PT ABM Investama Tbk · IDX:ABMM

PT ABM Investama Tbk — J.P. Morgan Emerging Markets Credit Conference 2019

31 slides from PT ABM Investama Tbk's conference presentation, Sep 24, 2019

  1. Slide 1: PT ABM Investama Tbk - J.P. Morgan Emerging Markets Credit Conference

    PT ABM Investama Tbk J.P. Morgan Emerging Markets Credit Conference London, September 24 — 26, 2019 ADVANCING CORE BUSINESS MEMPERKUAT SINERGI, MEMAJUKAN BISNISINTI

  2. Slide 2: Disclaimer

    This presentation has been prepared by PT ABM Investama Tbk (“ABMM” or the "Company") solely for general information. By attending the meeting where the presentation is made, or by reading the presentation slides, you acknowledge and agree to the limitations and notifications as stated herein. This

  3. Slide 3: Agenda

    1 Who We Are 2 Core Operations : Mining Value Chain 3 Our Strategy 4 Appendix : Our Performance Strengthening Synergy, Advancing Core Business

  4. Slide 4: Who We Are

    1 Who We Are 2 Core Operations : Mining Value Chain 3 Our Strategy 4 Appendix : Our Performance Strengthening Synergy, Advancing Core Business

  5. Slide 5: Group structure and ownership

    Hamami Family 100.00% 93.00% PT Tiara Marga Trakindo Valle Verde Pte Ltd Public (“TMT Group”) 23.00% 56.00% 21.00% Restricted Group 99.99% 99.99% 99.99% 99.99% 99.98% 99.99% 99.99% 99.99% 99.12% PT Tunas Inti Abadi PT Alfa Trans Raya PT Andara Candria (TIA) 99.99% (ATR) Energi 70.00% PT Mifa Bersaud

  6. Slide 6: Trakindo / TMT Group and Caterpillar partnership

    ◼ TMT Group is 100% owned by the Hamami Family. Hamami Family ◼ Trakindo was founded by AHK Hamami in 1970 and has developed into one of the largest domestic conglomerates in Indonesia over a 45 year period ◼ Trakindo became the sole authorized dealer for Caterpillar in 1971 and now PT Tiara Marga T

  7. Slide 7: ABM business units overview

    COAL MINING INTEGRATED FUEL MANUFACTURING MINING CONTRACTOR LOGISTICS SUPPLY ▪ Established 2010 ▪ Established 1997 ▪ Established 1977 ▪ Established 2011, ▪ Established 1997 ▪ 7,714 Ha concession ▪ Provides integrated logistics, ▪ 4 manufacturing fully operated in ▪ Fleet of 651 heavy area under 3 IU

  8. Slide 8: ABM footprint across Indonesia

    3 IUP 6,933 28 2 Provinces Employees Provinces 51 Branches 9 Projects 24 Provinces 5 Provinces 10 Branches 7 Provinces 8 Locations 4 Provinces Data as of December 2018 Strengthening Synergy, Advancing Core Business 7

  9. Slide 9: Core Operations: Mining Value Chain

    1 Who We Are 2 Core Operations : Mining Value Chain 3 Our Strategy 4 Appendix : Our Performance Strengthening Synergy, Advancing Core Business

  10. Slide 10: Strengthening Synergy, Advancing Core Business

    Strengthening Synergy, Advancing Core Business 9

  11. Slide 11: Mining Value Chain vs Non-Mining Value Chain

    Mining Value Chain Non-Mining Value (MVC) Chain (Non MVC) Revenue EBITDA Revenue EBITDA 83% 92% 17% 8% Contributing more than 85% of the total MVC Strengthening Synergy, Advancing Core Business 10

  12. Slide 12: Indonesia as largest coal exporter

    425 China 430 Cambay 220 Calcutta 180 215 167 Chennai 420 87 80 71 207 85 79 72 Lhoknga 158 BEL 82 77 73 MIFA Indonesia Australia Russia Colombia South Africa Others TIA 2018 2019 2020 ◼ Indonesia is the largest coal exporter in the world ◼ Compared to the other coal producers, Indonesia has a strat

