Trident Resources Corp. · TSXV:ROCK

Trident Resources — Investor Presentation (January 2026)

32 slides from Trident Resources's investor presentation, January 2026

  1. Slide 1: Advancing High-Grade Gold And Copper Projects In Saskatchewan, Canada

    Advancing High -Grade Gold And Copper Projects In Saskatchewan, Canada January 2026 Corporate Presentation TSX -V: ROCK : OTCQB: TRDTF

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by Trident Resources Corp. (“ROCK”) using its best efforts to realistically and factually present the information contained. However, subjective opinion, dependence upon factors outside ROCK’s control and outside information sources unavoidably dictate

  3. Slide 3: Why Trident? Gold Strength and Market Timing

    Gold Strength and Why Trident? Market Timing From consolidation to expansion – building the next district -scale gold camp in SK Drilling Completed Tier-1 jurisdiction, SK High-grade foundation *7.03 g/t Au over 43.25m / 30.06 g/t Au Indicated - 0.9M oz (24.7Mt @ 1.13 g/t) Past producer Contact Lake

  4. Slide 4: Investment Highlights

    Investment Highlights Strategic location: ~120,000 ha of gold + copper assets in Saskatchewan, near infrastructure and milling. Regional scale play: Within the historic La Ronge Gold Belt with past production; near intersection of three major lithostructural domains. Mineral Resources: 0.9M oz Au In

  5. Slide 5: Executive Summary

    Executive Summary A newly consolidated explorer with scale, funding, and experienced leadership. Combined portfolio expanded ~30% post-merger, delivering Trident Resources Corp (TSX-V: ROCK | OTCQB: TRDTF) district-scale exposure and multi-asset discovery potential was created through the merger of

  6. Slide 6: Management and Directors

    Management and Directors Jonathan Wiesblatt Jordan Trimble Dr. Andrew Ramcharan Cornell McDowell Chantelle Collins Paul Kremer, M.Sc. Chief Executive Officer President & Director: SVP Corporate Development & IR: VP Exploration & QP: Chief Financial Officer Exploration Manager & Director: CPA (CGA) 2

  7. Slide 7: Management and Directors

    Management and Directors Tim Termuende Ross McElroy Scott Broughton Joseph Gallucci Ron Netolitzky (P.Geo.) Chairman: (P.Geo.) Director: (P.Eng.) Director Head of Investment Banking: Strategic Shareholder/Advisor Discovered Triple R 35+ years in mine Ventum Financial; 15 + Discovered Eskay Creek & S

  8. Slide 8: From consolidation to discovery. A unified portfolio across Saskatchewan.

    Executive Summary From consolidation to discovery. A unified portfolio across Saskatchewan.

  9. Slide 9: Portfolio Projects

    Portfolio Projects Contact Lake Gold Project Past producer (~190 koz @ 6.16 g/t Au); 2025 drill program completed (6,838m). Preview (SW & North), North Lake Deposits (Contact Lake) Road-accessible. Open along strike & depth. Greywacke Lake Gold Project Road-accessible. Open along strike & depth Knif

  10. Slide 10: Building a District-Scale Gold Camp

    Building a District -Scale Gold Camp Dominant land position across Saskatchewan’s prolific La Ronge Gold Belt. Expanding portfolio: Highly prospective ground with new strategic acquisitions underway. High-grade foundation: Multiple advanced gold deposits anchored by Contact Lake, Greywacke North, Pr

  11. Slide 11: Trans-Hudson Orogenic Belt

    Trans -Hudson Orogenic Belt The largest Paleoproterozoic orogenic belt in the world with continental -scale potential The Trans-Hudson Orogeny was the major mountain building event that gave rise to the Trans-Hudson Orogen (THO), the largest Paleoproterozoic Orogenic belt in the world and host to mu

  12. Slide 12: La Ronge Gold Belt - Under-Explored

    La Ronge Gold Belt - Under -Explored Surface exposure, simple geology, and excellent access - reduce exploration cost. Deposits hosted in Proterozoic volcanic and sedimentary rocks with extensive intrusive complexes Outcropping geology allows efficient use of modern geophysics and geochemistry. Prov

  13. Slide 13: La Ronge Gold Belt Active Mines

    La Ronge Gold Belt Active Mines Regional production demonstrates high -grade, scale, and potential. Mine Production Grade Jasper 82, 697 oz 13.7 g/t Star 76,900 oz 13.3 g/t Contact Lake 188,185 oz 6.16 g/t Roy Lloyd 25,748 oz 11.5 g/t Komis & EP 26,859 oz 6.9 g/t Jolu 203,301 oz 13.7 g/t ACTIVE MINE

  14. Slide 14: Our core projects are strategically located assets driving near-term value creation.

    Our core projects are strategically located assets driving near -term value creation.

  15. Slide 15: 2025 Assay Results Contact Lake Project

    2025 Assay Results Contact Lake Project The discovery of high-grade gold in hole CL25003 marks a key advancement for exploration at Contact Lake, confirming mineralization extends below the Bakos shear zone and beyond the historical mining footprint. Hole CL25007 - broad horizon of gold mineralizati

  16. Slide 16: Contact Lake Project

    Contact Lake Project Our Flagship Project. Past Producer with High -Grade Zones. Operated 1995–1998; 190 koz Au @ 6.16 g/t Au (95 % recovery). Internal Cameco report identifies unmined stopes and extensions at depth. Fully funded 2025 drill program completed to expand known zones. Announced positive

  17. Slide 17: Why Contact Lake Gold

    Why Contact Lake Gold A past producer positioned for high -grade resource growth. Operated 1995–1998; 190 koz Au @ 6.16 g/t Au (95 % Internal Cameco report identifies unmined stopes and extensions at depth. Gold values recovery). Closed when gold price ~ US $300/oz. over 850m of strike length on min

