Newfield Exploration — Q2 2018 Earnings Presentation
29 slides from Newfield Exploration's earnings presentation, Aug 1, 2018
Slide 1: Forward Looking Statements and Related Matters
Forward Looking Statements and Related Matters This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. The words “may,” “forecast,” “outlook,” “could,” “budg
Slide 2: Forward Looking Statements and Related Matters (continued)
Forward Looking Statements and Related Matters (continued) This presentation has been prepared by Newfield and includes market data and other statistical information from sources believed by Newfield to be reliable, including independent industry publications, government publications or other publis
Slide 3: 2Q18 Highlights: Anadarko Basin Drives Outperformance
2Q18 Highlights: Anadarko Basin Drives Outperformance 2Q18 reached new heights for the Company Domestic net production up >30% Y-o-Y: 186,700 BOEPD (39% oil, 62% liquids) Anadarko Basin net production up >45% Y-o-Y: 131,100 BOEPD (32% oil, 61% liquids) Anadarko Basin liquids production up >50% Y-o-Y
Slide 4: Raising 2018 Guidance Based on Strong Anadarko Results
Raising 2018 Guidance Based on Strong Anadarko Results 5 “NEW” “NEW” Domestic Production Guidance (mboepd) Anadarko Basin Production Guidance (mboepd) Raising 2018E domestic and Anadarko Basin production expectations (on BOE basis) based on strong 1H18 results and reiterating total oil volumes 2018E
Slide 5: 1H18 Anadarko Basin Adjustments From Partner Activity
1H18 Anadarko Basin Adjustments From Partner Activity 6 Avg. 1H18: >124,000 BOEPD Gas: 39% / NGL: 28% / Oil: 33% $515 $573 ~ $25 ~ $35 Orig. Guidance Higher Op. WI & Operated Outspend Incremental OBO 1H18 Actual $mm Anadarko Basin CAPEX 69% 8% 23% OBO Production Oil 34% 31% 35% Operated Production G
Slide 6: Unlocking Resource Expansion in NW STACK
Unlocking Resource Expansion in NW STACK SCORE Program NW STACK Assessment Successes STACK Walters 1H-22X Avg. GPI: 9,662’ IP30: 1,274 boepd (68% Oil) CHARLES 1H-19 Avg. GPI: 4,892’ IP30: 931 boepd (49% Oil) Hyden 1H-17x Avg. GPI: 9.755’ IP30: 1,555 boepd (40% Oil) GOSS 1H-8X Avg. GPI: 9,772’ IP30:
Slide 7: Newfield Has Led Development of Water Solutions in STACK
Newfield Has Led Development of Water Solutions in STACK 8 Since 2015, NFX has invested >$80 MM on permanent water pipelines and infrastructure ~75 miles of permanent “dual” pipe (effectively ~150 miles) 30,000 Bbl/d Barton water recycling and treatment facility >13 million barrels of water storage
Slide 8: Improving Debt Profile
Net debt / adj EBITDA4 Long-Term Debt Maturities $ millions No maturities until 1/30/2022 Leverage Profile Improvement Ahead of Schedule FCF generation in 2Q18 has placed Net debt / adj. EBITDA at 1.7x (Ahead of FY18 guidance) Expanding liquidity to over $2.4 billion $2.0 billion undrawn unsecured c
Slide 9: Leverage Profile Improvement Ahead of Schedule
Leverage Profile Improvement Ahead of Schedule = FCF generation in 2Q18 has placed Net debt / adj. EBITDA at 1.7x (Ahead of FY18 guidance) = Expanding liquidity to over $2.4 billion = $2.0 billion undrawn unsecured credit facility — $293 million cash = $125 million undrawn line of credit Net debt /
