Veer Energy & Infrastructure Limited · BSE:VEERENRGY

Veer Energy & Infrastructure — Investor Presentation (February 2015)

26 slides from Veer Energy & Infrastructure's investor presentation, February 2015

  1. Slide 1: Nature-al Direction to Energy

    NATURE-AL DIRECTION TO ENERGY ISO – 9001-2008 Certified Company

  2. Slide 2: Company Background

    COMPANY BACKGROUND  Veer Energy & Infrastructure Limited is in the area of renewable energy & infrastructure development company, headquartered in Mumbai, India.  Conceived in 2006 with just 20 people, Veer Energy is now a leading independent wind farm developer in India.  Veer Energy is listed o

  3. Slide 3: Achievements 2006-2007

    ACHIEVEMENTS  Formation of Veer Energy & Infrastructure and commencement of business. 2006  Started marketing of wind turbine simultaneously started identifying good wind potential sites across India.  Selected Kutch, Surajbari site in Gujarat as per the wind resource data. Started building 55 MW

  4. Slide 4: Achievements 2008-2009

    ACHIEVEMENTS  Successful commissioning of the SWL order. Commissioned 79 wind turbines in a record 75 days. 2008  Commissioned balance capacity and started marketing and selling of wind turbines.  Received order from SWL to develop infrastructure for 2.7 MW in Tamilnadu and successfully completed

  5. Slide 5: Achievements 2010-2011

    ACHIEVEMENTS  Company has successfully set up their own wind farm at Surajbari, Kutch up to 1.35 MW containing 6 WTG of SWL make 225 KW.  Company has successfully set up & marketed (sold) 2.55 MW containing 8 WTG of 225 KW SWL make & 1 WTG of 750 KW GWL make. 2010  Company has successfully set up

  6. Slide 6: Achievements 2012

    ACHIEVEMENTS  The Company has successfully set up 35 MW of Substation at Vinjalpur, Jamnagar, Gujarat.  The company acquired additional 5 MW of Power Evacuation permission from GETCO for our substation at Chandrodi, Kutch, Gujarat.  The company has also acquired lease land of 298.80 hectors from

  7. Slide 7: Achievements 2013

    ACHIEVEMENTS  Company has successfully completed the Foundation and Erection for 4.00 MW at Mota Gunda, Jamnagar.  Company has Completed Commissioning of 0.450 MW (0.225 Kw X 2 WTGs) of GWL Make for Accurate Industries Ltd at Mota Gunda.  Company has also Completed Commissioning of 1.70 MW (0.850

  8. Slide 8: Achievements 2014

    ACHIEVEMENTS  Company has successfully completed the Foundation and Erection work for 12.00 MW (1500 Kw X 8 WTGs of Suzlon Make) at Vinjalpur, Jamnagar.  Company has also Completed Commissioning of 4.00 MW (2000 Kw X 2 WTGs of GAMESA Make) at Mota Gunda. 2014  Out of 79.80 MW at Ludarva, Jaisalme

  9. Slide 9: Land & Micrositing

    Land & Micrositing  Identifying suitable wind rich sites and procuring the same, forms the base of the wind farm.  The policy of Veer Energy has always been to work closely with the local community throughout the planning, construction, and operation of Veer Energy’s wind farms.  In the course of

  10. Slide 10: Civil Foundation

    Civil Foundation  The location will be taken up for construction of foundation. There are two types of foundations, one is for tubular tower and the other one is for structural tower i.e. Lattice tower. Normally, tubular tower foundations are pit type foundation where the pit of about three meters

  11. Slide 11: Erection & Commissioning

    Erection & Commissioning  The wind turbines are erected with utmost care with help of highly skilled engineers and labors.  A combination of high capacity cranes along with supporting cranes are used in erection of the wind turbines.  Structures and components of wind turbines need to sufficientl

  12. Slide 12: Electrical D.P. Yard & Transmission Line

    Electrical D.P. Yard & Transmission Line  The power generated from the wind turbines is passed through a network of transformers, isolators, meters and then fed to the transmission lines which transmits the power upto the on-site sub station.  Electrical connections between the turbines are made v

  13. Slide 13: Operation & Maintenance

    Operation & Maintenance  At Veer Energy, service and maintenance are just as important to us as choosing the right wind turbines & sites. Thus, we want you to know that we view the operation & maintenance of the wind farm as the beginning of a close partnership that will last the next 20-25 years,

  14. Slide 14: Turn Key Solution

    TURN KEY SOLUTION Identification of site with good wind resource Procurement of Land Permission from Transmission Co. Agreement with WTGs for power evacuation at electrical Manufacturers for supply of WTGs at Sub-station Site Micrositing Civil Works (Foundation, Control Permission u/s. 89(A) for Des

  15. Slide 15: Windpark - Location

    WINDPARK - LOCATION  CHANDRODI WINDPARK (60 MW) SURAJBARI KUTCH, GUJARAT Co-ordinate: Latitude: 23.3342⁰ N Longitude: 70.6372⁰ E  MOTA GUNDA WINDPARK (45.60 MW) BHANVAD JAMNAGAR, GUJARAT Co-ordinate: Latitude: 647264° E Longitude: 2456680° N  VINJALPUR WINDPARK (35 MW) KHAMBHALIYA JAMNAGAR, GUJAR

