Company Limited · NSE:TATAPOWER

Tata Power — The Tata Power Company — Investor Presentation (October 2009)

66 slides from Tata Power's investor presentation, October 2009

  1. Slide 1: The Tata Power Company Ltd Investor Presentation October 2009

    Presentation Title The Tata Power Company Ltd October Presentation 2009 Subtitle 1

  2. Slide 2: Disclaimer

    Disclaimer Certain statements made in this presentation may not be based on historical information or facts and may be “forward looking statements”, including those relating to The Tata Power Company Limited’s general business plans and strategy, its future outlook and growth prospects, and future d

  3. Slide 3: Agenda

    Agenda Part A: Overview of Tata Power Part B: Tata Power Part C: Projects Part D: Other Power Businesses Part E: Other Businesses Part F: Financial Performance Part G: Sustainability 3

  4. Slide 4: Part A: Overview of Tata Power

    Part A: Overview of Tata Power

  5. Slide 5: A Tata Company

    A Tata Company Business Sectors Revenue Largest Companies FY 2009 15% Rs 325,334 cr $ 71 bn 24% 45% 3% 6% 3% 4% Profits FY 2009 Rs 8,163cr 25% $ 1.8 bn -30% 59% 10% 16% 12% 8% 5

  6. Slide 6: Tata Power Group – Major Investments

    Tata Power Group – Major Investments Tata Power Subsidiaries Joint Ventures Investments & Associates Coastal Gujarat Power 7% TTML 100% 30% KPC Ltd. (Mundra UMPP) Trust Energy Resources 8% TTSL 100% 30% Arutmin Pte. Ltd Indocoal 40% Panatone Maithon Power Ltd. 30% 74% Tubed Coal 17% Tata Comm.* Indu

  7. Slide 7: Businesses

    Businesses • Trombay 11, 12, 17 • Hydro 11, 13 • Jojobera 19 • Belgaum 18 Generation Division • Haldia 17 • Wind Farm 21 Other Entities • Solar PV 47 Transmission • Mundra 24-28 • Maithon 29-31 • Tata Steel JV (IEL) 20, 32 • Dagachhu Power Business Distribution • Mumbai 14 • Powerlinks 43 • Mumbai 1

  8. Slide 8: Part B: Tata Power

    Id TATA Part B: Tata Power

  9. Slide 9: Generation: Business Models

    Generation: Business Models Returns Upside Value Drivers Our Projects Regulated Normative RoE Savings on Norms. Operational Mumbai License Area, PLF incentive Efficiency Maithon, Wind Captive Power PPA driven Merchant sales + Trading Jamshedpur (PH6), Plant Saving on agreed Capabilities + Jojobera t

  10. Slide 10: Existing Presence

    Existing Presence Mumbai 2027 MW Captive Coal Blocks: 1. Jharkhand: Tubed Block,40% stake Mumbai License Area 2. Orissa: Mandakini Block, 33% stake Generation Powerlinks Thermal 1480 MW NDPL Hydro 447 MW Distribution Gujarat 50 MW Jojobera 428 MW Transmission Jamshedpur (IEL)120 MW Merchant Capacity

  11. Slide 11: Mumbai License Area (LA) - Generation

    Mumbai License Area (LA) - Generation Thermal Hydro Trombay - Thermal Unit Capacity Fuel Location Capacity Unit 4* 150 MW Oil & Gas Khopoli 72 MW Unit 5 500 MW Oil, Coal & Gas Bhivpuri 75 MW Unit 6 500 MW Oil & Gas Bhira 300 MW Unit 7 180 MW Gas Total 447 MW Unit 8 150 MW Coal Total 1480 MW * Unit 4

  12. Slide 12: LA Generation Performance - Thermal

    LA Generation Performance - Thermal Generation (MU) Availability (%) PLF (%) Aux. Consumption (%) “Greentech Safety Gold Award 2008” for Outstanding achievement in Safety Management for the 5th consecutive year in Apr 08 12

  13. Slide 13: LA Generation - Hydro

    LA Generation - Hydro Generation (MU)* Availability (%) *Decrease due to adherence to KWTA limits PLF (%) Aux. Consumption (%) Bhira PSU - CEA Silver Shield for 2nd best performing station in the country 13

