Slide 1: Investor Presentation and Activity Update
Investor Presentation and Activity Update 4th December 2024 Exploring for Large Copper Porphyry’s in San Juan, Argentina
Slide 2: Disclaimer
Disclaimer Belararox Limited (”The Company”) does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. Recipients of this document should carefully consider whether the securities to be issued
Slide 3: Investment Highlights
Investment Highlights EXPLORING FOR ELEPHANTS IN A LAND OF COPPER GIANTS TMT Project (100% BRX) Proven Track Record Poised to Deliver Significant Growth • Developing the Company’s TMT • Proven exploration team with a • Drilling of multiple large porphyry targets Project in San Juan, Argentina succes
Slide 4: Corporate Overview
Corporate Overview BOARD OF DIRECTORS CAPITAL STRUCTURE Assuming placement completed Share Price1 $0.185 A$ Mr. Neil Mr. Arvind Mr. Jason Ward Mr. John Traicos 52 Week Range $0.125 – 0.400 A$ Warburton Misra Non-Executive Non-Executive Director Non-Executive Chairman Managing Director Director & Exp
Slide 5: Peer Performance – Significant Value Creation Upon Discovery
Peer Performance – Significant Value Creation Upon Discovery Recent local discoveries in the northern San Juan region have resulted in significant value creation • The below chart reflects the uplift in market capitalisation of select companies that have made an epithermal and/or porphyry discovery
Slide 6: TMT Project (100% BRX) – San Juan, Argentina
TMT Project (100% BRX) – San Juan, Argentina EXPLORING FOR ELEPHANTS IN A LAND OF COPPER GIANTS Strategically located near major Highly prospective 32,000 hectares copper and gold discoveries such as landholding located in an area Filo del Sol (Lundin), Los Helados boasting large copper porphyry (NG
Slide 7: Two High Priority Targets to be Drilled Tested November 2024
Two High Priority Targets to be Drilled Tested November 2024 • Systematic exploration undertaken in a target-rich environment Identified Drill Targets at TMT with 12 priority drill targets identified by BRX to date • Earthworks agreement executed with an established civil contractor, receiving 50% o
Slide 8: Malambo – Drill Road Construction, Magnetics Survey and Fieldwork
Malambo – Drill Road Construction, Magnetics Survey and Fieldwork 01 Dec 55% complete at Malambo (100% complete at Toro, planned for Tambo South) Planned road 8
Slide 9: Malambo – Drill Road Nearly Complete and Drill Rig On Site
Malambo – Drill Road Nearly Complete and Drill Rig On Site 9
Slide 10: Malambo – Core-Drilling Plan
Malambo – Core-Drilling Plan Three drill holes are planned for ~3400m • The location of the third hole (3 or 3*) is dependent on the results of DDH1 and 21 Satellite oblique-view DDH 1 DDH 1 DDH 2 DDH 3* DDH 2 DDH 3 DDH 3 DDH 3* Note 1: The actual locations of drill pads are dependent on access and
Slide 11: Malambo – Planned Drillholes
Malambo – Planned Drillholes 2024/25 Drilling Program • Drilling to commence in early December DDH 1 • 3400m of diamond core drilling planned DDH 2 • 3 drillholes target below outcropping potassic alteration zone • Planned hole depths of 1000m to 1200m Halley Model • Targets high probability porphyr
Slide 12: Tambo South Fieldwork
Tambo South Fieldwork 12
Slide 13: Tambo South
Tambo South Tambo South Fieldwork Complete and Target is Drill Ready • Complex with multiple stages of intrusions • Hydrothermal alteration assemblages and quartz vein types consistent with global porphyry systems • Characteristics of the upper levels of a porphyry system, with potential for high-su
Slide 14: Tambo South – Core-Drilling Plan
Tambo South – Core-Drilling Plan Two drill holes are planned for ~2,600m1 Satellite oblique-view n DDH 1 Proposed drill-hole DDH 1 DDH 2 DDH 2 Note 1: The actual locations of drill pads are dependent on access and safety constraints 14
Slide 15: Tambo South – Planned Drillholes
Tambo South – Planned Drillholes 2024/25 Drilling Program • 2,600 m of diamond drilling planned in two drill holes • Planned holes located below quartz veins and surface • Targets high probability porphyry system (interpreted from molybdenum anomaly 3D geochemical modelling) within 700m from surface
Slide 16: Toro Camp
Toro Camp • Fully functional - capacity of 45 people (to be expanded). • Drill core-cutting and logging facilities. • Medical / Nurse unit. • Geologist’s office tent. 16 16
Slide 17: TMT Project Area Satellite Spectral Targets and Updated Results
TMT Project Area Satellite Spectral Targets and Updated Results Exploration targets based on the study of Garwin (May 2023) are Tambo North 2 shown with additional targets delineated in November 2024 from Tambo North ASTER – Sentinel-2 imagery, as processed by Fathom Geophysics (Core, 2023). The new
Slide 18: Malambo Target Fieldwork
Malambo 3 Target Fieldwork 18
Slide 19: Malambo Hydrothermal Breccia Zones
Malambo 3 Hydrothermal Breccia Zones Tambo South Malambo 3 hydrothermal breccia zones with Tambo South in the background (left-hand photograph). 19
Slide 20: Tambo South, view from Malambo
Tambo South, view from Malambo 3 Tambo South Looking northwest torwards Tambo South along the trend of a clay-pyrite altered hydrothermal breccia at Malambo 3. 20
Slide 21: TMT Project Area – Lola Target (Recently Discovered)
TMT Project Area – Lola 2 Target (Recently Discovered) NOVEMBER-DECEMBER 2024 1 21
Slide 22: TMT Project – Lola Target Visit
TMT Project – Lola 2 Target Visit • Fine-grained diorite, mod. to strong phyllic alteration + high fracture abundance. • Two vein-like structures were observed cross-cutting the diorite: A) Quartz-Carbonate with copper carbonates: Azurite (~1%) + Malachite (~0.3%); B) massive Quartz with Pyrite (~1%
Slide 23: Satellite-Supported Spectral Zone of Interest
Satellite-Supported Spectral Zone of Interest Near Tambo South VI-2 Spectral zone of interest Tambo South Panoramic-view, looking west towards the Chile – Argentina border from the Malambo drill access road (approx. 12km field of view). The dashed line approximately outlines the northerly-trending,
Slide 24: TMT Project – Key Deliverables
TMT Project – Key Deliverables To Commence Maiden Drilling at TMT Project in early December 2024 Completed Works Civil Works Sep 2024 - Apr 2025 Target generation Construct drill rig access tracks Reconnaissance Reconnaissance Oct 2024 – Apr 2025 mapping Construct drill pads Geological mapping remai
Slide 25: Belararox Limited
Belararox Limited A PATHWAY TO SUCCESS Belararox Limited (ASX:BRX) Arvind Misra Managing Director [email protected] Paul Berson Corporate Storytime [email protected] www.belararox.com.au This presentation has been authorised for release by the Board of Directors. 25
Slide 26: Competent Person Statements
Competent Person Statements Competent Person Statement (Argentina) Competent Person Statement (Australia) Mr Jason Ward is a Competent Person who is a Fellow and Chartered Professional of the Australasian Institute of Mining and Mr Jason Ward is a Competent Person who is a Fellow and Chartered Profe