Diamond Offshore Drilling Inc

Diamond Offshore Drilling — Barclays 2013 CEO Energy-Power Conference

34 slides from Diamond Offshore Drilling's conference presentation, Sep 12, 2013

  1. Slide 1: Barclays 2013 CEO Energy-Power Conference

    Slide 1: Barclays 2013 CEO Energy-Power Conference

    Barclays 2013 CEO Energy-Power Conference New York, September 12, 2013 Larry Dickerson President and Chief Executive Officer

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Statements made during the scope of the Diamond Offshore Drilling, Inc.’s presentation that state the Company’s or management’s “intentions”, “plans”, “estimates”, “expectations”, “anticipations”, “predictions” and words of similar import are “forward-looking statements” made within the m

  3. Slide 3: Agenda

    Slide 3: Agenda

    Diamond Offshore Drilling, Inc. Agenda Shareholder Focus Fleet Growth Market Outlook Today’s Challenges

  4. Slide 4: Diamond Fleet Growth

    Slide 4: Diamond Fleet Growth

    Diamond Offshore Drilling, Inc. Fleet Growth

  5. Slide 5: BP Harsh Environment Semi

    Slide 5: BP Harsh Environment Semi

    Offshore Drilling, Inc. BP Harsh Environment Semi Superior Motion Characteristics in Rough Seas CS60 Design Status Total Cost: $755MM Shipyard: Hyundai Heavy Industries Targeted Delivery Date: Late Q4 2015 Contract Term: 3 years in South Australia, >$585K/d

  6. Slide 6: Newbuild Drillship Status

    Slide 6: Newbuild Drillship Status

    Offshore Drilling, Inc. Newbuild Drillship Status BlackHawk BlackHornet BlackRhino BlackLion Cost (Millions) $635 $635 $645 $655 Shipyard Delivery Q3 2013 Q4 2013 Q2 2014 Q4 2014 Contract Status Anadarko (GoM) 5 Years $495k/Day Anadarko (GoM) 5 Years $495k/Day Available Available Specifications ?Hyu

  7. Slide 7: Diamond Ocean BlackHawk Currently Undergoing Commissioning

    Slide 7: Diamond Ocean BlackHawk Currently Undergoing Commissioning

    Diamond Offshore Drilling, Inc. Ocean BlackHawk Currently Undergoing Commissioning

  8. Slide 8: Investing in the Fleet

    Slide 8: Investing in the Fleet

    Offshore Drilling, Inc. Investing in the Fleet Rig Name Shipyard Delivery Date Description Cost (Millions) HE Semi 2016 HE Semi $ 755 Patriot 2014 North Sea Semi 120 Apex 2014 DW Semi 370 BlackLion 2014 UDW Drillship 655 Onyx 2013 DW Semi 300 BlackRhino 2014 UDW Drillship 645 BlackHornet 2013 UDW Dr

  9. Slide 9: Fleet Profile

    Slide 9: Fleet Profile

    Offshore Drilling, Inc. Fleet Profile Ultra-Deepwater Units (?7,500’) Deepwater Units (5,000 to 7,499’) Confidence Baroness Rover Endeavor Monarch Courage Valor Clipper BlackHawk BlackHornet BlackRhino BlackLion America Alliance Valiant Star Victory Onyx 13 7 20 Apex HE Semi

  10. Slide 10: Potential Earnings Power Added

    Slide 10: Potential Earnings Power Added

    Offshore Drilling, Inc. Potential Earnings Power Added * EBITDA = Earnings before interest, tax, depreciation and amortization; based on 95% utilization; refer to reconciliation to GAAP Assumed Dayrate Assumed Opex Potential Annual EBITDA* (Millions) BP Newbuild Semi $ 585,000 $225,000 $ 121 BlackLi

  11. Slide 11: Floater Fleet Transformation

    Slide 11: Floater Fleet Transformation

    Offshore Drilling, Inc. Floater Fleet Transformation Note: 2012 excludes units Held for Sale and includes rigs currently under construction. 2009 Today 2016 Estimated 2012 Actual EBITDA Contribution UDW 26% DW 24% MW 47% J/U 3% UDW DW MW MW—N. Sea Approximately 70% of EBITDA from UDW / DW