  14. Slide 14: LA Transmission

    LA Transmission • Around 1100 ckm network comprising of 973 ckm of 220 kV / 110 kV overhead lines and 124 ckm of 220 kV / 110 kV underground cables. • Two Extra High Voltage (EHV) lines capacity augmented (170 MVA to 350 MVA) by replacement of the conductor with new technology “High Ampacity conduct

  15. Slide 15: LA Distribution

    LA Distribution • “… Tata Power Company Ltd. is entitled to effect supply of electrical energy in retail directly to consumers, whose maximum demand is less than 1000 KVA, apart from its entitlement to supply energy to other licensees for their own purposes and in bulk …” - Hon’ble SC • “ … use of t

  16. Slide 16: Customer Profile - LA

    Customer Profile - LA Residential Sales (MUs) Commercial 4% 21% Essential 40% Industrial 35% Top 10 Customers Consumption R evenue (Rs. FY09 Name (MU) Cr) FY09 FY09 MU's % Revenue % Railway 348.08 212.75 32.50% 36.90% R. C. F. Ltd. 75.73 42.35 7.07% 7.35% Hindustan Petroleum Corporation Ltd. 49.04 2

  17. Slide 17: Merchant Capacity

    Merchant Capacity Haldia Trombay - Unit 8 Project Capacity 100 MW 100 MW Customers PPA with Tata Power Trading PPA with Tata Power Trading Hot flue gases from Hoogly Fuel Imported Coal Metcoke Note: Remaining 20 MW in Haldia under PPA to WBSEDCL Haldia Trombay Unit 8 17

  18. Slide 18: Belgaum

    Belgaum Capacity • 81 MW Generation (MU) Fuel Type • Heavy Fuel Oil Customer • KPTCL • 12 year PPA till 2012 Business • Bid Driven – Case 2 Model • Fuel charge is pass through • Other charges recovered as fixed PLF (%) 19 27 33 63 cost 18

  19. Slide 19: Jojobera

    Jojobera Capacity • 428 MW Generation (MU) • Unit 1: 67.5 MW, Unit 2-4: 120 MW each Fuel Type • Domestic Coal Customer • Tata Steel • 20 year PPA till 2017 Business • Captive Model • Fuel and Interest are a pass through • Other expenses on normative basis PLF (%) 77 73 76 80 1st Prize for Ash manage

  20. Slide 20: PH-6 (IEL)

    PH-6 (IEL) Capacity • 120 MW Ownership • IEL (74:26 JV of Tata Power and Tata Structure Steel Fuel Type • Coke Oven Gases of Tata Steel Customer • Tata Steel Business • Captive Model • Fuel and Interest are a pass through • Other expenses on normative basis 20

  21. Slide 21: Wind

    Wind Capacity • 195 MW Generation (MU) Customer • Maharashtra: PPA with TPC-D (62 MW) PPA with TPTCL (34 MW) • Karnataka: BESCOM (50 MW) • Gujarat: GUVNL (30 MW) 3rd Party Sale: (20 MW) Business • Regulated Model • Tariff based on State regulations PLF (%) 18 19 20 19 Tariff Annual (Rs / kwh) Escala

  22. Slide 22: Part C: Projects

    TATA ry | Part C: Projects

  23. Slide 23: Generation Projects Under Implementation

    Generation Projects Under Implementation Maithon1050 MW Mundra 4000 MW Jojobera 120 MW Maharashtra 98 MW Thermal 5170 MW Wind 98 MW 23

  24. Slide 24: Mundra UMPP

    Capacity • 4000 MW (5 x 800 MW) Ownership Structure • 100% subsidiary; Coastal Gujarat Power Limited Business Model • Case 2 – Bid Driven Fuel Requirement • Imported Coal, 11-12 mtpa Fuel Source • Offtake agreement with KPC and Arutmin for 10.11 ± 20% • Looking for additional mines in Australia, Moz

  25. Slide 25: Mundra UMPP

    Current Status • Overall 31% work completed; 6000 people on site Construction • Unit 1: 80% structural erection for boiler and TG deck complete Activities • Unit 2: 75% structural erection for boiler complete • Unit 3, 4, 5: Progress on track • Cooling water conduit laying ~ 50% done. PCC and RCC wo