  16. Slide 16: Chandrodi Windpark – Project Info

    CHANDRODI WINDPARK – PROJECT INFO PROJECT INFORMATION SUBSTATION DETAILS Wind farm Capacity: 60 MW Rating: 66 /33 KV Start of Construction: Apr 2007 Capacity: 30 MVA x 2 nos. Commissioning: Mar 2008 Commissioning: Oct 2007 Operating Life: 20 years Grid Operator: GETCO Power Utility: GUVNL / Torrent

  17. Slide 17: Mota Gunda Windpark – Project Info

    MOTA GUNDA WINDPARK – PROJECT INFO PROJECT INFORMATION SUBSTATION DETAILS Wind farm Capacity: 45.60 MW Rating: 66 /33 KV Start of Construction: Dec 2010 Capacity: 30 MVA x 2 nos. Commissioning: Mar 2011 Commissioning: Mar 2011 Operating Life: 20 years Grid Operator: GETCO Power Utility: GUVNL

  18. Slide 18: Vinjalpur Windpark – Project Info

    VINJALPUR WINDPARK – PROJECT INFO PROJECT INFORMATION SUBSTATION DETAILS Wind farm Capacity: 35.00 MW Rating: 66 /33 KV Start of Construction: Dec 2011 Capacity: 30 MVA x 2 nos. Commissioning: Mar 2012 Commissioning: Mar 2012 Operating Life: 20 years Grid Operator: GETCO Power Utility: GUVNL

  19. Slide 19: Kundhada Windpark – Project Info

    KUNDHADA WINDPARK – PROJECT INFO PROJECT INFORMATION SUBSTATION DETAILS Wind farm Capacity: 30.00 MW Rating: 66 /33 KV Start of Construction: Jan 2012 Capacity: 30 MVA Commissioning: Jun 2012 Commissioning: Jun 2012 Operating Life: 20 years Grid Operator: GETCO Power Utility: GUVNL

  20. Slide 20: Ludarva Windpark – Project Info

    LUDARVA WINDPARK – PROJECT INFO PROJECT INFORMATION SUBSTATION DETAILS Wind farm Capacity: 100.00 MW Rating: 66 /33 KV Start of Construction: Oct 2011 Capacity: 79.80 MVA Commissioning: Mar 2012 Commissioning: Mar 2012 Operating Life: 20 years Grid Operator: RVVNL Power Utility: RVVNL

  21. Slide 21: Windpark – Wind Turbines

    WINDPARK – WIND TURBINES Existing Wind Turbines: Make: Southern Wind Farms Make: Elecon Engg. Co. Ltd Make: Gamesa Wind Turbines Pvt. Ltd. Ltd. Model: T600-48 Model: G58 Model: GWL 225 Rated Power: 600 KW Rated Power: 850 KW Rated Power: 225/40 KW Rotor Diameter: 48 m Rotor Diameter: 58 m Rotor Diam

  22. Slide 22: Windpark – Wind Turbines

    WINDPARK – WIND TURBINES Existing Wind Turbines: Make: Suzlon Energy Ltd. Make: Suzlon Energy Ltd. Make: Gamesa Wind Turbines Pvt. Ltd. Model: S 88 Model: S 82 Model: G 97 Rated Power: 2100 KW Rated Power: 1500 KW Rated Power: 2000 KW Rotor Diameter: 88 m Rotor Diameter: 82 m Rotor Diameter: 97 m Hu

  23. Slide 23: Past Performance and Projections

    Past Performance and Projections Gujarat Rajasthan Tamilnadu Total Installation Year (in MW) (in MW) (in MW) (in MW) 2007-08 25.58 0.00 0.00 25.58 2008-09 18.85 0.00 2.70 21.55 2009-10 6.32 0.00 0.00 6.32 2010-11 30.60 0.00 0.00 30.60 2011-12 29.15 20.40 0.00 69.15 2012-13 5.00 8.50 0.00 35.06 2013-

  24. Slide 24: Windpark – Clientele

    WINDPARK – CLIENTELE Existing Customers: 1. Gamesa Wind Turbines Pvt. Ltd – 124 Nos.(G58 – 850 KW) 2. Suzlon Energy Ltd – 12 Nos. (S82 – 1500 KW) 3. Indian Renewable Energy Foundation (IREF – Reliance ADAG) – 75 nos. (GWL 225 KW) 4. Mudra Online Technologies – 2nos. (GWL 225 KW) 5. Kidstuff Promotio

  25. Slide 25: Organisational Structure

    ORGANISATIONAL STRUCTURE Board of Directors Managing Turector hiet Financial Bee eae company kinecutive knecutive Ifficer esa Secretary Director Director Executive Business Development Aresictant Company | Assistant Manager Project Manager (Finance) /MLR. Scorctary Manager Land Acquisition Project I

  26. Slide 26: Management Team

    MANAGEMENT TEAM The Board of Directors of the Company, comprises of the following following:: 1. Mr. Yogesh M. Shah – Chairman & Managing Director Mr. 2. Mr.. Prakashchandra C. Shah – Executive Director Mr 3. Mr.. Nilay P. Shah – Executive Director Mr 4. Ms.. Nisha B. Shah - Independent Director Ms