Slide 10: 2Q18 Domestic Results
2Q18 Domestic Results 1Q18 ACTUAL 2Q18 GUIDANCE 2Q18 ACTUAL PRODUCTION Oil (mbopd) 72 72 74 NGL (mbopd) 35 37 43 Gas (mmcfpd) 401 402 422 Total (mboepd) 174 172-180 187 EXPENSES ($/BOE)* LOE $3.43 $3.43 $3.13 Transportation** $5.01 $4.95 $4.85 Production & other taxes $1.53 4.7% $1.52 General & admi
Slide 11: 2Q18 Basin Results
2Q18 Basin Results ANADARKO WILLISTON UINTA ARKOMA PRODUCTION Oil (mbopd) 42.1 14.3 17.6 0.0 NGL (mbopd) 38.3 3.4 0.6 0.4 Gas (mmcfpd) 304.4 19.9 14.7 81.0 Total (mboepd) 131.1 21.0 20.7 13.9 EXPENSES ($/BOE) LOE $2.29 $5.59 $9.87 $3.24 Transportation* $4.37 $5.66 $1.13 $4.44 Production & other taxe
Slide 12: 2018 Annual Guidance
2018 Annual Guidance DOMESTIC GUIDANCE 2017 ACTUAL 2018 ESTIMATES* PRODUCTION Oil (mbopd) 61.2 74 NGL (mbopd) 31.7 41 Gas (mmcfpd) 356.5 425 Total (mboepd) 152.2 180 - 190 EXPENSES ($/BOE) LOE $3.47 $3.47 Transportation** $5.40 $4.93 Production & other taxes 3.5% 4.6% General & administrative, net $
Slide 13: 2018 Quarterly Guidance
2018 Quarterly Guidance DOMESTIC GUIDANCE 1Q18 Actual 2Q18 Guidance 2Q18 Actual 3Q18E* 4Q18E* PRODUCTION Oil (mbopd) 72 72 74 73 – 77 73 – 77 NGL (mbopd) 35 37 43 40 – 46 40 – 46 Gas (mmcfpd) 401 402 422 420 – 450 420 – 450 Total (mboepd) 174 172-180 187 185 – 195 185 – 195 CAPEX ($MM) $345 $360 $36
Slide 14: Quarterly Guidance
018 Quarterly Guidance 1Q18 2018 2Q18 DOMESTIC GUIDANCE far errr Actual 3Q18E* 4Q18E PRODUCTION Oil (mbopd) nR nR 74 73-77 73-77 NGL (mbopd) 35 37 43 40-46 40-46 Gas (mmefpd) 401 402 422 420-450 420-450 Total (mboepd) 174 172-180 187 185-195 185-195 APEX (SMM) $345 $360 $365 $365 $275 1Q18 2Q18 2018
Slide 15: STACK 3YR Plan Modeling Assumptions
STACK 3YR Plan Assumptions: EUR Range: 1.1 – 1.7 MMBOE1 Well Cost Range (incl. facilities): $7.6 – $8.7 million 3YR Plan Average: 1.3 MMBOE1 EUR @ $7.9 million well cost (incl. facilities) STACK 3YR Plan Modeling Assumptions MODELING ASSUMPTIONS STACK PRODUCTION Avg. IP30 (BOEPD) 1,300 Avg. IP30 (%
Slide 16: SCOOP 3YR Plan Modeling Assumptions
MODELING ASSUMPTIONS SCOOP Oil SCOOP Wet Gas PRODUCTION Avg. IP30 (BOEPD) 1,035 1,750 Avg. IP30 (mbo oil / mboe liquids) 695 / 870 420 / 1,100 Avg. EUR (mboe) 1,695 2,700 Avg. EUR (oil mbo / liquids mboe) 610 / 1,170 270 / 1,500 First Five Year Cum (mboe) 722 1,357 First Five Year Cum (mbo) 298 179
Slide 17: Williston Basin 3YR Plan Modeling Assumptions
MODELING ASSUMPTIONS Williston PRODUCTION Avg. IP30 (BOEPD) 2,121 Avg. IP30 (% oil / % liquids) 65% / 83% Avg. EUR (mboe) ~1,050 Avg. EUR (oil mbo / liquids mboe) 686 / 884 First Five Year Cum (mboe) 642 First Five Year Cum (mbo) 416 EXPENSES ($/BOE) LOE $4.70 Oil transportation $1.90 Gas/NGL transp
Slide 18: Oil Hedging Details as of 07/16/18
Oil Hedging Details as of 07/16/18 Denotes update 19 Weighted-Average Price Period Volume (bbl/d) Swaps Swaps w/ Short Puts5 Collars Collars w/ Short Puts6 3Q 2018 60,000 3,500 -- -- $56.58 -- -- -- -- $44.00/$56.78 -- -- -- -- -- -- -- -- -- -- 4Q 2018 28,000 3,500 -- 21,000 $55.81 -- -- -- -- $44.