  26. Slide 26: Mundra – Site Photographs

    Mundra – Site Photographs 26

  27. Slide 27: Mundra – Site Photographs

    Mundra – Site Photographs Use of Heavy Equipment like this 1250 Ton Crane has accelerated project execution 27

  28. Slide 28: Mundra – Site Photographs

    Mundra – Site Photographs Front view of Chimney and Boiler Structure Cooling Water Pump House 28

  29. Slide 29: Maithon

    Capacity • 1050 MW (2 x 525MW) Ownership Structure • 74: 26 JV of Tata Power and Damodar Valley Corporation Business Model • CERC Regulated Fuel Requirement • Domestic Coal Fuel Source • 100% linkage sanctioned. Active discussions on to sign Fuel Supply Agreements with coal mines Customers • DVC (30

  30. Slide 30: Maithon

    Current Status • Over 60% of work completed Construction • Unit 1: Boiler drum lifting complete. Condenser erection started Activity • Unit 2: Boiler drum lifting complete • Slip form erection for chimney completed till 183 m • Intake channel pump house work on track • Open access granted by PGCIL f

  31. Slide 31: Maithon – Site Photographs

    Maithon – Site Photographs 31

  32. Slide 32: Jojobera #5

    Jojobera #5 Project Capacity • 120 MW Ownership Structure • IEL Business Model • CPP Funding • Project Cost: Rs 620 Crores • D/E 70:30 Completion • December 2009 Construction • Over 72% completed Activity • 132kV switchyard foundation 90% complete • Chimney shell erection complete Project Descriptio

  33. Slide 33: Jojobera (Unit 5)

    Jojobera (Unit 5) Boiler Erection in Progress HP Heaters Under Erection 33

  34. Slide 34: Captive Coal Blocks

    Captive Coal Blocks Mandakini Coal Block • 7.5 MTPA (jointly allotted with Jindal Photo Film and Monnet Ispat & Energy - each JV Partner having a share of 2.5 MTPA) at Dist. Angul, Orissa • Mining plan approved by MoC • Application of ground water submitted to CGWA on Apr 09 • Environment Clearance,

  35. Slide 35: Other Projects in Pipeline

    Other Projects in Pipeline Generation Project Fuel Source Capacity (MW) Tubed IPP Captive Coal - Tubed 500 Naraj Marthapur IPP Captive Coal - Mandakini 1000 Corus (Tata Steel) Production Gases (Corus) 525 Coastal Maharashtra (Dehrand) Imported Coal 2400 Jharkhand CPP (Tata Steel) Supply by Tata Stee

  36. Slide 36: Generation Capacity (Tata Power Group)

    Generation Capacity (Tata Power Group) 10000 8242 Added in the Year 2400 8000 Total Capacity at Year End 5842 6000 1600 Capacity 4242 1138 4000 3104 2786 318 421 2000 2365 0 2008 2009 2010 2011 2012 2013 Fiscal Year Ended (March 31st) 36

  37. Slide 37: Part E: Other Power Businesses

    Part E: Other Power Businesses

  38. Slide 38: Indonesian Coal Mines

    Indonesian Coal Mines Organizational Structure Offtake Agreement • 40% representation on the Board of • 10.1+ 20% MT on a take or pay basis Commissioners and the Board of Directors • Indocoal Resources (Cayman) agrees to with affirmative rights trade outside of India any coal that Tata • CFOs at KPC

  39. Slide 39: Indonesian Coal Mines

    Indonesian Coal Mines CY08 Performance • Quantity mined ~ 52.8MT • Average realised price per tonne (FOB) – USD 73.28 • EBITDA from Operations – USD 1131 million Source – Bumi Resources Debt Repayment Schedule Loan Loan Amount Interest Maturity Repayment Details Amount O/S Rate (USD mn) (USD mn) Non

  40. Slide 40: Indonesian Coal Mines – Structure of Investment

    Indonesian Coal Mines – Structure of Investment Tata Power Company Ltd. (India) Bhivpuri Bhira Investments Ltd. Investments Ltd. (Cyprus) (Mauritius) Indocoal KPC Arutmin (Cayman Islands) (Indonesia) (Indonesia) Bumi Resources (Indonesia) 40

