Meridian Mining PLC · TSX:MNO

Meridian Mining — Meridian Mining UK S — Investor Presentation (September 2023)

33 slides from Meridian Mining's investor presentation, September 2023

  1. Slide 1: Cabaçal: Brazil's leading Gold-Copper VMS development project

    Cabaçal: Brazil’s leading Gold-Copper VMS development project with upside from over 50KM belt scale exploration potential Corporate Presentation, September 2023 TSX: MNO / OTCQX: MRRDF / Frankfurt: 2MM meridianmining.co

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS This presentation does not constitute or form a part of, and should not be construed as an offer, solicitation or invitation to subscribe for, underwrite or otherwise acquire, any securities of Meridian Mining UK Societas (“Meridian”), nor shall i

  3. Slide 3: Meridian's Portfolio of Copper/Gold Assets

    M E R I DI A N ’ S P O R T FO L I O O F C O PPE R / G OL D A SSE T S CABAÇAL Preliminary Economic Assessment: • NPV5 USD 573 M & IRR 58.4% • Capex – USD 180 M • Payback – 10.6 months • Base Case After Tax – Au $1,650/oz, Cu $3.59/lbs PEA superior economics, driven by: • High-grade starter pit & low

  4. Slide 4: Systematically Unlocking Km Belt Scale Potential

    S YSTEMATICALLY U NLOCKING 50 KM B ELT S CALE P OTENTIAL Cigarra Santa Rita Cabaçal Mine 1.9 km with ~2 Moz AuEq Au-Cu-Ag Chiquito ~2 km strike Au-Ag Sucuri ~2 km strike Au-Ag Alamo ~4 km strike Cu-Au-Ag 1 See Meridian NI-43-101 2nd June 2022 Santa Helena Mine 1.3 km strike Zn-Cu-Au-Ag-Pb Corporate

  5. Slide 5: Cabaçal Mine PEA Highlights

    C ABAÇAL M INE PEA H IGHLIGHTS PEA demonstrates an Post exceptional Tax NPV & IRRpotential open-pit Sensitivity to Metal Prices mining operation Copper Price Downside Base Spot Upside 3.50 3.59 4.00 4.13 4.50 5.00 NPV IRR NPV IRR NPV IRR NPV IRR NPV IRR NPV IRR 1,550 $510 m 53.5% $523 m 54.2% $582 m

  6. Slide 6: Cabaçal vs Recent Gold Project Economic Studies

    C ABAÇAL VS R ECENT G OLD P ROJECT E CONOMIC S TUDIES 1,2 ˅ After-Tax Unlevered IRR (%) ˅ After-Tax NPV5 / Initial Capex (USDm) ˅ Payback Period (Years) 2 Source CIBC Data, Market Data / Company Data – 10th May 2023 1 See News Release 6th March 2023 Notes: Corporate Presentation, September 2023 TSX:

  7. Slide 7: Resource Block Model

    R ESOURCE - B LOCK M ODEL ˅ Resource Model (0.3 g/t Cut Off) ˅ Resource Model (0.5 g/t Cut Off) ˅ Resource Model (0.8 g/t Cut Off) 500 m Note: 1 See News Release dated 26th September 2022 ˅ Resource Model (1.0 g/t Cut Off) Cabaçal Mineral Resource AuEq Au Ag AuEq Category Mt Au g/t Cu % Ag g/t Cu Kt

  8. Slide 8: Further Expanding and Infilling Cabaçal Resource

    F URTHER E XPANDING AND I NFILLING C ABAÇAL R ESOURCE A ~1,900 m Resource Strike B A High Grade Cabaçal Starter Zone Main Zone B A A’ B B’ 100 m 100 m Note: 1 See News Release Meridian Mining UK S | 8 Corporate Presentation, September 2023 TSX: MNO / OTCQX: MRRDF / Frankfurt: 2MM Meridian Mining UK

  9. Slide 9: Cabaçal Mine Higher-Grade Zones Drive Economics

    C ABAÇAL M INE H IGHER -G RADE Z ONES D RIVE E CONOMICS Note: 1st Year Mining in the Starter 1 See Meridian News Release Pits delivering: • Higher grade mill feed • Year 1 production +200 koz • Free cashflow – USD 204M • Exceptionally low strip ratio Cabaçal near mine upside potential: • 3 rigs dril

  10. Slide 10: Process Flowsheet

    P ROCESS F LOWSHEET Simple process flowsheet with high recoveries Copper Pyrite Crush Grind Gravity Flotation Flotation Jaw Course Knelson Scavenger Sulphur Crusher ~200 microns Concentrator Re-grind Removal Au Cu/Au/Ag Tailings Dore Conc. ~28.4% ~30% Gold Non-Acid Clean Copper via Gravity Generatin

