Auris Minerals Ltd. · ASX:AUR

Auris Minerals — Resource and Investment NL — Paydirt's Gold Conference 2014

20 slides from Auris Minerals's conference presentation, Apr 3, 2014

  1. Slide 1: An Emerging Western Australian Miner

    An Emerging Western Australian Miner With a dominant copper-gold exploration portfolio Resource and Investment NL ASX: RNI Paydirt’s Gold Conference Presentation 3 April 2014 1

  2. Slide 2: Competent Person's Statement and Forward-Looking Statements

    Competent Person’s Statement Information in this announcement relates to and fairly represents information and supporting documentation prepared and compiled by Albert Thamm BSc (Hons) MSc, who is a Corporate Member of the Australasian Institute of Mining and Metallurgy. There is information in this

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Executive Chairman: Capital Structure Miles Kennedy • 30 years’ corporate experience. Former Chairman of Share Price A cents 8.0 Sandfire Resources, Macraes Mining and Kimberley Shares on Issue1 M 338.8 Diamond Co Market Cap A$m 27.1 Executive Technical Director: Albert Thamm Cash

  4. Slide 4: A Profitable Near-Term Gold Producer

    A Profitable Near-Term Gold Producer … • Near-term production pathway: Low-cost and near-term development of the ~2Moz Grosvenor and Peak Hill gold projects, with high-recovery processing via existing Carbon-in-Leach plant, supplemented by new Heap Leach operations • Compelling financial model: Init

  5. Slide 5: With a Known ~2Moz Gold Inventory

    With a Known ~2Moz Gold Inventory … • JORC compliant gold resources of ~2Moz: The current resource base has clear potential to expand by extensional and step-out drilling of known deposits • Significant scope for near-mine discoveries: The district has proven gold mineralisation but is under-explore

  6. Slide 6: And Significant Exploration Potential

    … And Significant Exploration Potential • Dominant 1,866km2 holding in a proven mineralised province: RNI has consolidated six well-defined project areas in the Bryah Basin to build a dominant tenement package • Projects supported by historical geological data sets covering ~25 years of exploration

  7. Slide 7: The Near-Term Pathway to Gold Production

    The Near-Term Pathway to Gold Production • Independent feasibility studies confirm low-cost and near-term gold production pathway for the ~2Moz Grosvenor and Peak Hill gold projects • Studies confirm robust & sustainable returns (EBITDA ~$260m) over first 8 years, averaging 68koz with low cash opex

  8. Slide 8: Feasibility Studies – Key Outcomes

    Feasibility Studies – Key Outcomes • Parallel processing options including conventional CIL through RNI’s existing Grosvenor gold plant and HL processing of lower-grade material • Grosvenor CIL nameplate ~1Mtpa, project processing rate is ~1.4Mtpa over 8 years (CIL and HL) • First production schedul

  9. Slide 9: Heap Leach – Exceptional Metallurgical Results

    Heap Leach – Exceptional Metallurgical Results Lithology Recalculated Column Days Estimated column feed Recovery Completed Plant grade Recovery Sample g/t % # % Yarlarweelor Phase 1 Oxide, Transitional 0.50 94.1 28 85 Peak Hill 1 Transitional 1.88 91.4 39 86 Peak Hill 2 Oxide, Transitional 1.60 65.3

  10. Slide 10: Project Mining Plan: Years 1-8

    Project Mining Plan: Years 1-8 Processing Summary: First 5 years planned in detail - additional 3-5 years in study phase 10,974 Total Throughput (kt) Grade (g/t) 1.82 Overall Recovery (%) 85% Gold Produced (koz) 545 Summary of Production by Source Yarlarweelor (koz) 211 Toms (koz) 18 Callies (koz) 2

  11. Slide 11: Project Financial Model

    Project Financial Model - Conservative and Robust Material Financial Assumptions Assumed gold price (open-pit) A$1,450/oz to Dec 2015 then A$1,400/oz NPV discount rate 8% Estimated carried forward tax losses A$48m Estimated Financial Outcomes Life of mine EBITDA A$260m NPV A$103m 11

  12. Slide 12: Capital Costs

    Capital Costs Pre-Production Capital A$m Grosvenor CIL Capex 16.4 Pre-operating Owner’s Costs 18.6 Sub-total 35 Sustaining and Expansion Capital A$m Grosvenor HL 14.5 Peak Hill HL 8.6 Grosvenor Underground (Starlight) 31.5 Sustaining Capital Expenditure 12.5 Sub-total 67.1 12

  13. Slide 13: Grosvenor CIL Gold Plant

    Grosvenor CIL Gold Plant • 1Mtpa nameplate Grosvenor CIL gold processing plant - 100% owned by RNI • Low completion capex – Just ~$3.8m required to restart • Permitting processes almost complete , major approvals from WA Government received • Supporting infrastructure in place including camp, airfie

  14. Slide 14: Exploration Overview

    Exploration Overview • A dominant 1,866km2 regional portfolio in a known exploration hot spot • Six key consolidated project areas – all prospective for copper and gold • Pipeline of well-defined priority targets, including Forrest Gimp, Wodger, Big Billy, Orient, Horseshoe Lights East, Morck’s Well

  15. Slide 15: Bryah Basin Copper - 120km of VHMS Targets

    Bryah Basin Copper - 120km of VHMS Targets • RNI tenement package includes ~120 strike km of VHMS target horizons, highly prospective for copper 15

  16. Slide 16: Forrest Gimp – An Exciting Copper-Gold Discovery

    Forrest Gimp – An Exciting Copper-Gold Discovery • Copper-gold discovery of up to 5.4% Cu beneath gold rich cap • Open in all directions. Within a priority 8km VHMS trend • Based on re-evaluation of historical drilling. No previous Cu assays 16 • Geochemistry consistent with VHMS deposit

  17. Slide 17: The 12km Corridor of Riches – Priority Targets

    The 12km Corridor of Riches – Priority Targets • High-grade copper results up to 13.8% on an 8km geological VHMS trend stretching from Big Billy to Forrest Gimp. Anomalous base metal results encountered a further 4km north at Callies for a total 12km strike length • Priority drilling and exploration

  18. Slide 18: Bryah Basin – Strategic Exploration Proposition

    Bryah Basin – Strategic Exploration Proposition • Prospectivity of the Bryah Basin to host quality copper deposits is proven (DeGrussa, Horseshoe Lights, Horseshoe etc) • Corporate consolidation of tenement ownership is accelerating (SFR, IGO, TLM, VRX, ALY) • RNI is the dominant tenement holder and

  19. Slide 19: Appendix 1: Mineral Resources

    Appendix 1: Mineral Resources 19

  20. Slide 20: Contact

    CONTACT 34 Bagot Road, Subiaco WA 6008 PO Box 298, West Perth WA 6872 P +61 8 9489 9200 F +61 8 9489 9201 E [email protected] W rninl.com.au 20

Resource and Investment NL — Paydirt's Gold Conference 2014 on 6ix