Earthstone Energy — Investor Presentation (May 2022)
26 slides from Earthstone Energy's investor presentation, May 4, 2022
Slide 1: Investor Presentation May 4, 2022
Investor Presentation May 4, 2022 Exhibit 99.2
Slide 2: Disclaimer: Forward-Looking Statements
2 Disclaimer Forward-Looking Statements This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). Statements that a
Slide 3: The New Earthstone: Transformed SMID-Cap, Permian Producer
3 The New Earthstone: Transformed SMID-Cap, Permian Producer Top Investment Criteria Earthstone’s Qualifications Greater Efficiency from Increased Critical Mass ✓ Six acquisitions since early 2021 increase production by >4x and improve cost and operating efficiencies Top Basins / Long Inventory Life
Slide 4: Company Overview
4 Company Overview Asset Overview The Woodlands, Texas based E&P company focused on acquisitions, development and production of oil and natural gas in the Permian Basin with ~248,000 net acres Recent string of six acquisitions has established critical mass Earthstone standalone estimated 1Q22
Slide 5: Capital Structure and Liquidity Snapshot
5 Capital Structure and Liquidity Snapshot Market Statistics (1) Excludes 5.7MM shares of Class A Common Stock issued to Bighorn on 4/14/22. (2) Includes the impact of the 5.7MM shares of Class A Common Stock issued to Bighorn on 4/14/22. Adjustments also reflect the impact of the closing of the Big
Slide 6: Acquisitions Have Transformed Earthstone in 2021-22
6 Date Announced FY 2020A 12/18/20 4/1/21 10/4/21 12/16/21 1/31/22 Acquisitions Total Acquisition Price ($MM)(1) $182.0 $126.5 $73.2 $603.8 $860.0 $1,846 Consideration Mix (% Cash / % Stock) 72% / 28% 65% / 35% 67% / 33% 68% / 32% 57% / 43% 63% / 37% Proved Developed PV-10 ($mm)(2) $173 $153 $116 $4
Slide 7: Highly Focused Environmental Stewardship
7 Minimize fugitive emissions with the installation of emission reducing equipment in conjunction with new facility construction: ‐ Vapor Recovery Units (“VRUs”) ‐ Air compression equipment for Pneumatic Actuators Target Zero Flaring: Connect natural gas pipelines ahead of flowback and first product
Slide 8: Responsible Management of Air Emissions and Flaring
8 (1) Peers include CDEV, CPE, FANG, LPI, MTDR, PXD, SM and XEC. Data compiled from company published data for most recent available year (2019 or 2020) and from publicly available EPA reports as of June 1, 2021. 2020 Greenhouse Gas Emissions Intensity of 12.4 (T CO2e / Mboe) 29% Below Permian Peers
Slide 9: Earthstone Overview
Earthstone Overview EARTHSTONE | 9 Energy Ine.
Slide 10: Financial and Operating Metrics Overview
10 $19 $61 $97 $146 $144 $248 $603 $939 FY16A FY17A FY18A FY19A FY20A FY21A 1Q22A Annual. FY22 Consensus 0.9x 0.4x 0.8x 1.2x 0.8x 1.0x YE16A YE17A YE18A YE19A YE20A 1Q22A Annual. $10.29 $6.84 $5.66 $5.85 $5.21 $5.45 $6.77 $7.50 $6.43 $7.13 $5.81 $3.87 $3.25 $2.31 $2.03 $1.35 $16.72 $13.97 $11.47 $9.
Slide 11: Earthstone's Significant Growth Transformation
11 $2,658 $2,998 $3,034 $3,113 $5,872 $6,145 $7,761 Peer 1 ESTE Peer 2 Peer 3 Peer 4 Peer 5 Peer 6 14.9 15.3 30.2 64.3 82.7 83.7 84.4 111.9 145.5 Peer 1 ESTE FY20 ESTE 4Q21 Peer 2 Peer 3 Peer 4 ESTE + Chisholm + Bighorn Peer 5 Peer 6 4Q21 Production (MBoe/d) Enterprise Value ($mm) Earthstone’s Signi
Slide 12: Cost Structure and Cash Margin vs. Peers
12 $11.57 $11.97 $13.45 $14.82 $15.29 $15.60 $17.43 $18.25 $19.09 ESTE Peer 1 Peer 2 Peer 3 Peer 4 Peer 5 Peer 6 Peer 7 Peer 8 LOE (incl Workovers) Ad Val. & Prod. Taxes Transportation Cash G&A Interest Expense 78% 76% 80% 68% 69% 70% 71% 75% 78% ESTE Peer 1 Peer 2 Peer 3 Peer 4 Peer 5 Peer 6 Peer 7
Slide 13: Reserve Overview as of 1/1/22
13 Reserve Overview as of 1/1/22(1) (1) Based on third party reserve reports by CG&A and Ryder Scott as of January 1, 2022 run at strip pricing as of 3/15/22. (2) PV-10 is a supplemental non-GAAP financial measure. See Appendix for a reconciliation of PV-10 to the most directly comparable GAAP finan
Slide 14: Financial Overview
Financial Overview EARTHSTONE | 14 Energy Ine.