  11. Slide 11: Cabaçal Mine Layout

    C ABAÇAL M INE L AYOUT Open Pit ~2,000m x 500m Optimized mine site design to minimize transport distances Plant site design flexible for expansion opportunities Potential to minimize cost by using depleted open pit for waste storage 1 See News Release 6th March 2023 Notes: Corporate Presentation, Au

  12. Slide 12: Leading with Sustainable Power Sources

    L EADING WITH SUSTAINABLE POWER SOURCES PEA assumes USD 0.075 / kWh power cost with significant potential for optimization Regional Hydroelectric Generation ~375 MW in 10 Facilities On-going run-of-river and solar power Notes: 1 See News Release 6th March 2023 Notes: 2 www.frontiersin.org/articles/1

  13. Slide 13: Near-Term Potential Upside and Optimization

    N EAR - TERM POTENTIAL UPSIDE AND OPTIMIZATION Key areas for near-term upside opportunities and optimization PEA & Resource Update Incorporate Santa Helena Application - Preliminary License Potential for high-grade feed Evaluating potential increase Mine corridor exploration upside Throughput rate ~

  14. Slide 14: Santa Helena First Results and 1.1 km Extension

    S ANTA H ELENA F IRST R ESULTS AND 1.1 KM E XTENSION Initial Santa Helena drill program commenced High-grade Cu-Au-Ag-Zn massive sulphide intercepted Multiple new EM plates extending out from Santa Helena Mine Untested targets for further Cu‐Zn‐Au‐Ag zones 1.1km open exploration target extending to

  15. Slide 15: Corporate Information - Meridian Mining UK S

    C OR P OR A T E I NFOR M A T I ON - M E R I DI A N M I NI NG U K S Corporate Structure1 Meridian Mining UK S Shares Outstanding 242.6 m Compensation Warrants 2.2 m (CAD 0.35-0.50) Options 15.1 m (CAD 0.07-1.10) Fully Diluted 259.9 m Share Price CAD 0.385 (12 Sept 2023) Market Capitalization CAD 93.4

  16. Slide 16: Milestones and Catalysts Post PEA

    M I L E ST ONE S A ND C A T A L YST S P O ST P E A 2022 2023 2024 Initial NI 43-101 PEA Application for resource (Released) Preliminary License Defines ~2m oz AuEq Cabaçal infill drilling Completion of in pit for higher grades Feasibility Study Confirms high-grade Testing near mine Santa Helena star

  17. Slide 17: Investment Summary

    I NV E S T M E NT S UM M A R Y Developing the Cabaçal Au-Cu mine & exploring the belt 1 See News Release 6th March 2023 Notes: Base Case PEA Low Initial Capital Cost After Tax NPV5 USD 573 M & IRR 58.4% USD 180 M Low All-in-Sustaining-Costs (AISC) Industry leading Payback USD 671 / oz (Year 1-5) 10.

  18. Slide 18: Appendix

    APPENDIX Corporate Presentation, September 2023 TSX: MNO / OTCQX: MRRDF / Frankfurt: 2MM Meridian Mining UK S | 18

  19. Slide 19: Meridian Leadership

    M E R I DI A N L E A DE R S HI P Our Management GILBERT CLARK ADRIAN MCARTHUR M A R TI N M C F AR LAN E SORAIA MORAIS CEO & Director President & Director SVP – Strategy and Projects Chief Financial Officer +25 years experience +25 years experience +30 years experience +15 years experience J A M E S

  20. Slide 20: Meridian Advisory Board

    M E R I DI A N A DV I SO R Y B O A R D Cabaçal History BP Minerals Rio Tinto Discovery Development Production Acquisition 1980-1984 1984-1986 1986-1991 1989-2005 AFONSO ROCKY G I L S ON J OH N FIGUEIREDO OSBORNE TE I X E I R A WAG H OR N Geologist Geologist Geologist Geologist + 50 years + 40 years

  21. Slide 21: ESG Clean Industrial Renewable Energy

    ESG CLEAN I NDUSTRIAL R ENEWABLE ENERGY Regional Hydroelectric 2 www.frontiersin.org/articles/10.3389/fenvs.2020.579031/full Generation1,2 Source: 1 www.quebecengenharia.com.br/complexo-juruena Jaurú Cascade 235.9 MW (6 Facilities) Juba Cascade 139.4 MW (4 Facilities) Governing ESG Philosophies a LO

  22. Slide 22: Structured Purchase Agreement to Acquire a 100% Beneficial Interest

    S T R UCT UR E D P UR CHA S E A GR E E M E NT T O A CQUI R E A 1 0 0 % B E NE FI CI A L I NT E R E S T 1 Protects Meridian Shareholders Equity and provides Vendors an Interest Going Forward Payment Schedule Vendor Payment Vendor Payment Payments Requirements Comments Status (Months) (USD) (Shares) M