  12. Slide 12: Shareholder Focus

    Slide 12: Shareholder Focus

    Offshore Drilling, Inc. Shareholder Focus

  13. Slide 13: Dividends Nothing New at Diamond Offshore

    Slide 13: Dividends Nothing New at Diamond Offshore

    Offshore Drilling, Inc. Dividends Nothing New at Diamond Offshore Since 2006, over $5 billion of dividends have been paid, while we remain conservatively leveraged.

  14. Slide 14: Cumulative Dividends Since 2006

    Slide 14: Cumulative Dividends Since 2006

    Offshore Drilling, Inc. Cumulative Dividends Since 2006 36.76 $0 $5 $10 $15 $20 $25 $30 $35 $40 2006 2007 2008 2009 2010 2011 2012 2013YTD Total Regular and Special Dividends per Share

  15. Slide 15: Cumulative Cash Returned Since 2006

    Slide 15: Cumulative Cash Returned Since 2006

    Offshore Drilling, Inc. Cumulative Cash Returned Since 2006 $36.76 $- $5 $10 $15 $20 $25 $30 $35 $40 DO SDRL ESV RIG NE RDC ATW Total Dividends and Return of Capital per Share Source: Bloomberg

  16. Slide 16: Financial Strength

    Slide 16: Financial Strength

    Offshore Drilling, Inc. Financial Strength 3% 23% 26% 33% 46% 49% 54% 0% 10% 20% 30% 40% 50% 60% DO RDC ATW ESV RIG SDRL NE Net Debt to Market Cap Debt and net debt as of Q2 2013 SEC filings; market cap as of August 30, 2013.

  17. Slide 17: Only A-Rated Drilling Contractor

    Slide 17: Only A-Rated Drilling Contractor

    Offshore Drilling, Inc. Only A-Rated Drilling Contractor (in Millions) DO NE ESV RIG RDC ATW SDRL Moody’s Rating A3 Baa2 Baa1 Baa3 Baa3 Ba2 n/a S&P Rating A- BBB+ BBB+ BBB- BBB- BB n/a

  18. Slide 18: Return on Capital Employed (ROCE)

    Slide 18: Return on Capital Employed (ROCE)

    Offshore Drilling, Inc. Return on Capital Employed (ROCE) 11.6% -5% 0% 5% 10% 15% DO ATW ESV SDRL NE RIG RDC 2012 Source: Jefferies

  19. Slide 19: Return on Capital Employed (ROCE) 5-Year Average

    Slide 19: Return on Capital Employed (ROCE) 5-Year Average

    Offshore Drilling, Inc. Return on Capital Employed (ROCE) Source: Jefferies 27.3% 0% 5% 10% 15% 20% 25% 30% DO ATW ESV NE RDC RIG SDRL 5-Yr Average (2008–2012)

  20. Slide 20: Market Outlook

    Slide 20: Market Outlook

    Offshore Drilling, Inc. Market Outlook

  21. Slide 21: Market Summary

    Slide 21: Market Summary

    Offshore Drilling, Inc. Market Summary •Demand growth in West Africa •Newbuild activity continues—13 UDW orders YTD Ultra-Deepwater Deepwater •Globally balanced •Future growth expected from recent USGOM discoveries Mid-water •UK strength •Demand emerging in frontier areas: Nicaragua, Peru, Columbia,

  22. Slide 22: Repricing Power

    Slide 22: Repricing Power

    Offshore Drilling, Inc. Repricing Power Rig Name Current Dayrate (000’s) Future Dayrate (000’s) Rollover Date Vanguard 356 450 Jul-2013 Victory 420 480 Sep-2013 America 405 475 Oct-2013 Rover 304 465 Mar-2014 Patriot 275 401 Apr-2014 Endeavor 285 505 Jun-2014 Confidence 375 511 Dec-2014 Princess 230

