Slide 1: Interruptible Load Program (ILP) March 8 Webinar
Interruptible Load Program (ILP) March 8 Webinar (I) MERALCO —
Slide 2: ILP background and ERC resolutions
© CD OW * ILP was promulgated under ERC Resolution No. 8 Series of 2010 and amended by Resolution No. 8 Series of 2013, No. 5 Series of 2015, and No. 3 Series of 2019 * ILP was first implemented in Visayas and Mindanao to ration limited power supply and avert prolonged power outages. In anticipation
Slide 3: About the Interruptible Load Program (ILP)
© CD OW (Z) MERALCO About the Interruptible Load Program (ILP) * ILP is a voluntary, demand-side management program that allows customers to collectively reduce electricity drawn from the grid when power interruptions are imminent to ration limited power supply. * Open to non-contestable customers,
Slide 4: About the Interruptible Load Program (ILP)
© GD. OW (I) MERALCO About the Interruptible Load Program (ILP) « The ILP Agreement, protocol, as well as the compensation and recovery mechanism, are part of ERC Resolution No. 5 Series of 2015 * For captive customers, the ILP Agreement is between the customer and the DU * For contestable customers
Slide 5: About the Interruptible Load Program (ILP)
© GD. OW (I) MERALCO About the Interruptible Load Program (ILP) * As of January 2023, the total capacity available for de-loading in MERALCO’s area is 560.59 MW from 117 companies representing 260 participating accounts. MERALCO ILP DE-LOADING CAPACITY (MW) WITH SIGNED AGREEMENTS As of January 2023,
Slide 6: About the Interruptible Load Program (ILP)
© CD OW About the Interruptible Load Program (ILP) * Since its implementation in 2014, MERALCO ILP has spared as many as 1.8 million households from rotating power interruptions. (I) MERALCO
Slide 7: Source: January 2023 DOE Virtual Press Conference
7 Source: 9 January 2023 DOE Virtual Press Conference, https://www.facebook.com/watch/?v=695775408859454
Slide 8: Days affected by yellow and red alerts in Luzon
DAYS AFFECTED BY YELLOW AND RED ALERTS IN LUZON Yellow Red 51 22 15 15 9 10 10 6 7 3 4 3 1 1 2 2 2014 2015 2016 2017 2018 2019 2020 2021 2022 Source: NGCP Daily Advisories 8
Slide 9: ILP implementation steps: Notification
Notification Activation Determination of Compensable kWh Billing Settlement 9
Slide 10: 5 Steps to Implementing ILP
5 Steps to Implementing ILP Notification 1 Activation Determination of Compensable kWh Billing Settlement 10
Slide 11: ILP Notification Process
({) MERALCO () WwW CD OW ILP Notification Process 1st Notification: 5pm of prior day only wan ‘ye}ow and Red System Alerts from NGCP advice ¥ 2” Notification: 7am of current day ‘Ye|low and Red System Alerts updates from NGCP ¥ ew Final Confirmation of de-loading: 2 hours before status persists sche
Slide 12: Notification Reminders
© GD. OW ({) MERALCO Notification Reminders .E' Make sure to provide the correct landline number, mobile number and email address the first and only notice for de-loading should a large power plant unexpectedly re Depending on the level of reserves, the final confirmation notice may also be breaks d
Slide 13: 5 Steps to Implementing ILP: Activation
5 Steps to Implementing ILP Notification 2 Activation A 10AM-1PM B 12NN-3PM Determination of Compensable kWh A B Billing Settlement 13
Slide 14: Activation Reminders
({) MERALCO () WwW GD. Activation Reminders (a oO Always ensure ample fue! supply De-load immediately once instructed by MERALCO Depending on the level of deficiency and time of Red Alert pronouncement by NGCP, participants may be requested to extend de-loading or de- load outside preferred schedule
Slide 15: ILP implementation steps: Determination of compensable kWh
Notification 3 Activation Determination of Compensable kWh Billing Settlement 15
Slide 16: ILP implementation steps: Billing
Notification 4 Activation Determination of Compensable kWh Billing Settlement 16
Slide 17: Billing and Compensation (Amendments)
© GD. NOW (7) MERALCO Billing and Compensation (Amendments) FEE F@¢ De-loading Compensationpesos Where: Incremental De-loading Rate Generation Cost of Fuel Fuel Consumption Rate PC Average Rate Compensable kWh Maintenance Cost [Incremental De-loading Rate x Compensable kWh] + Maintenance Cost [Gener
Slide 18: ILP implementation steps: Settlement
Notification Activation Determination of Compensable kWh 5 Billing Settlement 18
Slide 19: How to enroll: volunteer to de-load
Volunteer to de-load a certain amount of your demand Choose a time slot: 10am-1pm only, 12nn-3pm only, flexible Establish a baseline load profile Designate 3 contact persons 19
Slide 20: Switching?
© NOW (I) MERALCO Switching? Finalize the tripartite ILP agreement with your Retail Electricity Supplier (RES) to participate! 20
Slide 21: 21
21
Manila Electric Company (Meralco) — Corporate Update (March 2023) on 6ix