  23. Slide 23: Production Metrics

    P R ODUCT I O N M E T R I CS Item Plant Feed Mined Mt 55.6 Waste Mined Mt 118.1 Total Mined Mt 173.7 Mill Throughput Mt/annum 2.5 Total gold production ounces 1,021,320 Total copper production tonnes 159,926 Total silver production ounces 1,758,923 Item Milled tonnes Mt 55.6 Mill throughput Mt/ annu

  24. Slide 24: Capital & Operating Cost Breakdown

    C A PI T A L & O PE R A T I NG C O ST B R E A K DOWN Cabaçal Initial Capital Costs Cabaçal Sustaining Capital Costs Item US$mm Item US$mm Equipment & Packages 39.93 Process 30.53 Materials 9.67 Tailings 47.73 Construction And Erection 36.51 Indirect Costs 7.83 Others 32.14 Owner Costs 3.91 Indirects

  25. Slide 25: Project Economics

    P R O J E CT E CONOM I CS Item Base Case Spot Case Life of mine Years 22.3 22.3 NPV(5%) USD million 572.5 745.2 IRR % 58.4% 69.7% Payback Days 321 279 Initial Capital Expenditure USD million 180 180 Sustaining Capital Expenditure USD million 108 108 Item Average Year 1-5 Total LOM Average Year 1-5 T

  26. Slide 26: Top Tier Metallurgical Recoveries

    T OP T I E R M E T A L L UR GI CA L R E COV E R I E S +94% Copper Recoveries Copper Recovery Copper recovery exceeds 90% from 0.1% to >3% Cu head grade While copper recovery declines with head grade the slope is very moderate Consideration will therefore be given to the viability of processing lower

  27. Slide 27: Cabaçal Concentrate Test Work

    C A B A ÇA L C ONCE NT R A T E T E ST WO R K 25-29% Copper Concentrate High-grade Copper Concentrate Copper concentrate grade correlates well to Sulphur : Copper feed grade ratio Concentrate grades varied up to 30% Cu with average mineralization expected to yield 25 – 29% Cu concentrate grade Copper

  28. Slide 28: Expanding the Copper Potential from Archives

    E XPANDING THE COPPER POTENTIAL FROM A RCHIVES Alvorada uncovered as Cabaçal’s most Cabaçal Mine significant copper in stream anomaly Peak Cu: 56 ppm Cabaçal Resource: Indicated: 52.9Mt @ 0.6g/t Au, 0.3% Cu and 1.4g/t Ag Inferred: 10.3Mt @ 0.7g/t Au, 0.2% Cu & 1.1g/t Ag Santa Helena Mine Peak Cu: 36

  29. Slide 29: Regional Exploration Targets

    R EGIONAL E XPLORATION TARGETS 1 928 km2 tenements Regional Exploration by BP Minerals Historical Cu-Au-Zn Hydroelectric Dam geochemical anomalies Potential extensions Local Electric Substation of VMS belt stratigraphy Jaurú & Araputanga Greenstone belts potential to repeat discovery success at Caba

  30. Slide 30: Cabaçal Potential: Upside to Global VMS Deposits

    CA B AÇA L P o t e n t ia l Up s id e o f Ca b a ç a l t o Glo b a l VMS d e p o s it s Cabaçal VMS Project Analogues Cabaçal is a camp scale VMS project underexplored and under-developed compared to analogue camps Cabaçal has already one giant VMS deposit defined Cabaçal (+53Mt)4 VMS deposits tend

  31. Slide 31: Cabaçal Evolution of VMS Camps over Time

    CA B AÇA L Evolution of VMS Camps over time1 Flin Flon Greenstone Belt Mine Life The Technical Evolution & Discovery Methods First discovery identified through prospecting (David Collins - Tom Method Used Creighton, 1914) Geophysical • Early mapping and geochemistry may Geological identify hydrother

  32. Slide 32: Espigão IOCG Target

    E SPIGÃO IOCG T ARGET Espigão Project Iron Oxide-Copper-Gold (“IOCG”) type deposits host the giant Cu-Au mines of Brazil and some of the biggest Cu-Au mines internationally e.g. Salobo and Olympic Dam Espigão hosts the prospective geochemistry comparable to large-scale IOCG type deposits First gravi

  33. Slide 33: Contact: Gilbert Clark, Meridian Mining UK S

    Meridian Mining UK S Gilbert Clark Phone: +1 778 715 6410 Corporate Address: Chief Executive Officer Email: [email protected] 8th Floor 4 More London, Riverside, London, United Kingdom, SE1 2AU Corporate Presentation, September 2023 TSX: MNO / OTCQX: MRRDF / Frankfurt: 2MM meridianmining.co

Meridian Mining UK S — Investor Presentation (September 2023) on 6ix