  41. Slide 41: Shipping Subsidiaries

    Shipping Subsidiaries • Trust Energy Asia Ltd incorporated in Singapore for owning ships to meet shipping requirements and trading in fuels, Eastern Energy Private Ltd incorporated for chartering of ships • Present shipping requirements of 8 vessels for Mundra • To be met through a combination of lo

  42. Slide 42: North Delhi Power Limited (NDPL)

    North Delhi Power Limited (NDPL) PAT Rs. crore Customer Base • >1 million customers with 5000 MUs of consumption Business Model • Regulated Revenue • Rs 2479 Cr Regulated • Rs 685 Cr Equity Incentives* 55 72 53 79 * Reset of Target AT&C losses after FY07 for next 5 years ROE % • 16% on capitalized a

  43. Slide 43: Powerlinks Transmission Limited

    Powerlinks Transmission Limited Capacity • 1200 km 400 kV double-circuit PAT Rs. crore transmission lines Business Model • Regulated Revenue FY09 • Rs 255 Cr Regulated Equity • Rs 463 Cr ROE % • 14% (15.5% w.e.f 1st April, 2009) Incentive • As a percent of equity on availability Structure above Targ

  44. Slide 44: Tata Power Trading Company Limited

    Tata Power Trading Company Limited TPTCL Sales (MU) 4000 TPTCL is currently the third largest trading company with 9.26% market share 3000 2000 FY09: Revenue – Rs 2167.3 Cr, PAT – Rs 7.6 Cr, 1000 Dividend – 20% (PY: 20%) 0 FY05 FY06 FY07 FY08 FY09 16000 14000 12000 10000 8000 INR / MWh 6000 4000 200

  45. Slide 45: Part F: Other Businesses

    Id TATA Part F: Other Businesses Lighting up Lives! ye *

  46. Slide 46: Strategic Electronics Division (SED)

    Strategic Electronics Division (SED) • Revenues of Rs.101 crores (Mar 09) against Rs.55 crores during the previous year. • First batch of Pinaka Launchers was successfully subjected to Factory Acceptance Tests (FAT) by the Ministry of Defence • SED completed the delivery of Air Defence Systems based

  47. Slide 47: Tata BP Solar

    Tata BP Solar • 51:49 JV between BP Solar and Tata Power • Market leader in Solar Photovoltaic technology in India with a turnover of Rs 1147 crores in FY09 • The turnover of the Co. in India and SAARC region is about Rs. 270 crores. With exports to BP Solar accounting for about Rs. 877 Crores • Nea

  48. Slide 48: Part G: Financial Performance

    Part G: Financial Performance

  49. Slide 49: Standalone - Year Ended March 31, 2009

    Standalone - Year Ended March 31, 2009 Rupee in Billions FY09 FY08 Operating Income 72.36 59.16 Operating Expenditure (61.17) (49.86) Operating Profit 11.19 9.37 Interest & Finance Charges (3.06) (1.68) Depreciation (3.29) (2.91) Other Income 4.88 4.66 Profit Before Tax 11.16 9.70 Provision for Taxe

  50. Slide 50: Standalone – Q1 FY10

    Standalone – Q1 FY 10 Rupee in Billions Q1 FY10 Q1 FY09 Operating Income 20.16 20.26 Operating Expenditure (13.83) (17.21) Operating Profit 6.33 3.05 Interest & Finance Charges (1.18) (0.52) Depreciation (1.11) (0.73) Other Income 1.08 0.87 Profit Before Tax 5.10 2.67 Provision for Taxes (1.33) (0.7

  51. Slide 51: Consolidated - Year Ended March 31, 2009

    Consolidated - Year Ended March 31, 2009 Rupee in Billions FY09 FY08 Operating Income 175.88 108.91 Operating Expenditure (143.22) (88.02) Operating Profit 32.66 20.89 Interest & Finance Charges (7.09) (4.99) Depreciation (6.57) (5.59) Other Income 3.99 4.79 Profit Before Tax 24.64 15.53 Provision f

