ArcelorMittal South Africa Limited · JSE:ACL

ArcelorMittal South Africa — Corporate Update (May 2015)

28 slides from ArcelorMittal South Africa's corporate update, May 5, 2015

  1. Slide 1: Newcastle Works

    ArcelorMittal Newcastle Works 05 May 2015

  2. Slide 2: Overview: ArcelorMittal South Africa

    OVERVIEW: ARCELORMITTAL SOUTH AFRICA

  3. Slide 3: Locations of operations

    Locations of operations Vanderbijlpark Works • Gauteng province • 2 blast furnaces; 3 basic oxygen Vereeniging Works furnaces • Gauteng Province • Slabs, plates, hot-rolled, cold- • components for automotive rolled, electro galvanised (EGL), industry, Seamless tubes, Profiles tinplate, colour coated

  4. Slide 4: ArcelorMittal SA Factor Dashboard National Summary

    ArcelorMittal SA Factor Dashboard National Summary As South Africa's leading steel producer, ArcelorMittal South Africa plays a vital role in the economy. Total Direct GDP contribution reached R26bn or 1% in 2014 . This contribution is based on 's expenditure on raw materials, labour, capital expend

  5. Slide 5: ArcelorMittal SA Factor Dashboard of Newcastle plant

    ArcelorMittal SA Factor Dashboard of Newcastle plant Arcelormittal South Africa continues to play a vital role in the economy of KwaZulu-Natal province, with a total value addition of R3.5bn ( direct GDP) in 2014. ArcelorMittal SA’s Newcastle plant a key socio-economic contributor Total of R985 m in

  6. Slide 6: Outlook for Q2 2015

    Outlook for Q2 2015  Domestic demand remains under pressure while imports are still flowing into South Africa  Production to be reduced further by 6% to 4 300tpd to reduce the steel stock on hand.  Sales volumes expected to be lower due to market constraints (reduced export allocation) and due to

  7. Slide 7: Overview: Newcastle Works

    “_< ArcelorMittal OVERVIEW: NEWCASTLE WORKS

  8. Slide 8: Newcastle Management Team

    Newcastle Management Team Assistant Yvette Venter General Manager Gerald Gadd Works Manager: Works Manager: Works Manager: Works Manager: Manager: Manager: Primary Steelmaking, GM Iron Making Finishing & Dispatch, QM Secondary Rolling Eng. & Projects Coke & Chem Marketing: Long Planning & Logistics

  9. Slide 9: Newcastle Works - Key Figures

    Newcastle Works - Key Figures Key Indicators 2013 2014 Safety Performance, LTIFR 0.64 0.60 EBITDA R1029m - R122m Liquid steel Production (‘000 1 568 609 tons) Sales tons (‘000tons) 878 597 Percentage Domestic Sales 88% 86% Manpower (average FTEs per 1591 1547 permanent month) TCOE (Incl. own; HL & R

  10. Slide 10: Production Flow and Equipment

    Production Flow and Equipment MARKET 9

  11. Slide 11: Projects: Blast Furnace N5

    “_< ArcelorMittal PROJECTS BLAST FURNACE N5

  12. Slide 12: Blast furnace N5 Reline

    Blast furnace N5 Reline  Project commenced on 12 May 2014 and was completed on 7 November 2014.  Safety - 151 injuries (1 Fatality, 2 LTI’s).  A total of 2.6 million man-hours was worked on site (at peak 2 400 people on site, of which 50% were local).  Project duration of 179 days was 54 days lo

  13. Slide 13: Blast furnace N5 rebuild

    Blast furnace N5 rebuild New off-gas piping viewed from 93m New staves ready for installation Monster scaffold at the stockhouse 12

  14. Slide 14: Blast furnace N5 rebuild

    Blast furnace N5 rebuild Removal of old hopper Lancing the bear Row 6 staves installation Arrival of a portion of the new cyclone Site at night 13

  15. Slide 15: Blast furnace N5 rebuild

    Blast furnace N5 rebuild 14 Input stocks Removal of the down piping Rebar inventory ready for rolling to customer specifications Looking from the bottom up into the furnace Removal of the off-gas system

  16. Slide 16: Economic spin-off

    Economic spin-off • Of the R2 billion spent, R1.3 billion was made available for items or services available in South Africa. R392 million (or 30%) was spent in the northern KwaZulu-Natal region. • A total of R198 million in direct orders was placed with local vendors and a further R104 million was

  17. Slide 17: Projects: Zero Effluent Discharge

    PROJECTS ZERO EFFLUENT DISCHARGE

  18. Slide 18: Zero Effluent Discharge

    Zero Effluent Discharge

  19. Slide 19: Background

    Background  Newcastle Works has been using the practice of irrigation to dispose of effluent since 1973.  Newcastle Works decided to phase out this practice in accordance to Water Act passed in South Africa in 1998.  According to the new act, no release of effluent to the river is allowed, this m

  20. Slide 20: Technical Solution

    Technical Solution  The proposal was thus to segregate the effluent streams to enable correct treatment and recycling back into the process water distribution  Between 2001 and 2014, the following plants were constructed: • Cold Lime softening plant: to remove the hardness salts from a cleaner str

  21. Slide 21: Benefits of ZED

    Benefits of ZED  Phasing out of irrigation with effluent  Treating and re-using all process effluent  No effluent is discharged into the environment  Reducing the raw water extraction to 500m3/hr (about 40% reduction)  Complying with South African legal requirements 20 5/7/2015

  22. Slide 22: Implementation of the Project

    Implementation of the Project  Total Cost to achieve ZED: R 428.83m  Civil work: Steffanutti Stocks  Civil consultant: Thompson van Eck  Piping plus equipment installation : WABE  Electrical supply to plant: Cato Ridge Electrical  Safety Statistics: No LTIs, 1 RWDC, 13 First Aid 21 5/7/2015

  23. Slide 23: Current Status & Achievements

    Current Status & Achievements  The Biological Treatment plant was commissioned in April 2014 and is successful in removing Ammonia, Phenols, Cyanide, and Organics from the effluent  Started hot commissioning of the Reverse Osmosis Plant  The Evaporator and Crystalliser Plant commissioned in Septe

  24. Slide 24: Sustainability

    “_< ArcelorMittal Sustainability

  25. Slide 25: CAPEX spent on Environmental projects to date

    CAPEX spent on Environmental projects to date Year Project Capital 2001 Old waste site cut-off trenches R3.5m 2003 & 2010 New waste site & phase 2 R49m 2003 - 2008 Water strategy (phases 1 – 4) R234m 2004 - 2011 Rehabilitation of historical dumps R33m 2000 - 2009 Air quality projects R69.3m 2008 – 2

  26. Slide 26: Socio-economic Development

    Socio-economic Development  R8.2m spent in 2014 • 10 new homes in Blaauwbosch near Newcastle were built by employees during International solidarity holidays  Science center • Signed an MOU for the Newcastle Science Center to assist the Department of Education with teacher development training • O

  27. Slide 27: Communities

    ArcelorMittal n 2 ¢ 5 € = fe) O

  28. Slide 28: Thank You

    “<— ArcelorMittal THANK YOU 27

ArcelorMittal South Africa — Corporate Update (May 2015) on 6ix