Cora Gold Ltd. · LSE:CORA

Cora Gold — Investor Presentation (April 2020)

23 slides from Cora Gold's investor presentation, April 2020

  1. Slide 1: Q2 2020 Corporate Presentation

    Q2 2020 CORPORATE PRESENTATION EMERGING WEST AFRICAN GOLD DEVELOPER

  2. Slide 2: Disclaimer

    DISCLAIMER The information being released by the Cora Gold Limited (the "Company") today & attached to the RNS (the “Materials”) are being released to provide additional information with respect to the business of the Company. The Materials are not intended to form, & shall not be treated as, the ba

  3. Slide 3: Snapshot

    SNAPSHOT LARGE FOOTPRINT SIGNIFICANT DISCOVERY PROVEN TEAM 1,200km2 across known gold belts in Sanankoro Gold Discovery which has Track record of discovery & depth of Mali & Senegal standalone mine potential experience in Africa IMPRESSIVE REGISTER COMPARATIVELY UNDERVALUED Supportive, high calibre

  4. Slide 4: A Team to Deliver

    A TEAM TO DELIVER Track record of discovery & development in Africa Ed Bowie, Chairman David Pelham, Non-Executive Director • +23 years’ experience within the wider natural resources industry • A mineral geologist with +35 years global exploration experience • started his career with SAMAX Gold in T

  5. Slide 5: Project Portfolio; located amongst multiple operational mines

    PROJECT PORTFOLIO; located amongst multiple operational mines Portfolio of prospective gold assets across Mali & Senegal KENIEBA WINDOW, WEST MALI YANFOLILA BELT, SOUTH MALI Corporate Presentation Q2 2020 4

  6. Slide 6: Sanankoro Project Area

    SANANKORO SCOPING STUDY SANANKORO PROJECT AREA KEY FACTS Location Yanfolila Gold Belt, Southern Mali Project Area 5 contiguous permits encompassing c.341 sq km Extensive work by Randgold Resources & Gold Fields mid- Previous Work 2000s & 2012 15km long mineralised structure with gold oxide Mineralis

  7. Slide 7: Scoping Study Highlights

    SANANKORO SCOPING STUDY SCOPING STUDY HIGHLIGHTS At US$1,400 Gold Price, a 1.5mtpa Heap Leach Mine delivers: (published Q1 2020) 84% Pre-production capex Internal Rate of Return (IRR) US$20.6m Avg Annual Free Cash AISC (US$/oz) Flow US$19.3m US$942 Avg Annual Production Payback period of less than 1

  8. Slide 8: Scoping Study Overview

    SANANKORO SCOPING STUDY SCOPING STUDY OVERVIEW 1.5Mtpa Heap Leach (US$1,400) Ore Mined (Mt) 4.2 Strip ratio (waste:ore) 5.9 Grade (g/t) 1.5 Mined gold (Ozs) 197,753 Produced Gold (Ozs) 138,427 Recovery (%) 70 Avg Production/year (Ozs) 45,632 Avg AISC/year (US$/oz) 942 Avg Free Cash Flow/year (US$m)

  9. Slide 9: Sanankoro Scoping Study: Technical

    SANANKORO SCOPING STUDY SANANKORO SCOPING STUDY: TECHNICAL MINING PROCESSING Heap leach favoured over CIL in trade off due to reduced • Predominantly free digging oxides capex • Limited drill & blast will be required • Would be reviewed with resource growth 1.5Mtpa favoured as optimum plant size wit

  10. Slide 10: Mineral Resource Estimate

    SANANKORO SCOPING STUDY MINERAL RESOURCE ESTIMATE MRE was completed by SRK & was announced 5th December 2019 • Maiden Resource on the Project • Focus on Oxides • Less than 25% of the 40 linear km mineralisation drilled to date • SRK defined exploration target of 1-2Moz gold to a depth of 100m Minera

  11. Slide 11: 2019 Drill Results - Sanankoro

    SANANKORO EXPLORATION 2019 DRILL RESULTS - SANANKORO Results from the Q4 2019 & Q1 2020 drill programme have identified significant scope to extend resources both at depth and along strike Results confirm continuous oxide gold mineralisation of potentially economic grades & widths HIGHLIGHTS of 2019

