Elia Group SA/NV · EURONEXT:ELI
Elia Group SA/NV — Investor Presentation (June 2013)
21 slides from Elia Group SA/NV's investor presentation, Jun 24, 2013
Slide 1: Experts Working Group Meeting n°4
Experts Working Group Meeting n°4 A.S. provided by distributed resources – 2014 & 2015 24/06/2013 Elia ENMAN 24/06/2013 Experts WG - meeting n° 4
Slide 2: Agenda
Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont
Slide 3: Agenda
Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont
Slide 4: Agenda
Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont
Slide 5: Main events since last Expert WG
Main events since last Expert WG 4th Expert Working Group meeting 24/06/2013 Elia ENMAN
Slide 6: The pathway to contractualization…
The pathway to contractualization… May 23rd - ATRIAS meeting consensus between DSOs and ELIA on principles and pragmatic approach for implementing R3 DP in 2014 Standard contract DSO-BSP needed , regional regulatory approval required Principle of net load reduction maintained Prequalificatio
Slide 7: The pathway to contractualization…(ctn’d)
The pathway to contractualization…(ctn’d) Meanwhile … Synergrid prepared draft version BSP-DSO contract for review Meeting DSO & ELIA on contract DSO-BSP June 21st – Proposal contract BSP-DSO sent to regulators ELIA prepared ELIA-BSP contract Next steps: June 27th : TF Balancing June 28t
Slide 8: Agenda
Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont
Slide 9: Proposal Timing Tendering R3 DP
Proposal Timing Communication DSO prequalification Tendering R3 DP decision 20/9/2013 Design Freeze Communication 17/4/2013 selection BSP 11/10/2013 Contract notice R3 DP Tendering R3 DP first R3 DP ready to start 7/6/2013 Results 1/12/2013 23/9/2013 R3 DP tendering starts Official start R3 DP 1/7/2
Slide 10: Agenda
Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont
Slide 11: Prequalification procedure Contact Details
Prequalification procedure Contact Details System Grid Operator E-mail Address Contact Person (DSO/TSO) Lieven Degroote Eandis (DSO) [email protected] Gunther Schoovaerts Elia (TSO) [email protected] Pauline Ottoy Infrax (DSO) [email protected] Wouter Motmans Ores (DSO
Slide 12: Prequalification procedure TSO connected
Prequalification procedure TSO connected How Fill in the template provided at the start of the tendering procedure per Access Point participating with: o Required information o Signature Dynamic Grid User o Signature Candidate DPP(=BSP) Send it to [email protected]; When All requests
Slide 13: Prequalification TSO connect: Status and link selection (proposal)
Prequalification TSO connect: Status and link selection (proposal) The BSP will receive from Elia/DSO a status for each EAN requested. Possible statuses are green, orange or red: o Green = EAN can participate in the tendering and the selection will only be dependent on economical criteria; o Ora
Slide 14: Template prequalification TSO
Template prequalification TSO Template Prequalification TSO Personal Data Grid User Name Grid User Adress Grid User Telephone Number Grid User E-mail Grid User EAN Code of meter Contractual Data Name BSP Number of offered flexible MW R3 DP at EAN Main focus of EAN (production/load) Period (Peak/off-
Slide 15: Template prequalification TSO
Template prequalification TSO Contact details BSP Name BSP Adress BSP Telephone Number BSP To be signed by Dynamic Grid User: E-mail BSP • “I hereby authorize the DPP to enter into a Contract with Elia for the provision of the R3-DP Service using the Access Point Concerned” • “I hereby swear that al
Slide 16: Activation procedure: principles TSO grid
Activation procedure: principles TSO grid Elia demands the activation from BSP by XML protocol; When Elia does activation of BSP : o Elia notifies each implicated BRP: “Maximum possible MW activated in perimeter” within 15 min by mail; Elia informs other parties on request; 24/06/2013
Slide 17: Activation procedure: principles DSO grid
Activation procedure: principles DSO grid Elia receives from DSO link EAN –BRP monthly (aggregated per BRP per BSP or not); Elia demands the activation from BSP by XML protocol; When Elia does activation of BSP : o Elia notifies each implicated BRP: “Maximum possible MW activated in perimeter”
Slide 18: Agenda
Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont
Slide 19: Contract Elia-BSP
Contract Elia-BSP Contract Notice launched 07/06 Contract was drafted during the months May-June; Draft version is now in Legal revision; Final version will be sent out with tendering documents (July 1st, 2013) Procedure for Acceptance: Conditions that must be fulfilled to participate in
Slide 20: Contract DSO-BSP
Contract DSO-BSP Explained by DSO representatives 24/06/2013
Slide 21: Final status ARP contract Art. 11.2
Final status ARP contract Art. 11.2 Presented by Isabelle Gerkens 24/06/2013