Sundance Energy Inc

Sundance Energy — Sundance Energy Australia — Q1 2015 Earnings Presentation

16 slides from Sundance Energy's earnings presentation, May 1, 2015

  1. Slide 1: Q1 2015 Earnings Presentation

    Q1 2015 Earnings Presentation 30 April 2015

  2. Slide 2: Disclaimers

    Disclaimers This presentation has been prepared by Sundance Energy Australia Limited (ABN 76 112 202 883). Summary information The following disclaimer applies to this document and any information contained in it (the “Information”). The Information in this presentation is of general background and

  3. Slide 3: Disclaimers (cont'd)

    Disclaimers (cont’d) Disclaimer Except as required by law, no representation or warranty (express or implied) is made as the fairness, accuracy, completeness, reliability or correctness of the Information, opinions and conclusions, or as to the reasonableness of any assumption contained in this docu

  4. Slide 4: Company overview: Superior performance through commodity cycles

    Company overview Superior performance through commodity cycles Note: Above based on Company filings, press releases and 1 January 2015 NSAI reserve report. Market capitalization and enterprise value shown as of 29 April 2015, based on debt of $144mm and cash of $13mm; Production numbers represent 1Q

  5. Slide 5: Average production of 9,581 boepd in the first quarter of 2015

    Average production of 9,581 boepd (net of royalties) in the first quarter of 2015 An overall increase of 7% from Q4 2014 Generated revenue of $28.7MM Adjusted EBITDAX of $22.0MM and EBITDAX margin of 77% by improving upon top-tier cost structure Decreased 2014 field costs of $9.12 / Boe (top quartil

  6. Slide 6: Increased production to 9,581 Boe/d, net of royalties

    Increased production to 9,581 Boe/d, net of royalties, an increase of 649 Boe/d (7 percent) compared to 4Q14 2015 Full Year Production Guidance of 7,850 Boe/d to 8,500 Boe/d Generated $28.7MM in revenue Realized oil price of $44.55/bbl and natural gas price of $2.83/mcf Production and Revenue Trend

  7. Slide 7: Adjusted EBITDAX margin remained high despite lower commodity prices

    Despite lower commodity prices during the quarter, Adjusted EBITDAX Margin remained high (76.7%) as compared to full year 2014 (79.1%) Total field costs have decreased from $9.12 / Boe in 2014 to $7.63 / Boe in Q1 2015. Comprised of: Lease operating costs declined to $5.17/Boe in Q1 2015 from $6.02

  8. Slide 8: Pro forma cash flow and liquidity; hedging

    Pro forma cash flow and liquidity Hedging Oil Derivative Contracts Gas Derivative Contracts 2015E Weighted Average Weighted Average millions Bbls Floor Ceiling Mcf Floor Ceiling Consensus EBITDAX 100.8 1H 2015 92,000 82.86 92.08 60,000 4.14 4.14 Cash interest (10.2) 2H 2015 222,000 67.47 82.60 120,0

  9. Slide 9: Core Eagle Ford assets drive growth through cycles

    Core Eagle Ford assets drive growth through cycles ~33,000 net mineral acres targeting the Eagle Ford ~38,500 net acre position targeting the Eagle Ford and Georgetown formations ~33,000 net acres targeting the Eagle Ford formation ~14,000 net acres in McMullen county and ~19,000 net acres in Dimmit

  10. Slide 10: Asset overview: Eagle Ford – McMullen Area

    N 10 miles Asset overview Eagle Ford – McMullen Area McMullen Area Eagle Ford well control Source: Company filings and press releases Based on NSAI 2P type curve as of 31 December 2014 LEGEND SEA Acreage Cabot Eagle Ford Wells Chesapeake Eagle Ford Wells EOG Eagle Ford Wells Marathon Eagle Ford Well

  11. Slide 11: Asset overview (cont'd): Eagle Ford – Dimmit

    Asset overview (cont’d) Eagle Ford – Dimmit Dimmit Eagle Ford well control Net acres 19,000 Well cost $5.0 - $7.5 million EUR (mboe) 483(1) Estimated oil 55% - 60% LOE per boe $5.00 - $7.00 Well economics Source: Company filings and press releases Based on NSAI 2P type curve as of 31 December 2014

  12. Slide 12: Eagle Ford portfolio return sensitivities

    Eagle Ford portfolio return sensitivities Average Netherland Sewell & Associates 2P type curve(1) McMullen County Eagle Ford NSAI 2P Type Curve 347.5 mbo, 57.5 mbngl, 624.5 mcf 6,902’ average lateral length Dimmit County Eagle Ford NSAI 2P Type Curve 268.7 mbo, 76.6 mbngl, 827.3 mcf 6,059’ average l

  13. Slide 13: Maximize balance sheet flexibility

    Maximize balance sheet flexibility Low leverage profile (<1.1x debt to EBITDA at 31 March 2015) Limited drilling obligations to hold Eagle Ford acreage (1 net remaining well commitment to hold Eagle Ford acreage in 2015) No current service commitments (all rigs were released by end of Q1 2015) Maxim

  14. Slide 14: www.sundanceenergy.net

    www.sundanceenergy.net

  15. Slide 15: Management team

    Management team Eric McCrady, Managing Director & CEO Eric was appointed CEO in April 2011 and Managing Director of the Board in November 2011. He served as CFO from June 2010 until becoming CEO. Eric has over 15 years’ of entrepreneurial experience with an extensive track record in investment evalu

  16. Slide 16: Reserves definitions and notes

    Operating costs used in this report are based on operating expense records of Sundance. Capital costs used in this report were provided by Sundance and are based on authorizations for expenditure and actual costs from recent activity. Future net revenue is after deductions for Sundance's share of pr

Sundance Energy Australia — Q1 2015 Earnings Presentation on 6ix