Mitsubishi Heavy Industries, Ltd. · TSE:7011

Mitsubishi Heavy Industries — Scandinavian Renewable Energy Forum 2008

23 slides from Mitsubishi Heavy Industries's conference presentation, October 2008

  1. Slide 1: MHI's Experiences in Post Combustion CO2 Capture

    Scandinavian Renewable Energy Forum MHI’s Experiences in Post Combustion CO2 Capture: An Effective Means to Counter Anthropogenic Global Warming Nobuo Imai & Ronald Mitchell October 1-2, 2008 • Oslo, Norway 1

  2. Slide 2: Mitsubishi Heavy Industries Ltd.

    Mitsubishi Heavy Industries Ltd. ¾ Mitsubishi Heavy Industries Ltd. (MHI) is a leading global engineering, construction and technology provider (Fortune ‘Global 500’ Company) ¾ Founded in 1884 ¾ MHI is one of the largest companies in Japan with 35,000 employees and sales >$30 billion USD in FY2007 ¾

  3. Slide 3: MHI – Post Combustion CO2 Capture Snapshot

    MHI – Post Combustion CO2 Capture Snapshot „ Mitsubishi Heavy Industries, Ltd. (MHI) ‹ World leader in post combustion CO2 capture ‹ >18 years of R&D experience for CO2 capture ‹ >16 years of cumulative commercial experiences „ Joint PCC Research & Development ‹ With Kansai Electric Power Co. since

  4. Slide 4: MHI – Post Combustion CO2 Capture Snapshot (Coal Fired)

    MHI – Post Combustion CO2 Capture Snapshot „ Coal Fired PCC Experience ‹ Matsushima long term demonstration plant (J-Power) ‹>5,000 hours of PCC experience with coal (10 tpd) „ Commercial PCC Experience ‹ Four commercial plants in operation (up to 450 tpd) ‹ Four commercial plants under construction

  5. Slide 5: Process Flow for Advanced Amine Absorption

    Process Flow for Advanced Amine Absorption Flue Gas Outlet CO2 Purity 99.9 % ABSORBER STRIPPER C.W. (Regenerator) Flue Gas Cooler/Deep FGD C.W. Flue Gas C.W. Pre-treated Flue gas Steam Reboiler 5

  6. Slide 6: Large Scale Experience

    Large Scale Experience 3000 tpd CO2 Capture Plant Basic design complete Absorber Stripper Cooling Tower Deep FGD Flue Gas Duct 6

  7. Slide 7: MHI's CO2 Capture Technology Development

    MHI’s CO2 Capture Technology Development Nat. Gas Coal Project Details Tons per Day 2007 2008 2009 2010 2011 2012 2013 2014 Small Bench Scale Tests – <0.1 Hiroshima R&D Center Completed Large Bench Scale Tests – 0.1 Completed Hiroshima R&D Center & KEPCO Pilot Scale Tests - Hiroshima R&D Center 1.0

  8. Slide 8: Solvent & Process Development

    Solvent & Process Development PILOT PLANT OUTLINE Location : Nanko Power Plant, Osaka, Japan Capacity : 2 MT/D Start Up : 1991 Feed Gas : Natural gas fired boiler Purpose of the Plant ① Development of Energy Minimizing Solvent ② Development of Equipment Technology Development Results ‹ New Solvents

  9. Slide 9: Process comparison KS-1 V MEA

    Process comparison KS-1 V MEA Advanced Amine Solvent ‘KS-1’ ¾Advanced solvent performance is critical • High CO2 Loading ¾MHI tested more than 200 solvents • Low Solvent Degradation • Low Corrosion ¾Further solvent development ongoing • No Corrosion Inhibitor MEA KS-1 Solution Circulation Rate 1 0.6

  10. Slide 10: MHI's Operating Commercial CO2 Capture Plants

    MHI’s Operating Commercial CO2 Capture Plants Malaysia India Client: Petoronas Client: IFFCO Start-up: 1999~ Location: Aonla CO2 Source: Start-up: Dec 2006~ Nat. Gas Reformer CO2 Source: Capacity: 200 t/d Nat. Gas Reformer Product: Urea Capacity: 450 t/d Product: Urea Japan India Client: Chemical Co

  11. Slide 11: MHI's Recently Awarded Commercial Projects

    MHI’s Recently Awarded Commercial Projects OTHER PROJECTS Abu Dhabi India Bahrain Pakistan Under Under Under Project Status Construction Construction Construction Project Award Nat. Gas. Nat. Gas. Nat. Gas. Nat. Gas. Flue Gas Source Reformer Reformer Reformer Reformer Expected on 2009 2009 2010 2010

