Sunrise Energy Metals Limited · ASX:SRL
Sunrise Energy Metals — Corporate Update (June 2024)
20 slides from Sunrise Energy Metals's corporate update, Jun 24, 2024
Slide 1: Sunrise Project Community Consultative Committee
Sunrise Project Community Consultative Committee 24 June 2024
Slide 2: Contents
Contents 1 Sunrise Regional Update – Water Bores & Mineral Exploration 2 Community Update 3 Environmental Management Update 4 Environmental Approvals Update 5 Finance Update 6 CCC Member Questions 2 Powering innovation | June 24
Slide 3: Sunrise Regional Update – Water Bores & Mineral Exploration
01 Sunrise Regional Update – Water Bores & Mineral Exploration 3 Powering innovation | June 24
Slide 4: Water Bore Drilling – Sunrise Project Borefield
Water Bore Drilling – Sunrise Project Borefield › Sunrise completed construction of the remaining approved water bores in June 2023 › Production bores installed in three locations: – Two on private land – One on Crown Land › Monitoring wells installed at three locations › Sites rehabilitated followi
Slide 5: Powering innovation | June 24
5 Powering innovation | June 24
Slide 6: Pump Testing – Sunrise Project Borefield
Pump Testing – Sunrise Project Borefield › Following production bore construction, Sunrise undertook pump testing of the bores as required by conditions of the water supply works approval › Pump testing completed 11-31 January 2024 – Each bore pumped for 72 hours duration – Recovery water levels mon
Slide 7: Mineral Exploration in the Region – Limestone
Mineral Exploration in the Region – Limestone › Reverse circulation (RC) drilling programs have been completed at our Boona Gap & Meloola tenements over the first half of 2024 › 12 RC holes were drilled at the Boona Gap tenement and 8 RC holes at the Meloola tenement to a depth of 50-90 metres to de
Slide 8: Community Update
02 Community Update 8 Powering innovation | June 24
Slide 9: Community – Working Together
Community – Working Together › Community Events – Supported the Trundle Back in Time event on 16th March sponsoring the dog jump › Preparing to support the 2024 local agricultural shows › Attended the NSW Minerals Council careers night in Orange on 22nd May to promote the mining industry as a career
Slide 10: Keeping People Informed
Keeping People Informed › Community Communication – Parkes and Condobolin shopfronts are open, first and third Tuesday/Thursday of the month › Sunrise Energy Metals website – Complaints register published monthly, with zero complaints YTD – Community Complaints line listed on our website – 1800 952
Slide 11: Environmental Management Update
03 Environmental Management Update 11 Powering innovation | June 24
Slide 12: Environmental Monitoring
Environmental Monitoring › Continuing environmental monitoring: – Air Quality – Surface Water – Groundwater (November and May/June) – Meteorological › Depositional dust and Particulate Matter (PM10 and PM2.5) › Surface water monitoring events – February and May 2024 › Groundwater monitoring – Next r
Slide 13: Property Management
Property Management › New boundary fences installed: – Wilmatha Road – Fifield Road › Weed spraying (ongoing) › Mining Lease under crop 13 Powering innovation | June 24
Slide 14: Environmental Approvals Update
04 Environmental Approvals Update 14 Powering innovation | June 24
Slide 15: Government Reporting
Government Reporting › Annual project reporting completed for 2023: – Annual Return to the EPA – 2023 Annual Review to DPE https://www.sunriseem.com/wp-content/uploads/2024/04/Annual-Review-2023.pdf 15 Powering innovation | June 24
Slide 16: Critical Asset Approvals
Critical Asset Approvals › 132kV Electrical Transmission Line (ETL) – Connection agreement with Network Service Provider progressing including completion of the required AEMO power systems studies – First 40km of the ETL will replace the existing 66kV Trundle supply line with a dual 132/66 kV line –
Slide 17: Critical Asset Approvals
Critical Asset Approvals › Raw Water Pipeline and Borefield – S138 Roads Act approval and lease with the Councils was extended until March 2027 – Licence and easement application over Crown Land progressing › Oversize Transport Route (Port Pirie to Sunrise) – Grant Funding of $500K received from NSW
Slide 18: Finance Update
05 Finance Update 18 Powering innovation | June 24
Slide 19: CCC Member Questions
06 CCC Member Questions 19 Powering innovation | June 24
Slide 20: Thank you