Pc Gold Ltd. · ASX:PC2

Pc Gold — Investor Presentation (July 2026)

20 slides from Pc Gold's investor presentation, July 2026

  1. Slide 1: PC Gold Ltd – Interim MRE Update Delivers Quantum Scale Increase

    PC GOLD LTD INTERIM MRE UPDATE DELIVERS QUANTUM SCALE INCREASE JULY 2026 PC Gold Limited ACN 609 609 047 ASX:PC2 FSE: D6A PC GOLD INVESTOR PRESENTATION ASX: PC2 1

  2. Slide 2: Investment Highlights

    INVESTMENT HIGHLIGHTS 100% Owned Spring Hill Gold Project – Tier 1 Jurisdiction Granted ML, No Native Title, Large Goldfield in the Northern Territory. 84% increase to MRE, Global Resource of 1.51 Moz Au at 1.1 g/t Au 1Moz Au Indicated at 1.1 g/t Au (Up 136%) – growth driven by Photon Assay grade up

  3. Slide 3: Capital Structure and Shareholders

    CAPITAL STRUCTURE SHAREHOLDERS Share Price (24-Jul-26) Cash3 34.8% 22.8% Institutional $0.90 $22M Rivi Opportunity Fund 2 Management 2 Other – ~900 shareholders 23.8% 18.6% Shares on Issue Market Cap 314M 1,2 ~$283M SHARE PRICE PERFORMANCE Price ($) Volume (m) $1.60 10.0 BROKER COVERAGE $1.40 9.0 8.

  4. Slide 4: Board & Management

    BOARD & MANAGEMENT Ash Pattison Rob Jewson Kevin Puil John Menzies John Lewis EXECUTIVE CHAIR / CEO NON-EXEC DIRECTOR NON-EXEC DIRECTOR NON-EXEC DIRECTOR NON-EXEC DIRECTOR / COMPANY SECRETARY Peter Harris Wei Li Emer McGowan Geoffrey Eupene Sean Church CHIEF OPERATING GM - GEOLOGY CHIEF FINANCIAL OF

  5. Slide 5: Spring Hill Gold Project

    SPRING HILL GOLD PROJECT SPRING HILL WITHIN PINE CREEK GOLDFIELD • World-class +20 Moz Pine Creek goldfield, NT – a premier Australian gold province. • Idle 2.4 Mtpa Union Reef CIL plant just 26 km by road; three new CIL plants permitted nearby in 18 months. • Established infrastructure – close to D

  6. Slide 6: A Resource Built to Grow

    A RESOURCE BUILT TO GROW INTERIM MRE (25 APRIL 2026 CUT-OFF) – OPEN IN EVERY DIRECTION, WITH ~40,000M OF DRILLING ALREADY UNDERWAY 1.51 Moz 1.0 Moz ~40,000m INTERIM MRE INDICATED – UP 135% DRILLING UNDERWAY at 1.1 g/t Au Confidence to drive the PFS Post 25 April assay cut-off Not closed off in any d

  7. Slide 7: Spring Hill Gold Project – Achievements Since Oct '25 IPO

    SPRING HILL GOLD PROJECT ACHIEVEMENTS SINCE OCT ‘25 IPO • 25,900m drilled and assayed safely to 25 April 2026 o Interim MRE up 84%, Indicated Resource up 136% • Discovery of Macau Link Zone and identification of potential repeat Link zones. • Photon Assay technology adopted and validated for Spring

  8. Slide 8: Spring Hill Gold Project – Scale and Grade Potential

    SPRING HILL GOLD PROJECT SCALE AND GRADE POTENTIAL STILL EVOLVING – FOCUS FOR REMAINDER 2026 • High-grade bulk tonnage sheeted vein system – typical of major Pine Creek deposits. • Three key zones defined across a +3 km corridor north of the MRE. • Bulk-tonnage open pit / underground (<15% of the kn

  9. Slide 9: 2026 Interim MRE Headline Numbers

    2026 INTERIM MRE HEADLINE NUMBERS UPDATED MINERAL RESOURCE UP 84% TO 1.51 MOZ AU VS JUNE 2024 JUNE 2024 UPDATED 2026 MRE Category Mt g/t Oz Au Mt g/t Oz Au Indicated 13.0 1.0 424,000 28.8 1.1 1,003,000 Inferred 12.6 1.0 397,000 14.7 1.1 510,000 TOTAL 25.6 1.0 821,000 43.5 1.1 1,513,000 +579 Kozs (13

