Samsung Heavy Industries Co., Ltd · KRX:010140
Samsung Heavy Industries — Investor Presentation (October 2011)
19 slides from Samsung Heavy Industries's investor presentation, October 2011
Slide 1: SHI Global Business Network
SHI GLOBAL BUSINESS NETWORK Oslo Moscow London Geoje Shipyard Long Chung Athens Tokyo Ningbo Dubai Houston Delhi Overseas Factory Singapore Branch Office Engineering Corporate 4
Slide 2: Vision Statement
Vision Statement To Become The World’s Finest Engineering Company and Consistently Deliver Q li Engineering Quality E i i 8
Slide 3: Office Location
VAN Neue tih et 9 > Capel Ile LEGEND w= State Boundary mum National Highway | |= Major Road Minor Road * Hotel YF Education | Cinema [settlement ME Vegetation <= Waterbody | ee
Slide 4: Work Place – A Pride
a : Eire?" HEAVY INDUSTRIES
Slide 5: Physical Security
PHYSICAL SECURITY ENTRANCE CCTV CAMERA CCTV RECORDER MAIN GATE 4 PLACES 6 MONTH CAP’Y SERVER ROOM SECURITY GUARD FIRE SAFETY ENTRANCE 24 HOURS 11
Slide 6: Information Security
INFORMATION SECURITY SECURITY PC SECURITY USB WRITE TRAINING PCMAN PROGRAM PROHIBITED VIRUS INTERNET SECURITY CD WRITE PROTECTION “URL BLOCKING” PROHIBITED 12
Slide 7: Engineering Services
ENGINEERING SERVICES Fixed Platform FPSO Topside Basic Design/ FEED, Detailed Engineering Commissioning g Assistance Semi-sub Drilling Rig Drill Ship Topside 14
Slide 8: Process Engineering
Process Engineering COND EN SOR LPG TO C AU S T I C R EF L UX WASH & DRUM STORAGE M AI N CO LUMN S T AB I L I Z E R COLUMN PUMP AR O U N D Process Evaluation LIGHT N APH T HA TO CAUST IC H E AV Y N AP H T H A WASH & STRIPPER STORAGE HN TO STORAGE P RE HE AT COOLER PUMP T R AI N AR O U N D KERO STRIP
Slide 9: Detailed Engineering
Detailed Engineering HSE Process Piping Static Equipment Rotating Machinery HVAC Structural Architectural Electrical Instrumentation 16
Slide 10: 3-D Model Review Process
3-D Model Review Process AT SHI INDIA AT SHI, KOREA / CLIENT’S OFFICE PIPING EQUIPMENT INSTRUMENT PDMS 3D INTERNAL WEEKLY MILESTONE DESIGN REVIEWS DESIGN REVIEWS MODEL WITH CLIENT • P&IDS PROCESS • LAYOUT PLANS • PROCESS REQUIREMENTS • OPERABILITY • CONSTRUCTABILITY CIVIL AND STRUCTURAL INCORPORATIO
Slide 11: Industry Standard Software
Industry Standard Software Discipline Name HYSYS / FlareNet / HTFS Process / Safety / Pipenet Piping / 3D CAESAR II / Modeling PDMS SACS / STAAD / Structural NASTRAN ETAP / Electrical Chimelite Intools / Instrumentation Instrucal PVElite / Mechanical CADVent / Carrier Project Control PrimaVera 18
Slide 12: Process platform
Process platform Completed p OWNER : ONGC, INDIA CLIENT : SHI KOREA SCOPE : FEED verification of Vasai East Process platform SPECIFICATIONS Oil processing - 12000 BOPD Gas processing - 2 MMSCMD Platform weight - Approx 13000 MT 22
Slide 13: Process platform
Process platform Completed OWNER : CONFIDENTIAL CLIENT : SHI KOREA SCOPE : FEED SPECIFICATIONS Oil processing - Approx 47000 BOPD Gas processing – Approx 7 MMSCMD Platform weight - Approx 16000 MT 23
Slide 14: Living Quarters
Living Quarters Completed p OWNER : CONFIDENTIAL CLIENT : SHI KOREA SCOPE : Conceptual design and FEED SPECIFICATIONS Approx weight - 4000 MT Capacity - Approx 200 man 24
Slide 15: Semi Submersible Drilling Rig (2 nos.)
Semi Submersible Drilling Rig ( 2 nos.) Under Progress OWNER : GAZFLOT, RUSSIA CLIENT : VSY, VSY RUSSIA / SHI KOREA LICENSOR : MOSS MARITIME, NORWAY SCOPE : Detailed Engineering of Hull (Two pontoons & Six columns) SPECIFICATIONS Pontoon length - 118 m Pontoon breadth - 15.7 m Column length - 12.8 m
Slide 16: Living Quarters (2 nos.)
Living Quarters ( 2 nos.) U d P Under Progress OWNER : GAZFLOT, RUSSIA CLIENT : SHI KOREA SCOPE : Conceptual design and Detailed engineering SPECIFICATIONS Approx weight - 1200 MT Capacity - 128 man 26
Slide 17: Drillship FPSO
Drillship U d P Under Progress OWNER : STENA CLIENT : SHI KOREA SCOPE : Stena IV Drillship Topsides Detailed Engineering FPSO Under Progress OWNER : Confidential CLIENT : SHI KOREA SCOPE : Post FEED Engineering 27
Slide 18: Expertise
Expertise FPSO Topsides • Highly g y talented team in place with FPSO topsides FEED & Detailed engineering experience. • Each Key personnel has average 4 nos. FPSO topsides experience. Living Quarters • Experience in conceptual design and Detailed engineering of three nos. large Living quarters for
Slide 19: Summary…
Summary… Part of a World Leading group EPC experience available in-house Best of Industry Talent available in-house Leveraging Heavy Engineering Engineering, Fabrication and IT Concept to Commissioning services in Oil & Gas Off h Offshore P Production d ti & DDrilling illi FiField ld Robust IT infra