Slide 19: Oil Hedging Details as of 07/16/18
Oil Hedging Details as of 07/16/18 Weighted-Average Price Period Volume (bbl/d) Swaps Swaps w/ Short Puts Collars Collars w/ Short Puts8 1Q 2019 -- -- -- 36,500 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- $40.47/$50.53-$57.02 2Q 2019 -- -- -- 33,500 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- $40.
Slide 20: Oil Hedging Details as of 07/16/18
Oil Hedging Details as of 07/16/18 The following table details the expected impact to pre-tax income (in millions, except prices) from the settlement of our derivative contracts, outlined on the previous slide, at various NYMEX oil prices. 21 Oil Prices Period $20 $30 $40 $50 $60 $70 $80 3Q 2018 $20
Slide 21: Gas Hedging Details as of 07/16/18
Gas Hedging Details as of 07/16/18 22 Weighted-Average Price Period Volume (mmbtu/d) Swaps Swaps w/ Short Puts8 Collars Collars w/ Short Puts9 3Q 2018 180,000 40,000 10,000 30,000 $2.97 -- -- -- -- $2.60/$2.97 -- -- -- -- $2.90-$3.15 -- -- -- -- $2.30/$2.87-$3.32 4Q 2018 150,000 66,500 39,900 10,100
Slide 22: Gas Hedging Details as of 07/16/18
Gas Hedging Details as of 07/16/18 Weighted-Average Price Period Volume (mmbtu/d) Swaps Collars 1Q 2019 10,000 100,000 $2.91 -- -- $3.00-$3.47 2Q 2019 10,000 -- $2.91 -- -- -- 3Q 2019 10,000 -- $2.91 -- -- -- 4Q 2019 10,000 -- $2.91 -- -- -- 23
Slide 23: Gas Hedging Details as of 07/16/18
Gas Hedging Details as of 07/16/18 The following table details the expected impact to pre-tax income (in millions, except prices) from the settlement of our derivative contracts, outlined on the previous slide, at various NYMEX gas prices. 24 Gas Prices Period $2.00 $2.50 $3.00 $3.50 $4.00 $4.50 $5.
Slide 24: Propane Hedging Details as of 07/16/18
Propane Hedging Details as of 07/16/18 25 Weighted-Average Price Period Volume (bbl/d) Swaps ($/gal) 3Q 2018 5,000 $.830 4Q 2018 3,000 $.807 Denotes update
Slide 25: Propane Hedging Details as of 07/16/18
Propane Hedging Details as of 07/16/18 The following table details the expected impact to pre-tax income (in millions, except prices) from the settlement of our derivative contracts, outlined on the previous slide, at various Mont Belvieu non-tet prices. 26 Propane Prices Period $.50 $.60 $.70 $.80
Slide 26: Non-GAAP reconciliation of Adjusted EBITDA
Non-GAAP reconciliation of Adjusted EBITDA 27 ($ in millions) QTD Twelve Months Ended 3Q17 4Q17 1Q18 2Q18 June 30, 2018 Net Income $87 $95 $86 $119 $387 Adjustments to derive EBITDA: Interest expense, net of capitalized interest 22 23 23 22 90 Income tax provision (benefit) (19) (38) 13 14 (30) Depr
Slide 27: Endnotes
Endnotes 3YR Plan type curve indicative of anticipated results of wells to be drilled in play during the 3YR Plan and is representative of estimated ultimate recovery from the well and are not indicative of cumulative historical results in play. Estimated ultimate recovery (EUR) refers to potential
Slide 28: Key Definitions
Key Definitions 3YR Plan Assumptions – Estimated production, costs, expenses (inclusive of CAPEX) shown are expected to be within +/- 5% of the values illustrated. Commodity prices based on NYMEX STRIP pricing as of June 30, 2018. Adjusted EBITDA / Net Debt – See reconciliation beginning on page 27.
Slide 29: Key Definitions
Key Defin' S 3YR Plan Assumptions — Estimated production, costs, expenses (inclusive of CAPEX) shown are expected to be within +/- 5% of the values illustrated. Commodity prices based on NYMEX STRIP pricing as of June 30, 2018. Adjusted EBITDA / Net Debt —See reconciliation beginning on page 27. Dis