Tellurian — Investor Presentation (July 2019)
30 slides from Tellurian's investor presentation, Jul 10, 2019
Slide 1: Cautionary statements
Cautionary statements Forward-looking statements Plans for the Permian Global Access Pipeline, Haynesville Global Access Pipeline and Delhi Connector Pipeline projects discussed herein are in the early stages of development and numerous aspects of the projects, such as detailed engineering and permi
Slide 2: Cautionary statements
Cautionary statements Forward-looking statements The information in this presentation includes “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements other than state
Slide 3: Recent milestones and key corporate updates
Recent milestones and key corporate updates Converted HOA with Total into finalized definitive agreements for 2.5 mtpa of LNG Total to purchase 1 mtpa of LNG for $500 million equity investment in Driftwood Entered into SPA for additional 1.5 mtpa of LNG from Tellurian Marketing’s LNG volumes from Dr
Slide 4: Recent milestones and key corporate updates
Recent milestones and key corporate updates Jf Converted HOA with Total into finalized definitive agreements for 2.5 mtpa of LNG Total to purchase | mtpa of LNG for $500 million equity investment in Driftwood Entered into SPA for additional 1.5 mtpa of LNG from Tellurian'’s LNG offtake volumes from
Slide 5: Key investment highlights
Key investment highlights Management track record at Cheniere and BG Group Guaranteed lump sum turnkey Integrated – Upstream reserves – Pipeline network – LNG terminal Low-cost Flexible contract Bechtel with 46% of Tellurian owned by founders, management and other employees(1) (1) As of April 17, 20
Slide 6: Global LNG capacity call: ~100-250 mtpa
Global LNG capacity call: ~100-250 mtpa mtpa Global LNG capacity outlook Capacity required(1) 800 ~250 mtpa 700 600 ~100 mtpa 500 400 300 200 100 0 2015 Sources: Wood Mackenzie, Tellurian Research. Notes: (1) Assumes 85% utilization rate. 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 (2) Assumin
Slide 7: Permian gas to drive U.S. LNG export
Permian gas to drive U.S. LNG export Permian oil drilling activity expected to double Permian gas production from 2018 to 2025 growth Permian oil mmboe/d 12 and gas production forecast ~19 bcf/d 2025E Permian dry gas production Dry gas 8 4 Crude oil - 2013 2025E Source: EIA, BP Energy Outlook and Bl
Slide 8: U.S. LNG exports vital to global oil supply
U.S. LNG exports vital to global oil supply Permian oil production Source of supply for 2017-2025E oil growth 8 mmbo/d RoW 15% Permian 85% 2017 2025E Source: EIA, BP Energy Outlook and Bloomberg. 9 2017-2025E global oil growth = 6 mmbo/d 3 mmbo/d
Slide 9: U.S. must export ~30 bcf/d of LNG
U.S. must export ~30 bcf/d of LNG …including an additional ~20 bcf/d of LNG export capacity over firm capacity by 2025 U.S. natural gas export requirements 29 bcf/d ~20 bcf/d additional U.S. LNG export capacity required(1) $150billion investment required for >150 mtpa of additional LNG capacity(2) c
Slide 10: Henry Hub will be at a premium without pipeline
Henry Hub will be at a premium without pipeline Henry Hub is forecasted to be the highest priced source of gas in the Gulf Coast infrastructure 2023 forecasted discount to Henry Hub Southwest Louisiana firm demand 19 bcf/d 2017 2025E Source: RBN, IHS and Tellurian analysis. 11 6 bcf/d LNG Power Indu
Slide 11: Owning infrastructure mitigates risk
Owning infrastructure mitigates risk SPA model Equity model Customer incurs risk Developer incurs risk Own the infrastructure Developer consolidates pipeline transport, but still a price taker for transportation services; developer only has 5% of Henry Hub price to pay for transport True cost contro
Slide 12: Best team in the business
Best team in the business 79 50 mtpa, our team is responsible for over 15% of the LNG in production today Our team has delivered cost-leading LNG projects for over 50 years 13 Our combination of talents sets us apart from every other developer. Our leadership is underpinned by a team with unmatched
Slide 13: Driftwood LNG's ideal site for exports
Driftwood LNG’s ideal site for exports Access to pipeline infrastructure Access to power and water Support from local communities Site size over 1,000 acres Insulation from surge, wind, and local populations Berth over 45’ depth with access to high seas Artist rendition 14
Slide 14: Bringing low-cost gas to SW Louisiana
Bringing low-cost gas to SW Louisiana 1 Capacity (Bcf/d) Cost ($ billions) Length (miles) Diameter (inches) Compression (HP) Status 4.0 $2.2 96 48 274,000 FERC approval complete 2 Capacity (Bcf/d) Cost ($ billions) Length (miles) Diameter (inches) Compression (HP) Status 2.0 $1.4 200 42 23,000 Bindi
Slide 15: Tellurian projects annual ~$8 cash flow per share
flow/sh(1) Tellurian projects annual ~$8 cash Integrated model to produce low-cost LNG on the water – Variable and operating costs expected to be $2.50-$3.00/mmBtu FOB – ~$20 billion in project finance debt equates to $1.00-$1.50/mmBtu(2) Tellurian retains ~14 mtpa and ~49% of the assets – Projected
Slide 16: Commercial momentum to 3-plant FID
Commercial mtpa momentum to 3-plant FID Tellurian Marketing mtpa Driftwood Holdings volume volume ed Petronet(2) Tellurian capacity Contracted volume (1) Notes: (1) Represents required equity contribution at $500/tonne. (2) Based on signed Memorandum of Understanding (MOU) with volume to be determin
Slide 17: Growing list of expected partners and customers
Growing list of expected partners and customers Credit rating(3) Partner Off-take Volume Equity investor 1.0 mtpa (Moody’s) Notes: (1) Per Memorandum of Understanding. (2) Per Memorandum of Understanding. (3) Parent credit ratings denote S&P/Moody’s/Fitch, unless noted otherwise. 18 Driftwood projec
Slide 18: Driftwood Holdings' financing
Driftwood Holdings’ financing Capacity (mtpa) 11.0 16.6 27.6 Notes: (1) Based on engineering, procurement, and construction agreements executed with Bechtel. (2) Approximately half of owners’ costs represent contingency; the remaining amounts consist of cost estimates related to staffing prior to co
Slide 19: Value to Tellurian Inc.