  10. Slide 10: Updated Long Section of the Resource

    SPRING HILL GOLD PROJECT UPDATED LONG SECTION OF THE RESOURCE AT 1.51Moz – 1.2KM STRIKE LENGTH 1.2KM OPEN PC GOLD INVESTOR PRESENTATION ASX: PC2 10

  11. Slide 11: 2026 MRE Methodology

    2026 MRE METHODOLOGY PC GOLD’S LIK GRADE ESTIMATION FLOWS DIRECTLY INTO ORE RESERVE Localised Indicator Kriging (LIK) used for bulk tonnage assessment other than Link Zone domain. What is LIK? Why It Aligns With Reserve Block Models LIK estimates grade block-by-block, at the Matching block support s

  12. Slide 12: Mineral Resource by Zone

    MINERAL RESOURCE BY ZONE TOTAL RESOURCE UP 84% TO 1.51 MOZ AU, LED BY HK/MACAU, MAIN GROWTH AND THE NEW LINK ZONE JUNE 2026 MRE JUNE 2024 MRE Zone Tonnes g/t Oz Au Tonnes g/t Oz Au INDICATED Hong Kong / Macau 18,852,298 0.9 563,000 10,911,980 1.0 342,200 Macau Link 689,873 5.2 114,500 – – – Main 8,3

  13. Slide 13: 2026 MRE Cut-Off Grade Assessment

    2026 MRE CUT-OFF GRADE ASSESSMENT VERY ROBUST MRE ACROSS ALL CUT-OFF GRADES PC GOLD INVESTOR PRESENTATION ASX: PC2 13

  14. Slide 14: Strike of 1.2km – Grade Intensity Improves at Depth

    STRIKE OF 1.2KM - GRADE INTENSITY IMPROVES AT DEPTH AVERAGE OUNCES PER VERTICAL METRE RISE SHARPLY ON HITTING LINK ZONE AND STAY HIGH ABOVE 365M “Average OVM ~2,600” PC GOLD INVESTOR PRESENTATION ASX: PC2 14

  15. Slide 15: Resource Excludes These Results

    RESOURCE EXCLUDES THESE RESULTS CONTINUATION OF RECENT DRILLING SUCCESS POST MRE CUT-OFF MACAU LINK ZONE DISCOVERY HONG KONG • 9.5m @ 3.04 g/t Au from 189.6m & 6.0m @ 5.16 g/t Au from • 113m @ 1.14 g/t Au from surface, including 18m @ 4.62 g/t Au 209.6m (SDH26-007) from surface (SDH26-005). Samples

  16. Slide 16: High-Grade Underground Potential

    HIGH-GRADE UNDERGROUND POTENTIAL LINK ZONE DISCOVERIES & RE-OPENING OF THE HISTORICAL ADIT TARGETING HIGH-GRADE UG OPPORTUNITY LINK ZONE DISCOVERIES • Historical drilling intersecting the pelite layers within the modelled stratigraphy are reporting much higher gold grades than those holes intersecti

  17. Slide 17: 2026 Work Program Ahead

    SPRING HILL GOLD PROJECT 2026 WORK PROGRAM AHEAD DRILLING – 40,000m in 2026 not in MRE FEASIBILITY STUDY WORK Four rigs currently operating (three Diamond, one RC), driving rapid resource PFS work ongoing - Due in late 2H, 2026 growth and resource conversion. More ounces to be added. Phase 3 Resourc

  18. Slide 18: More Information

    MORE INFORMATION Ashley Pattison Investor Relations Executive Chair & CEO Paul Berson T: +61 8 6313 3996 T: +61 (0) 421 647 445 E: [email protected] E: [email protected] U38/460 Stirling Highway Peppermint Grove WA 6011 Australia pcgold.com.au PC GOLD INVESTOR PRESENTATION ASX: PC2 18

  19. Slide 19: Disclaimer & Competent Persons Statement

    19 DISCLAIMER & COMPETENT PERSONS STATEMENT IMPORTANT NOTICE AND DISCLAIMER The following important notice and disclaimer applies to this investor presentation and you are therefore General advised to read this carefully before making any use of this presentation or any information contained in this

  20. Slide 20: Disclaimer & Competent Persons Statement (cont.)

    DISCLAIMER & COMPETENT PERSONS STATEMENT (cont.) COMPETENT PERSONS STATEMENT – RESOURCES COMPETENT PERSONS STATEMENT – EXPLORATION TARGET The information in this presentation that relates to the estimation and reporting of Mineral The information in this Presentations that relates to Exploration Tar

PC Gold — Investor Presentation (July 2026) on 6ix