  12. Slide 12: Sanankoro: Selin

    SANANKORO EXPLORATION SANANKORO: SELIN Presence of oxide gold mineralisation of potentially economic grades & widths confirmed across prospect Over 3km of known strike & open in both directions & at depth Oxide starter pits identified Corporate Presentation Q2 2020 11

  13. Slide 13: Yanfolila Project Area

    ADDITIONAL PROJECTS YANFOLILA PROJECT AREA KEY FACTS Location Yanfolila Gold Belt, Southern Mali Project Area Four permits encompassing 450 sq km Focus primarily on the Kouroudian & Woyoni prospects Targets within the Tekeledougou Permit • 56m @ 2.2 g/t Au Tekeledougou • 17m @ 6.8 g/t Au Drill Resul

  14. Slide 14: Kenieba Window

    ADDITIONAL PROJECTS KENIEBA WINDOW KEY FACTS c.6.5 km southwest of Anglogold-Ashanti Sadiola gold Location mine • Four permits encompassing 387 sq km within the Kenieba Window • 3 contiguous permits in western Mali Project Area • Drilling commenced at Madina Foulbe with 650m of RC drilling already c

  15. Slide 15: Mali & Senegal

    ADDITIONAL PROJECTS MALI & SENEGAL AT A GLANCE KEY FACTS World class gold regions in West Africa • The Yanfolila Gold Belt (south Mali) • The Kedougou-Kenieba Inlier gold belt (known as the ‘Kenieba • Established, transparent, & reliable mining Window’) (west Mali/east Senegal) codes • Favourable to

  16. Slide 16: Community Development

    COMMUNITY DEVELOPMENT Sanankoro Project Area: Cora works with local communities, contributing to their development by creating aid strategies including: Establishing a kitchen garden creating fresh produce for sale & consumption Providing equipment for a health centre & cleaning equipment for the vi

  17. Slide 17: Corporate

    CORPORATE AT A GLANCE: SIGNIFICANT SHAREHOLDERS Market Cap GBP £9.52 million (as of 22.04.20) Brookstone Business** 27.85% Share Price 5.20p (22.04.20) Lord Farmer (Red Kite founder) 13.42% 52 Week Range 2.7p – 10p SP Angel Corporate Hummingbird Resources (plus subsidiary 12.42% Nomad company) Finan

  18. Slide 18: Peer Comparisons

    PEER COMPARISONS Significantly undervalued in comparison to peers 450 90 Capex, 390 IRR, 84 400 80 350 Capex, 328 70 300 IRR, 62 60 125.6 103.6 MCap, 263 IRR, 55 250 50 US$m Capex, 216 % Capex, 186 IRR, 44 263.3 97 200 40 IRR, 33 150 MCap, 126 30 80 MCap, 97 IRR, 24 100 20 70 Capex, 45 Capex, 23 10

  19. Slide 19: Investment Case

    INVESTMENT CASE Broad portfolio of gold projects with multiple, high potential, drill ready gold targets in two world class locations Sanankoro Scoping Study: 84% IRR at a US$1,400 Gold Price Large footprint with 1,200 sq km land across known gold belts and several tens of kilometres of structure la

  20. Slide 20: Appendix

    APPENDIX

  21. Slide 21: Sanankoro Exploration

    SANANKORO EXPLORATION SANANKORO EXPLORATION Identified multiple gold zones & significant confidence in future trajectory of the project • Extensive work programmes completed on time & within budget • Focus on the deep oxide ore potential with the sulphide potential barely touched upon • Pit constrai

  22. Slide 22: Sanankoro: Zone A

    APPENDIX SANANKORO: ZONE A 650m STRIKE LENGTH Drilling indicated continuation of broad zones of shallow, higher-grade mineralisation Results to be used to identify higher grade potential starter pits for future development Corporate Presentation Q2 2020 21

  23. Slide 23: Bert Monro, CEO contact details

    Bert Monro, CEO +44 (0) 20 3239 0010 [email protected] www.coragold.com @coragold Corporate Presentation Q2 2020 22

Cora Gold — Investor Presentation (April 2020) on 6ix