  52. Slide 52: Consolidated – Q1 FY10 (Unaudited)

    Consolidated – Q1 FY 10 (Unaudited) Rupee in Billions Q1 FY10 Q1 FY09 Operating Income 47.13 40.69 Operating Expenditure (35.07) (33.71) Operating Profit 12.07 6.98 Interest & Finance Charges (2.06) (1.48) Depreciation (2.01) (1.52) Other Income 0.69 0.63 Profit Before Tax 8.68 4.61 Provision for Ta

  53. Slide 53: Equity Requirement till FY12

    Equity Requirement till FY12 Rs crores Project FY10 FY11 FY12 Mundra 804 1271 1229 Maithon 500 249 - Tubed Coal SPV 17 21 33 Mandakini Coal SPV 10 15 34 Shipping SPV - 68 - Daggacchu 44 19 7 Standalone Capex 425 410 419 Total 1800 2053 1722 53

  54. Slide 54: Funding Requirement

    Funding Requirement Own Funds Debt (Rs.5,500 Crores) (Rs.18,100 Crores) • Internal accruals: Rs.2800 Crores • Domestic loans through domestic • GDR proceeds: Rs. 1600 Crores financial institutions, banks and • Options being evaluated for the capital markets balance requirement • Foreign loans throug

  55. Slide 55: Tata Power – Financials (Standalone)

    Tata Power – Financials (Standalone) Annual Sales (MU) Profit After Tax (In Billion Rs.) EPS (in Rs.) Net Worth (In Billion Rs.) 55

  56. Slide 56: Tata Power – Financials (Consolidated)

    Tata Power – Financials (Consolidated) Profit After Tax (In Billion Rs.) EPS (in Rs.) Net Worth (In Billion Rs.) 56

  57. Slide 57: Dividend History

    Dividend History 50 50 Dividend (Rs) 45 EPS (Rs) 45 40 Payout Ratio (%) 40 35 35 30 30 Rs 25 25 % 20 20 15 15 10 10 5 5 0 0 FY05 FY06 FY07 FY08 FY09 57

  58. Slide 58: Part H: Sustainability

    Id TATA Part H: Sustainability Lighting up Lives! aye

  59. Slide 59: The climate change problem is a very real threat to the world

    The climate change problem is a very real threat to the world • Continued greenhouse gas emissions at or above current rates would cause further warming by 1.8°C (low scenario), to 4.0°C (high scenario) • Power sector is a significant contributor (24% share of GHG emissions as of 2005 and 38% by 203

  60. Slide 60: Initiatives Under Planning

    Initiatives Under Planning POWER VALUE CHAIN Carbon Fuel Fuel Generation Transmiss Customer Capture & Distribution Energy Cleaning Equipment ion End Storage KEY FEATURES • Fossil fuels – • Clean coal • Conversion • Carbon • Reduce • Reduce • Conservation coal/gas technology efficiency sequestratio l

  61. Slide 61: Our Sustainability Initiatives

    Our Sustainability Initiatives • Trombay SO2 emission of 24TPD (1330MW) - one of the most stringent • Forum of 46 global companies: New policy framework on Combating Climate Change (3C) • Carbon Footprint calculation for the Company completed • Sustainability Council formed - 17 CDM Projects Identif

  62. Slide 62: Thrust on Renewables

    Thrust on Renewables • Wind: Exploring newer technologies and development options • Solar: Developing technical solutions. • Geothermal: Opportunities in Australia and India • Hydro Power: Furthering development in hydro with a European Hydro power producer • Nuclear: Preparing ground work for futur

  63. Slide 63: Various Technologies being Explored

    Various Technologies being Explored • Solar Concentrated Thermal (SCT) • Geo Thermal energy • Coal Bed Methane (CBM) • Coal beneficiation technologies

  64. Slide 64: Demand Side Management and Energy Conservation

    Demand Side Management and Energy Conservation • Tata Power Energy Club formed for curbing energy wastage through school children. The Club has sensitised over 50,000 students across India who have sensitised over 75,000 people in their community • Energy conservation awareness campaigns for Custome

  65. Slide 65: Our initiatives on DSM and Energy Conservation

    Our initiatives on DSM and Energy Conservation

  66. Slide 66: Thank you

    kd TATA Thank you We take pride in Lighting up Lives! Lighting up Lives! TATA POWER :; 3K

The Tata Power Company — Investor Presentation (October 2009) on 6ix