  23. Slide 23: Midwater Fleet Status

    Slide 23: Midwater Fleet Status

    Offshore Drilling, Inc. Midwater Fleet Status Marketed Mid-water Units 15 5 6 4 North Sea – Continuing Strength Princess (Dec ‘13), Vanguard (Feb ‘15), Nomad (Aug ‘15), Guardian (Jul ‘15), and Patriot (May ‘17) Long-Term Contracts with NOCs Yorktown (Jul ‘14), Yatzy (Oct ‘14), Worker (Feb ‘15), Winn

  24. Slide 24: OGX Status Contract Updates

    Slide 24: OGX Status Contract Updates

    Offshore Drilling, Inc. OGX Status Contract Updates Ocean Star: Contracted through Feb ‘14 Farmed-out for remainder of contract Ocean Quest: Contracted through Dec ‘13 Pursuing farm-out opportunities

  25. Slide 25: OGX Status Exposure

    Slide 25: OGX Status Exposure

    Offshore Drilling, Inc. OGX Status Exposure Over $1.4 billion of revenue received from OGX through 2Q 2013. (in millions) 6/30/13 Receivable Balance $ 23 Q3 2013 Estimated Revenues 36 Total OGX Exposure as of 9/30/13 $ 59

  26. Slide 26: Jack-up Fleet Status

    Slide 26: Jack-up Fleet Status

    Offshore Drilling, Inc. Jack-up Fleet Status Parentheses denote contract end dates Marketed Jack-up Units 6 4 1 1 Mexico – Term Market Scepter (Dec ‘13), Titan (Jan ‘14), Summit (May ‘15) and Nugget (Jul ‘16) Long-Term Bareboat Charter Spur (Aug ‘14) Solid Demand in US GOM King

  27. Slide 27: Today's Challenges

    Slide 27: Today's Challenges

    Offshore Drilling, Inc. Today’s Challenges

  28. Slide 28: Today's Challenges

    Slide 28: Today's Challenges

    Offshore Drilling, Inc. Today’s Challenges Challenges Faced Executing construction program Controlling costs Crewing new rigs

  29. Slide 29: Today's Challenges: Executing Construction Program

    Slide 29: Today's Challenges: Executing Construction Program

    Offshore Drilling, Inc. Today’s Challenges Executing Construction Program •First two units impacted by equipment delays •Subsequent five units are on schedule and within budget. •Turn-key delivery protects against drillship cost overruns

  30. Slide 30: Today's Challenges: Managing Contract Drilling Expense

    Slide 30: Today's Challenges: Managing Contract Drilling Expense

    Offshore Drilling, Inc. Today’s Challenges Managing Contract Drilling Expense: Actual Projected 2011 2012 2013 Rig Op Ex $1.55B $1.54B <$1.60B

  31. Slide 31: Today's Challenges: Crewing New Rigs

    Slide 31: Today's Challenges: Crewing New Rigs

    Offshore Drilling, Inc. Today’s Challenges Crewing New Rigs •1,000 new job positions — just at DO •Staffing new rigs with trained crews •Maintaining high quality across fleet

  32. Slide 32: Offshore Drilling, Inc.

    Slide 32: Offshore Drilling, Inc.

    Offshore Drilling, Inc.

  33. Slide 33: Summary

    Slide 33: Summary

    Offshore Drilling, Inc. Summary 1 Focused on Shareholder Value 2 3 New Rig Capacity at Attractive Prices Solid Market Outlook

  34. Slide 34: Disclaimer: Regulation G Reconciliation to GAAP

    Slide 34: Disclaimer: Regulation G Reconciliation to GAAP

    Offshore Drilling, Inc. Disclaimer: Regulation G Reconciliation to GAAP 2012 Net Income $ 720.5 Depreciation 392.9 Interest expense 46.2 Interest Income (4.9) Income tax expense 197.6 Foreign currency loss 2.0 2012 EBITDA 1,354.3 This presentation may include certain “non-GAAP financial measures.” F

Source: SEC EDGAR · 8-K filed Sep 12, 2013

More decks from Diamond Offshore Drilling Inc