Rokmaster Resources Corp. · TSXV:RKR
Rokmaster Resources — Investor Presentation (December 2022)
32 slides from Rokmaster Resources's investor presentation, December 2022
Slide 1: Update on the Gold-Polymetallic Revel Ridge Project
ROKMASTER RESOURCES CORP. TSX.V: RKR OTCQB: RKMSF FSE: 1RR1 Update on the Gold – Polymetallic REVEL RIDGE PROJECT “B.C’s largest undeveloped high-grade precious & polymetallic deposits” December 2022 J www.rokmaster.com
Slide 2: Cautionary Statement
2 Cautionary Statement This presentation contains “forward-looking information” within the meaning of applicable Canadian securities regulations and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking i
Slide 3: The Team
3 The Team John Mirko President, CEO & Director Michael (“Mike”) Cowin Chairman & Director Adam Pankratz, MBA, MA Director Dennis Cojuco CFO and Corporate Secretary Connor Malec VP of Exploration Mike Kordysz VP of Business Development and Strategy James (“Jim”) Oliver, Ph.D., P. Geo. Geological Con
Slide 4: Share Structure
4 Share Structure Share Information: Trading Symbols: Issued and Outstanding 144,695,023 RKR (TSX.V) Warrants 37,887,812 RKMSF (OTCQB) Stock Options 11,430,000 1RR1 (Frankfurt) Broker Warrants / Options 5,007,421 Contact: Share Ownership: General: • Insiders, family & close associates ~ 30% Email: i
Slide 5: Revel Ridge Project – 14,715 Ha
5 Revel Ridge Project – 14,715 Ha • 40 km north of Revelstoke with year- round road access • >3 km of operational underground workings • 41,000 m of historic diamond drilling in 315 holes, pre RKR • Mining equipment, underground & surface facilities, 40-person camp, rail load out • Surface drilling
Slide 6: Geology and Mineralization
6 Geology and Mineralization • RRMZ (Main Zone) is a remarkably continuous, large, tabular, structurally controlled, orogenic gold system. • RRMZ averages 6-8 g/t AuEq over 2.5 m True Width • RRYZ (Yellowjacket Zone) stacked subparallel carbonate hosted Ag-Zn-Pb zones. • RRYZ averages 60 g/t Ag + 12
Slide 7: Geology and Mineralization
7 Geology and Mineralization • RRMZ has been drill-tested for 3.5 km, with the deformation zone present in every drillhole • Geological mapping and geochemistry suggests the structure is approximately 6.0 km in strike length
Slide 8: Main Zone (RRMZ) Style Mineralization
8 Main Zone (RRMZ) Style Mineralization DDH RR20-11: 288.6 m to 294.77 m 288.64 – 290.47 • 1.83 m @ 9.54 g/t Au, 75.66 g/t Ag, 3.81% Pb, 10.91% Zn (17.30 g/t AuEq) 288.64 – 292.56 • 3.92 m @ 5.28 g/t Au, 43.22 g/t Ag, 1.95% Pb, 6.96% Zn (9.97 g/t AuEq) 286.40 – 294.77 • 8.37 m @ 2.76 g/t Au, 23.35 g
Slide 9: Main Zone (RRMZ) Style Mineralization
9 Main Zone (RRMZ) Style Mineralization ▪ Ag – Zn hosted by deformed marble. ▪ Predictable deformational style, recumbent folds. ▪ Target structural periodicity. ▪ Target million tonne Ag – Zn shapes.
Slide 10: Yellowjacket Ag-Zn Expansion (July 16, 2021 NR)
10 Yellowjacket Ag-Zn Expansion (July 16, 2021 NR) • DDH RR21-41: 1,093 g/t AgEq or 14.39 g/t AuEq over 3.60 m. • DDH RR21-43: 471.9 g/t AgEq or 6.21 g/t AuEq over 7.08 m. • DDH RR21-44: 520.5 g/t Ag or 6.85 g/t Au over 2.70 m. • DDH RR21-47: 426.4 g/t AgEq or 5.61 g/t AuEq over 5.60 m.