  12. Slide 12: MHI PCC Projects in Scandinavia

    MHI PCC Projects in Scandinavia MHI receives FEED contract for Norway Kårstø plant Source; Carbon Capture Journal, 26 Aug 2008 ‹ Mitsubishi Heavy Industries (MHI) has signed a contract with Gassnova to carry out Front End Engineering and Design (FEED) studies for the planned CO2 capture plant at Kår

  13. Slide 13: MHI PCC Projects in the UK

    MHI PCC Projects in the UK E.ON welcomes news Kingsnorth clean coal project taken to next stage in government's CCS competition Source; E.ON UK Press Releases, 30 June 2008 ‹ E.ON, one of the UK’s leading generators, has today welcomed the news that its Kingsnorth clean coal project has been piloted

  14. Slide 14: Multi-Pollutant Test Plant (FGD & CO2 Capture)

    Multi-Pollutant Test Plant (FGD & CO2 Capture) „ Absorber 1 by 1 Scale Test Facility (400 MW equivalent, 1,200,000Nm3/h) „ MHI is now testing large scale solvent distributors preparing for large scale flue gas CO2 capture projects. Absorber Spray pipes Fan 32 m Recirculation Pumps Commercial Scale T

  15. Slide 15: Coal Fired Long Term Demonstration Plant

    Coal Fired Long Term Demonstration Plant Plant Outline Solvent : KS-1 Capacity : 10 T/D Feed Gas : Coal Fired Boiler (14.1 v% CO2) Start-up : July 2006 Location : JPower 1000MW coal fired Power Station, Matsushima Island, Nagasaki, Japan Phase 1 ¾Initial verification of KM-CDR Process on coal fired

  16. Slide 16: Coal Testing Results

    Coal Testing Results Test Item Result • Achieve long term stable operation 9 >5000 hours of near continuous operation • Confirm effect of various impurities on CO2 9 Advanced know-how of the impacts of dust, SO2 capture process & equipment and NOx • Achieve high CO2 purity performance 9 >99.9% achie

  17. Slide 17: MHI's Japan based CO2/FGD Tour Facilities

    MHI’s Japan based CO2/FGD Tour Facilities MHI CO2 Capture & FGD R&D Center MHI Yokohama Office Engineering HQs Matsushima 10 tpd Coal Fired CO2 Capture Demonstration Plant Nanko 2 tpd Natural Gas CO2 Capture Pilot Plant Shikoku Electric Tachibana-wan power Kurosaki 330 tpd station (1050MW single tra

  18. Slide 18: Commercialization for Coal Application

    Commercialization for Coal Application MHI’s Operating Experience • Pilot plants (1-2 t/d) • Small scale demonstration plant (10 t/d) • Commercial plants (200-450 t/d) • Experience with natural gas and coal Full scale commercial PCC Demo US PCC Demo Germany 1 t/d 2 10 200 330 450 450 100 500 3000 ~3

  19. Slide 19: Next Steps for Coal Flue Gas Experience

    Next Steps for Coal Flue Gas Experience •100 tpd PCC pilot plant with E.ON Energie in Germany •500 tpd PCC demo plant in US (details announced later this year) Year 03 04 05 06 07 08 09 10 11 12 13 14 15 16 1 MTPD PCC Pilot Plant Experience from these plants can be applied to future Greenfield Proje

  20. Slide 20: MHI's Potential Scope in a CCS Project

    MHI’s Potential Scope in a CCS Project Steam Turbine FGD CO2 CO2 CO2 Boiler SCR EP Capture Compression Transport NOx Dust SOx CO2 ‹ Centrifugal Compressors ‹ Coal Fired Power Station ‹ FGD ‹ CO2 Capture Plant Absorber Stripper Cooling Tower Deep FGD Flue Gas Duct DCFS MHI Can Supply All Technology –

  21. Slide 21: Advantages of Post Combustion CO2 Capture

    Advantages of Post Combustion CO2 Capture ① Is applicable for the current, global PC fleet ② Offers high degree of flexibility – is adaptable and cost competitive with other technologies ③ Operation at atmospheric pressure – safe and does not require exotic materials ④ Produces highly purified CO2 –

  22. Slide 22: Strength of MHI in the emerging CCS industry

    Strength of MHI in the emerging CCS industry 9 Extensive PCC R&D History - >18 years 9 Ongoing and long term solvent development - >200 solvents 9 CO2 capture experience from natural gas boiler, natural gas turbine, natural gas steam reformer and coal fired boiler flue gas 9 Multiple commercial deli

  23. Slide 23: Thank You

    Further Information THANK YOU 23

Mitsubishi Heavy Industries — Scandinavian Renewable Energy Forum 2008 on 6ix