  13. Slide 13: Mining contractor customers and contracts

    • With 630 Heavy Equipments, currently has contracts with 7 Indonesian coal producers. Customer Contract Expired GAR Location TIA Life of Mine 4200 South Kalimantan Mifa Life of Mine 3400 Aceh MHU Life of Mine 5500 East Kalimantan MAS 2022 4800 South Sumatra AGM 2020 4800 South Kalimantan BBE 2020 5

  14. Slide 14: Overburden removal volume and life of mine contracts

    OB Removal Volume (mn bcm) 280-285 270-275 TIA Mifa 220-225 MHU 185-195 Target 1 140 129 Target 2 TIA 100-110 Mifa Target 3 Others Target 4 Toba bara Target 5 Others 2017 A 2018 A 2019 OL 2020 F 2021 F 2022 F 2023 F % Life of Mine Contracts 27% 31% 59% 95% 96% 96% 96% Strengthening Synergy, Advancin

  15. Slide 15: Contractor OB removal, EBITDA and net income

    200 185-195 0.85 0.75 • CK to have LoM 150 140.4 contracts on all sites 132.3 0.55 – 0.60 131.1 129.1 0.65 • CK has shown 0.55 noticeable operational 0.57 100-110 improvement 100 0.55 0.53 110-115 0.45 • Improve plant and 0.45 – 0.47 assets, operation, and 75.9 0.35 71.8 74.3 process 50 0.24 0.25 •

  16. Slide 16: Actual production vs production target

    Actual Production vs Production Target (%) 79% 79% 84% 105% 94% 2017 2018 Aug 2019 78% 12 12 14 2017 2018 Aug 2019 100% 94% 90% 2017 2018 Jun 2019 2017 2018 Aug 2019 Strengthening Synergy, Advancing Core Business 15

  17. Slide 17: Mifa concession in Aceh

    ▪ Mifa is located in Aceh Province with total concession area of 3,134 ha ▪ Mifa has been conducting pilot mining since Jan 2012 and shipping coal to Lhok Nga, Aceh Besar since Oct 2012. Thus, Mifa is the pioneer of coal operation in Aceh ▪ 210 mn tons of reserves as of 30 Jun 2019 China ▪ Coal spec

  18. Slide 18: Mifa coal sales, EBITDA and net income

    11 100 • MIFA ramps up, to 10mn MT, low 10 -11 SR, lower cost, financial 9 80 performance improved 7.5–8.1 • Potential ramps up, to 15mn MT 7 60 production onward 5.1 • Operationally stable in 2020 35-36 5 28-29 40 • Already secured contract 8.4 mn 44.0 20.9 MT in 2019 and 14 mn MT in 3 20 2020 1.3

  19. Slide 19: Strengthening Synergy, Advancing Core Business

    Strengthening Synergy, Advancing Core Business 18

  20. Slide 20: TIA concession in South Kalimantan

    ▪ Started production in 2008. TIA coal product has trademarked as “TIA The Compliant Coal" with low sulfur and ash content ▪ TIA is located in South Kalimantan Province with a total concession area of 3,085 ha China ▪ 12 mn tons of reserves as of 30 Jun 2019 ▪ Coal spec in TIA : Cambay Calorific Val

  21. Slide 21: TIA as ABM operation hub

    • TIA as ABM Operation Hub in South Kalimantan • Revenue from TIA Mine BIB infrastructure rental SDJ • Synergy TIA Coal Hauling Road TBR operation within ABM group Province Road TIA Port 20

  22. Slide 22: Our Strategy

    1 Who We Are 2 Core Compentencies : Mining Value Chain 3 Our Strategy 4 Appendix : Our Performance Strengthening Synergy, Advancing Core Business

  23. Slide 23: Synergy cost illustration (hypothetical)

    Hypothetical numbers For illustrative purposes only ASP: $41.00 $ 10 $ 19 $ 31 $7 $ 1.3 $ 0.3 $ 0.4 $ 22 Cash Cost CK BDD PBR PWP Synergy Cost Strengthening Synergy, Advancing Core Business 22