Slide 11: Merits Of The Project
11 Merits Of The Project Gold Equivalent Mineral Resource Estimate: Main, Hanging Wall, Foot Wall, NW Extension and Yellowjacket Zones: Measured & Indicated (M&I): 6,730,000 t / 1,357,800 ounces AuEq @ 6.27 g/t AuEq * Inferred (Inf): 6,000,000 t / 1,220,400 ounces AuEq @ 6.33 g/t AuEq * • Orogenic R
Slide 12: Resources – November 17, 2021
12 Measured, Indicated and Inferred Gold Equivalent Resources – November 17, 2021 *see footnotes 1-6
Slide 13: Footnote 1 - 6
13 Footnote 1 - 6 (1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio- political, marketing, or other relevant issues. (2) The Inferr
Slide 14: 2021 historic PEA Highlights
14 2021 historic PEA Highlights (using historic resource and metallurgy) ▪ High-grade underground mine - Mill-feed averaging $300/T NSR value (diluted) - Based only on all drilling up to 2012, no optimization ▪ Years 1-4 mill-feed will average $400/T NSR (diluted) ▪ After-tax NPV5.0% of C$423M and 2
Slide 15: 2022 Groundbreaking Metallurgical Solution
15 2022 Groundbreaking Metallurgical Solution ▪ For more than two years, Rokmaster has undertaken numerous metallurgical tests to advance the flowsheet from an initial overall gold recovery of 74.3% ▪ Recent metallurgical test work and repeatable Locked Cycle Tests (“LCT”) provided an updated flowsh
Slide 16: Development of Free Gold: Gold Zonation Late-Stage Quartz Gold Veins
16 Development of Free Gold: Gold Zonation Late-Stage Quartz Gold Veins at Deeper RRMZ ▪ DDH RR21-40 cored a 4 m intercept, 460 m vertically below the 830 m level of Main Zone with: 11.55 g/t Au and 0.021 % As over a 3 m interval ▪ Decrease in As content two orders of magnitude below deposit average
Slide 17: Fosterville compared to Revel Ridge at same scale
17 Fosterville compared to Revel Ridge at same scale
Slide 18: Drilling Km Scale Geochem – Structural Trend
18 Drilling Km Scale Geochem – Structural Trend
Slide 19: 2022 Drilling: RRMZ - RRYZ
19 2022 Drilling: RRMZ - RRYZ Targeting Resource Expansion: ▪ Expand RRMZ 925 m to the southeast ▪ Expand RRMZ 290 m to the northwest; RRYZ 115 m to NW ▪ 2022 Drilling: 8,049m NQ surface drilling in 25 broadly spaced DDH’s ▪ Average drillhole spacing: ~120 m ▪ Most (18) of the 2022 DDH’s are outside
Slide 20: 2022 Drilling: RRMZ - RRYZ
2022 Drilling: RRMZ - RRYZ SE Sse Perel Ridge Project: Figure 2 Longitudinal a BR R50 rer 2022 viting with 2021 Resource Estimate Volume RORMASTER Resources Gorm |Soptombor 26, 2022 Looking Southwest (236° Azimuth) esoures Estimate Blogk Medel* 200M tdeasured anc indicated Mineral Resource: 1.36 mil
Slide 21: 2022 Drilling: RRMZ – RRYZ NW Expansion
21 2022 Drilling: RRMZ – RRYZ NW Expansion
Slide 22: Cutting Channel Samples of Main Zone
22 Cutting Channel Samples of Main Zone
Slide 23: Corporate and Exploration Highlights 2020-2022
23 Corporate and Exploration Highlights 2020-2022 ▪ 2020-2021 Completed first pass UG program 16,395 m, 75 - 80% hits, expansion of RRMZ ▪ Identify free gold; quantum change in metal? ▪ NW expansion of RRYZ. ▪ 2021 Surface drilling 10,753 m, test new Au volumes, > 5 km of RRMZ trend. ▪ 2021 UG metal
Slide 24: Jack Denny and mascot at Revel Ridge
24 Jack Denny and mascot at Revel Ridge
Slide 25: 2022 Work Plan and Budget
25 2022 Work Plan and Budget 2nd Option Payment (paid): $4,000,000 >27,000 m surface and underground diamond drilling: $7,500,000 Mine Permitting, Variability $500,000 Sampling & Metallurgy: Update PEA, Mine & mill $500,000 engineering: Revelstoke rail concentrate load-out facility Contingency $1,00
Slide 26: Corporate Objectives, 2022-2023
26 Corporate Objectives, 2022-2023 ▪ Update PEA by Q/1 2023 ▪ Grow interest of select investors ▪ Spinout Zinc – Copper Newco, trading, Q/1 2023 ▪ Grow deposit size to > 3 M oz AuEq MRE update, Q/1 2023 ▪ Continue drill testing RRMZ at depth, NW, and SE to facilitate further MRE growth into 2023 ▪ C
Slide 27: Revel Ridge: the Right Targets = Keep Exploring
27 Revel Ridge: the Right Targets = Keep Exploring (41,980 m drilled in 2020-2022 and growing)
Slide 28: RKR Tier One Pipeline
28 RKR Tier One Pipeline ▪ PEA (Update) Stage: Orogenic Au - Revel Ridge: ~2.5 Million oz AuEq, in all categories - Including 10’s km exploration targets ▪ Advanced Prospect: CRD – Duncan Lake Zn – Ag, proven metallogenic belt: ~30 Million tonne target ▪ Drill Ready Prospect: Sediment hosted Cu/Ag:
Slide 29: RKR Project Pipeline: Duncan Lake CRD Ag/Zn
29 RKR Project Pipeline: Duncan Lake CRD Ag/Zn ▪ Major metallogenic belt, dozens mines & occurrences, Kootenay Arc Zn-Pb-Ag ▪ Duncan Lake – President zonation Zn to Ag
Slide 30: RKR & Ag/Zn Duncan Regional Zn-Ag Trend
30 RKR & Ag/Zn Duncan > 10 km Regional Zn - Ag Trend ▪ 5 major Zn - Ag occurrences on RKR property ▪ Road access, excellent infrastructure ▪ Drill ready Tier 1 targets
Slide 31: RKR & Silver – Zinc: Duncan North – President Zone
31 RKR & Silver – Zinc: Duncan North – President Zone C89-5: 7.1% Zn and 4.6% Pb over 8.0 m C91-7:11.4 % Zn and 0.8% Pb over 4.8 m C97-12: 6.2% Zn and 6.3% Pb over 7.5 m 2022: Three drillholes totalling 681.2 metres D22-02: 2.06% Zn, 2.56% Pb, and 8.38 g/t Ag over 20.85 m
Slide 32: RKR Project Pipeline: Big Copper Sediment Hosted Cu-Ag
32 RKR Project Pipeline: Big Copper Sediment Hosted Cu - Ag ▪ Cu demand: price escalation $4.50/lb ▪ Cu supply: exploration escalation ▪ Known occurrence: 4.5 km Cu trend, Cominco drilling, 1965: • 4.4 m of 3.30% Cu, within 29.7 m of 1.4% Cu (no Ag assays) • 4.1 m of 1.20% Cu (no Ag assays) ➢ Permit
Rokmaster Resources — Investor Presentation (December 2022) on 6ix