Slide 15: 2022 Guidance
15 2022 Guidance Production Guidance Expense & Capex Guidance Note: Guidance is forward-looking information that is subject to considerable change and numerous risks and uncertainties, many of which are beyond Earthstone’s control. See “Forward-Looking Statements”. Cash G&A is defined as general and
Slide 16: Overview Map and 2022 Capital Program
16 Overview Map | 4 Rigs Total (2 Midland Basin, 2 Delaware Basin) ~$410mm - $440mm capital expenditures 2 drilling rigs in each of Midland Basin and Delaware Basin 2022 Capital Program Earthstone 2022 Capital Budget ($ in millions) Op. D&C Capex - Midland Basin $265 - $285 Op. D&C Capex - Delaw
Slide 17: Oil and Gas Hedging Summary
17 Oil and Gas Hedging Summary WTI Hedges (Bbls/d and $/Bbl(1)) Henry Hub Hedges (MMBtu/d and $/MMBtu(1)) Note: Includes all WTI and Henry Hub hedges as of 5/2/22. Does not include basis swaps. (1) Reflects weighted average swap price and weighted average collar floor / ceiling prices for each quart
Slide 18: Analyst Coverage
18 Analyst Coverage Firm Analyst Contact Info Alliance Global Partners Jeffrey Campbell / 888-543-4448 / [email protected] Benchmark Subash Chandra / 212-312-6755 / [email protected] Johnson Rice Charles Meade / 504-584-1274 / [email protected] RBC Scott Hanold / 512-708-6354 / scott
Slide 19: Contact Information
19 Mark Lumpkin, Jr. EVP, Chief Financial Officer Scott Thelander Vice President of Finance Corporate Offices Houston 1400 Woodloch Forest Drive | Suite 300 | The Woodlands, TX 77380 | (281) 298-4246 Midland 600 N. Marienfeld | Suite 1000 | Midland, TX 79701 | (432) 686-1100 Website www.earthstoneen
Slide 20: Appendix
Appendix EARTHSTONE | 20 Energy Ine.
Slide 21: WTI Oil and HH Gas Hedges
21 WTI Oil Hedges - Swaps HH Gas Hedges - Swaps Period Volume (Bbls) Volume (Bbls/d) $/Bbl Period Volume (MMBtu) Volume (MMBtu/d) $/MMBtu 2Q 2022 1,085,250 11,926 $64.48 2Q 2022 2,902,500 31,896 $3.595 3Q 2022 1,081,000 11,750 $66.70 3Q 2022 3,266,000 35,500 $3.626 4Q 2022 1,081,000 11,750 $66.70 4Q
Slide 22: SEC Stand-Alone Reserves Summary & PV-10 – Year-End 2021
22 SEC Stand-Alone Reserves Summary & PV-10 – Year-End 2021 As shown in the table below, Earthstone’s stand-alone estimated proved reserves at year end 2021 were independently estimated by Cawley, Gillespie & Associates, Inc. (“CGA”), independent petroleum engineers, and which was prepared in accord
Slide 23: Alternative Reserves Summary – 1/1/22
23 Alternative Reserves Summary – 1/1/22 The information presented below includes the combination of the stand-alone reserve quantities and PV-10 for Earthstone and for the Chisholm and Bighorn Acquisitions as of January 1, 2022. This alternative summary as shown in the table below has been prepared
Slide 24: Reconciliation of Non-GAAP Financial Measure – Adjusted EBITDAX
24 Reconciliation of Non-GAAP Financial Measure – Adjusted EBITDAX Earthstone uses Adjusted EBITDAX, a financial measure that is not presented in accordance with GAAP. Adjusted EBITDAX is a supplemental non-GAAP financial measure that is used by Earthstone’s management team and external users of its
Slide 25: Reconciliation of Non-GAAP Financial Measure – Adjusted EBITDAX
25 Reconciliation of Non-GAAP Financial Measure – Adjusted EBITDAX Earthstone uses Adjusted EBITDAX, a financial measure that is not presented in accordance with GAAP. Adjusted EBITDAX is a supplemental non-GAAP financial measure that is used by Earthstone’s management team and external users of its
Slide 26: Footnotes Page
26 Footnotes Page 6 1) IRM Acquisition price of $186MM based on $50.8MM of equity consideration (approximately 12.7MM Class A shares and ESTE share price of $3.99 on 12/16/20) and cash consideration of $135.2MM. Tracker Acquisition price of $126MM based on $44.2MM of equity consideration (approximat