  24. Slide 24: Strategic focus on mining

    Mining Mining Services 1. Focusing on Mining Value Chain 2. Improving operations in Mining Services 3. Looking for suitable Mining Assets Cash TIACost - CK BDD PBR PWP Synergy Cost Mifa Mining Logistics Port Fuel Supply Contractor Management - Cyclical - Fixed income, Stable business - Reserve - Lif

  25. Slide 25: Advancing Core Business

    = —_\ ABM ADVANCING CORE BUSINESS MEMPERKUAT SINERGI, MEMAJUKAN BISNISINTI

  26. Slide 26: Appendix: Our Performance

    1 Who We Are 2 Core Compentencies : Mining Value Chain 3 Our Strategy 4 Appendix : Our Performance Strengthening Synergy, Advancing Core Business

  27. Slide 27: Financial performance 2015-1H 2019

    5.8 43.9 5.4 5.3 40.0 40.8 4.6 33.7 29.8 27.5 2.2 2.1 2015A 2016A 2017A 2018A 1H 2018 1H 2019 2015A 2016A 2017A 2018A 1H 2018 1H 2019 7.0 6.2 6.4 5.4 30.7 4.8 29.2 29.1 4.1 23.7 24.1 19.8 2015A 2016A 2017A 2018A 1H 2018 1H 2019 2015A 2016A 2017A 2018A 1H 2018 1H 2019 Strengthening Synergy, Advancing

  28. Slide 28: Financial performance 2015-1H 2019

    4.9 26.3 26.9 24.9 21.7 22.4 3.7 20.6 2.7 2.2 1.4 0.5 2015A 2016A 2017A 2018A 1H 2018 1H 2019 2015A 2016A 2017A 2018A 1H 2018 1H 2019 2.5 2.4 29.2 2.2 2.3 2.1 25.4 18.7 16.7 16.5 17.0 0.7 2015A 2016A 2017A 2018A 1H 2018 1H 2019 2015A 2016A 2017A 2018A 1H 2018 1H 2019 Strengthening Synergy, Advancing

  29. Slide 29: Operational and financial performance

    90.0 140.4 131.1 131.3 129.1 85.0 83.0 Industry 85% 83.0 78.0 79.0 2015A 2016A 2017A 2018A 1H 2018 1H 2019 63.4 43.8 68.0 62.0 57.3 55.0 56.8 46.3 2015A 2016A 2017A 2018A 1H 2018 1H 2019 2015A 2016A 2017A 2018A 1H 2018 1H 2019 Strengthening Synergy, Advancing Core Business 28

  30. Slide 30: Revenue, EBITDA and net income trends

    160.0 25.0% 140.0 17.7% 20.0% 120.0 773.1 14.1% 690.7 100.0 15.0% 654.6 136.8 590.7 80.0 10.2% 7.2% 8.0% 10.0% 60.0 376.8 40.0 54.9 53.1 286.5 42.3 5.0% 20.0 0.7% 29.2 - 0.0% 4.9 2015A 2016A 2017A 2018A 1H 2018 1H 2019 2015 2016 2017 2018 1H 2018 1H 2019 250.0 35.0% 80.0 8.5% 10.0% 28.1% 24.8% 25.3%

  31. Slide 31: Leverage ratios

    4.5 3.5 3.3 3.2 3.2 3.0 2.4 3.4 1.9 2.7 1.5 1.5 2.7 2.6 2.3 2.2 1.0 1.6 0.8 1.0 2015 2016 2017 2018 LTM 1H 2019 2015 2016 2017 2018 LTM 1H 2019 Debt/EBITDA Net Debt/EBITDA Debt to Equity Net Debt to Equity 17%* 16.4%* 26.4%* 22.5%* 7.9% 3.4% 6.5% 4.5% -21.9% 0.3% 2015 2016 2017 2018 LTM 1H 2019 2015

PT ABM Investama — J.P. Morgan Emerging Markets Credit Conference 2019 on 6ix