  18. Slide 18: Preview Deposits

    Preview Deposits Road -accessible gold deposit with a mineral resource estimate and open -pit potential . Preview SW – Indicated 315k oz. & Inferred 532k oz. Preview North – Indicated 41k oz. & Inferred 7k oz. 3 km mineralized trend within broad structural corridor. Additional targets along strike i

  19. Slide 19: North Lake Deposit and Point Lake Target

    North Lake Deposit and Point Lake Target Two advanced gold zones showing scale and continuity - open along strike and at depth. North Lake Deposit: Indicated 470k oz. & Inferred 481k oz. North Lake Deposit: Recent drilling campaigns (2019–2022) substantially expanded the historical database. Geology

  20. Slide 20: Greywacke Lake Gold Project

    Greywacke Lake Gold Project Road -accessible gold system with open-pit and underground potential. Greywacke : Indicated 71k oz & Inferred 109k oz Access: 30 km NE of Missinipe via HWY 102 and 13 km maintained trail. Work to Date: >160 drill holes (~20,000 m), LiDAR survey completed. Mineralization:

  21. Slide 21: Reindeer Project

    Reindeer Project New Earn -In Exploration Project. Large Land Package: 10 contiguous claims totaling ~26,900 ha in northern Saskatchewan. Strategic Location: Lies along the Tabbernor Fault system—the same structural corridor hosting the Seabee Gold Operation District-Scale Potential: Strategically l

  22. Slide 22: Fully Funded for Discovery. Active exploration programs across priority targets.

    Fully Funded for Discovery. Active exploration programs across priority targets.

  23. Slide 23: 2025 Exploration Program Completed

    2025 Exploration Program - Completed Milestones : Aug. Contact Lake Phase 1 drilling (5,000m / 14–16 holes) Sept. Expansion to 6,500m after initial results Oct. Greywacke & Hailstone geological mapping + sampling Nov. – Dec. 6,838m completed. Initial assay results; Data integration and 2026 program

  24. Slide 24: Excellent Infrastructure

    Excellent Infrastructure Highway, power and access already in place – a low- barrier environment for exploration success. Highway 102 transects Trident’s tenure allowing for easy access and low-cost exploration. Electrical Power Infrastructure parallels the highway and the majority of the La Ronge G

  25. Slide 25: Comparative Valuation

    Comparative Valuation Trident trades at a fraction of peer valuations despite strong asset base and funding. Total Enterprise Value/oz Au $140 $129.66 Peer comparison illustrates significant $120 re-rating potential as exploration results emerge. $100 $80 $73.24 $76.44 ROCK trades at ~C$29/oz vs. pe

  26. Slide 26: Knife Lake Copper Project

    Knife Lake Copper Project Advanced VMS -style copper asset anchoring Trident’s polymetallic portfolio. Deposit type: remobilized VMS postulated (copper + silver + zinc + cobalt + gold) within the Flin Flon–Snow Lake belt. Historical Resource (2019): 3.8 Mt @ 1.02 % Cu Eq Indicated; 7.9 Mt @ 0.67 % C

  27. Slide 27: Mineral Resource Estimate (November 2025)

    Mineral Resource Estimate (November 2025) In Situ Tonnage and Grade Notes to the Resource Estimate Tables: Au Metal Class Deposit Tonnage Au The Mineral Resource Estimates was completed by Sue Bird, P.Eng. who is independent of the Company, with an effective date of November 6, 2025. (tonnes) (gpt)

  28. Slide 28: Knife Lake Deposit Resource Estimate

    Knife Lake Deposit Resource Estimate Indicated Resource (effective date of June 12, 2019)*: Grades Metal Content Cutoff Tonnage CuEq(%) (ktonnes) CuEq (%) Cu (%) Ag (gpt) Co (ppm) Zn (ppm) NSR ($CDN) CuEq Mlbs Cu Mlbs Ag - kOz Au - Oz Conforms to CIM 0.2 4,205 0.96 0.78 3.5 78.5 1634.4 70.85 89 72 4

  29. Slide 29: Gold Strength and Market Timing

    Gold Strength and Market Timing Gold-backed ETFs saw +140 tonnes of inflows YTD, reversing outflows Gold has surged to new highs above from 2023 and signalling renewed investor participation. $4,000/oz in 2025 , supported by record Institutional and retail capital are rotating back into gold, with c

  30. Slide 30: Capital Structure and Ownership

    Capital Structure and Ownership Tight share structure and strong balance sheet support near-term growth. Share Price: C$2.21 Issued & Outstanding: 32.6 M shares. Fully Diluted: 46.5 M (6.2 M Warrants +2.4 M options) Cash & Marketable Securities: ≈ C$ 14.0 M. Market Cap. / Enterprise Value: C$ 72.0 M

  31. Slide 31: End Notes

    End Notes 1 The 2025 MRE was issued to Trident Resources and has an Effective Date of November 6, 2 The Knife Lake Mineral Resource estimate was issued to Rockridge Resources Ltd. by 2025. Qualified Person Sue Bird, P.Eng. with an Effective Date of June 12, 2019. The accompanying report is titled “N

  32. Slide 32: Contact

    CEO AND DIRECTOR Jon Wiesblatt Email: [email protected] SVP CORPORATE DEVELOPMENT AND IR Andrew J. Ramcharan Email: [email protected] OFFICE ADDRESS 1030 – 505 Burrard St., Vancouver, BC, V7X 1M5

Trident Resources — Investor Presentation (January 2026) on 6ix