Value to Tellurian Inc. $ millions ($ per share) 5.0 mtpa 6.6 mtpa 13.6 mtpa capacity Potential to decrease cost of LNG by an additional ~$2.00/mmBtu Notes: (1) $4.50/mmBtu cost of LNG FOB Gulf Coast assumes $2.25/mmBtu cost of gas at Driftwood LNG terminal. (2) Annual cash flow equals the margin mu
Slide 20: Ability to deliver low-cost LNG on the water
Ability to deliver low-cost LNG on the water Optimistic case Replace or substitute amortizing bank debt for interest-only bonds Improved operating outlook at liquefaction plant Delineation of Haynesville acreage and technological advances Permian gas Debt Liquefaction Contingency Gathering, processi
Slide 21: Milestones to Final Investment Decision
Final Investment Milestone Decision Target date expected in 2019 Fully-wrapped EPC contract Draft FERC EIS Final FERC EIS November 2017 September 2018 January 2019 Executed suite of partnership agreements with Total, including: Final FERC Order April 2019 DOE license to export to non-FTA countries M
Slide 22: Contact us
Contact us Amit Marwaha Director, Investor Relations & Finance +1 832 485 2004 [email protected] Social media @TellurianLNG Joi Lecznar SVP, Public Affairs & Communication +1 832 962 4044 [email protected] 23
Slide 23: Contact us
N o Contact us = Amit Marwaha Director, Investor Relations & Finance +] 832 485 2004 [email protected] = Joi Lecznar SVP, Public Affairs & Communication +] 832 962 4044 [email protected] Social media wy @TellurianLNG 23 Voulube in)
Slide 24: Bechtel LSTK secures project execution
Bechtel LSTK secures project execution Driftwood EPC contract costs ($ per tonne) $700 Leading LNG EPC contractor – 44 LNG trains delivered to 18 customers in 9 countries – ~30% of global LNG liquefaction capacity (>125 mtpa) Tellurian and Bechtel relationship – 16 trains(1) delivered with Tellurian
Slide 25: Driftwood capacity and cost per tonne vs. competitors
Driftwood Capacity, mtpa vs. competitors – cost per tonne 31.2 10.0 9.0 15.6 9.0 8.9 27.6 16.5 14.0 $5,025 Driftwood Qatar New Megatrain Mozambique Area 4 Yamal LNG Canada APLNG Gorgon Wheatstone Ichthys LPI global ranking(3): 4.0 3.6 2.7 2.6 3.9 3.8 3.8 3.8 3.8 Sources: Wood Mackenzie, The World Ba
Slide 26: >100 Tcf available resources in Haynesville
>100 Tcf available resources in Haynesville Driftwood Holdings plans to fund and purchase 15 Tcf Potential acquisition targets: Target size: Range of resources per target (Tcf)(1): Large >~15 Tcf 15 Medium ~9 to ~15 Tcf 9 15 Small <~9 Tcf 9 Sources: IHS Enerdeq; 1Derrick; investor presentations; Tel
Slide 27: Returns to Driftwood Holdings' partners
Returns to Driftwood Holdings’ partners $(3.50) $(3.50) $(3.50) $(3.50) ($/mmBtu) 130 235 340 600 ($ millions per tonne) Notes: (1) Annual partner cash flow equals the margin multiplied by 52 mmBtu per tonne. (2) Based on 1 mtpa of capacity in Driftwood Holdings; all estimates before federal income
Slide 28: Environmental and social leadership
Environmental and social leadership Driftwood LNG project expected to reduce lifecycle carbon emissions and support local communities Lifecycle emission reduction Sustainable development Social engagement Provide an outlet for currently flared natural gas in the U.S. Liquefaction facility to have ne
Slide 29: Building momentum to FID in 2019
Building momentum to FID in 2019 June September February Feb/March April Driftwood LNG receives Final Order from FERC December February Management, friends and family invest $60 million in Tellurian et 2016 2019 December November March September December July GE invests $25 million in Tellurian TOTA
Slide 30: Building momentum to FID in 2019
Building momentum fo FID in 2019 September February Management,| Merge with friends and Magellan | family invest Petroleum, $60 million in gaining | Tellurian | YAK) December e e GE invests $25 million in Tellurian access to public markets 2 ToTrau January TOTAL invests $207 million in Tellurian 201