  1. Slide 1: Interruptible Load Program (ILP) March 8 Webinar

    Interruptible Load Program (ILP) March 8 Webinar (I) MERALCO —

  2. Slide 2: ILP background and ERC resolutions

    © CD OW * ILP was promulgated under ERC Resolution No. 8 Series of 2010 and amended by Resolution No. 8 Series of 2013, No. 5 Series of 2015, and No. 3 Series of 2019 * ILP was first implemented in Visayas and Mindanao to ration limited power supply and avert prolonged power outages. In anticipation

  3. Slide 3: About the Interruptible Load Program (ILP)

    © CD OW (Z) MERALCO About the Interruptible Load Program (ILP) * ILP is a voluntary, demand-side management program that allows customers to collectively reduce electricity drawn from the grid when power interruptions are imminent to ration limited power supply. * Open to non-contestable customers,

  4. Slide 4: About the Interruptible Load Program (ILP)

    © GD. OW (I) MERALCO About the Interruptible Load Program (ILP) « The ILP Agreement, protocol, as well as the compensation and recovery mechanism, are part of ERC Resolution No. 5 Series of 2015 * For captive customers, the ILP Agreement is between the customer and the DU * For contestable customers

  5. Slide 5: About the Interruptible Load Program (ILP)

    © GD. OW (I) MERALCO About the Interruptible Load Program (ILP) * As of January 2023, the total capacity available for de-loading in MERALCO’s area is 560.59 MW from 117 companies representing 260 participating accounts. MERALCO ILP DE-LOADING CAPACITY (MW) WITH SIGNED AGREEMENTS As of January 2023,

  6. Slide 6: About the Interruptible Load Program (ILP)

    © CD OW About the Interruptible Load Program (ILP) * Since its implementation in 2014, MERALCO ILP has spared as many as 1.8 million households from rotating power interruptions. (I) MERALCO

  7. Slide 7: Source: January 2023 DOE Virtual Press Conference

    7 Source: 9 January 2023 DOE Virtual Press Conference, https://www.facebook.com/watch/?v=695775408859454

  8. Slide 8: Days affected by yellow and red alerts in Luzon

    DAYS AFFECTED BY YELLOW AND RED ALERTS IN LUZON Yellow Red 51 22 15 15 9 10 10 6 7 3 4 3 1 1 2 2 2014 2015 2016 2017 2018 2019 2020 2021 2022 Source: NGCP Daily Advisories 8

  9. Slide 9: ILP implementation steps: Notification

    Notification Activation Determination of Compensable kWh Billing Settlement 9

  10. Slide 10: 5 Steps to Implementing ILP

    5 Steps to Implementing ILP Notification 1 Activation Determination of Compensable kWh Billing Settlement 10

  11. Slide 11: ILP Notification Process

    ({) MERALCO () WwW CD OW ILP Notification Process 1st Notification: 5pm of prior day only wan ‘ye}ow and Red System Alerts from NGCP advice ¥ 2” Notification: 7am of current day ‘Ye|low and Red System Alerts updates from NGCP ¥ ew Final Confirmation of de-loading: 2 hours before status persists sche

  12. Slide 12: Notification Reminders

    © GD. OW ({) MERALCO Notification Reminders .E' Make sure to provide the correct landline number, mobile number and email address the first and only notice for de-loading should a large power plant unexpectedly re Depending on the level of reserves, the final confirmation notice may also be breaks d

  13. Slide 13: 5 Steps to Implementing ILP: Activation

    5 Steps to Implementing ILP Notification 2 Activation A 10AM-1PM B 12NN-3PM Determination of Compensable kWh A B Billing Settlement 13

  14. Slide 14: Activation Reminders

    ({) MERALCO () WwW GD. Activation Reminders (a oO Always ensure ample fue! supply De-load immediately once instructed by MERALCO Depending on the level of deficiency and time of Red Alert pronouncement by NGCP, participants may be requested to extend de-loading or de- load outside preferred schedule

  15. Slide 15: ILP implementation steps: Determination of compensable kWh

    Notification 3 Activation Determination of Compensable kWh Billing Settlement 15

  16. Slide 16: ILP implementation steps: Billing

    Notification 4 Activation Determination of Compensable kWh Billing Settlement 16

  17. Slide 17: Billing and Compensation (Amendments)

    © GD. NOW (7) MERALCO Billing and Compensation (Amendments) FEE F@¢ De-loading Compensationpesos Where: Incremental De-loading Rate Generation Cost of Fuel Fuel Consumption Rate PC Average Rate Compensable kWh Maintenance Cost [Incremental De-loading Rate x Compensable kWh] + Maintenance Cost [Gener

  18. Slide 18: ILP implementation steps: Settlement

    Notification Activation Determination of Compensable kWh 5 Billing Settlement 18

  19. Slide 19: How to enroll: volunteer to de-load

    Volunteer to de-load a certain amount of your demand Choose a time slot: 10am-1pm only, 12nn-3pm only, flexible Establish a baseline load profile Designate 3 contact persons 19

  20. Slide 20: Switching?

    © NOW (I) MERALCO Switching? Finalize the tripartite ILP agreement with your Retail Electricity Supplier (RES) to participate! 20