Tellurian — Investor Presentation (May 2017)
28 slides from Tellurian's investor presentation, May 4, 2017
Slide 1: Corporate presentation May 2017
Corporate presentation May 2017 Exhibit 99.1
Slide 2: Cautionary statement
Cautionary statement Forward looking statement Non-GAAP Financial Measures ‘The neaton in the presentation ius “Yowardiccking sateen win "Wie mon cnn homaton st acted ETO Tain, ETON emerge sant Soe At on, arene ra nancial measure detrminedm accerdance wth US. ganealy acepted Secon 218 ol Seats Exhng
Slide 3: Introduction and key facts
Introduction Key facts Inception In Feb. 2016, Charif Souki and Martin Houston co-founded Tellurian Investments Inc. Strategy Low-cost LNG provider capable of optimizing an integrated value chain Driftwood Project Driftwood Terminal, a ~26 mtpa LNG export facility near Lake Charles, LA Driftwood Pip
Slide 4: Global gas demand: expecting steady growth
Global gas demand Expecting steady growth Source:BP World Energy Outlook (2017 edition) Note:(1) conversion factor assumed at 1 million tonne equivalent to 48 bcf Incremental gas demand 2015-2030:105 Bcf/d(785 mtpa) Average annual gas demand growth:7 Bcf/d(50 mtpa) 2015-2030 CAGR 1.7% 3.0% 3.2% 0.0%
Slide 5: LNG market: from surplus to shortfall
LNG market: from surplus to shortfall Source:WoodMackenzie (Q3 2016) Note:(1) Assumes liquefaction capacity utilization rate of 95%, 90% and 85% in 2021, 2022 and 2023, respectively, and 85% thereafter (2) Driftwood LNG assumed to have liquefaction capacity of ~26 mtpa (3) FID shortfall grossed up b
Slide 6: ~100 mtpa of additional liquefaction needed to meet LNG demand by 2025
~100 mtpa of additional liquefaction needed to meet LNG demand by 2025 Source:Wood Mackenzie (Q1 2017) Note:(1) Actual LNG consumption in 2016 (2) Actual LNG global liquefaction capacity in 2016 (3) Estimate of liquefaction capacity of projects under construction (4) Estimated reduction of liquefact
Slide 7: Commodity prices
Commodity prices Source:ICE, Platts via Globalview Note:(1) Prices updated as of 5/1/2017 (2) JKM represents Platts JKMTM (3) Brent prices based on forward curve (4) Conversion of Transfer Title Facility (TTF) and translation from €/MWh based on MarketView (5) Based on Newcastle coal price index (3)
Slide 8: $8.00 Asian price = $3.00 – $4.15 margin
$8.00 Asian price = $3.00 – $4.15 margin Note:(1) Represents Transfer Title Facility located in the Netherlands (2) HH represents Henry Hub prices, assumed at $3.00/MMBtu (3) Based on Tellurian’s estimate of shipping costs assuming return voyage from U.S. Gulf of Mexico to Northeast Asia through Pan
Slide 9: Driftwood Project
Driftwood Project Notes:(1) Estimate, subject to further engineering evaluation (2) Excludes owners’ costs, financing costs and contingencies Driftwood terminal Land ~1,000 acres near Lake Charles, LA Nameplate capacity ~26 mtpa(1) Trains Up to 20 trains of 1.3 mtpa each Chart heat exchangers GE LM6
Slide 10: Driftwood LNG – cost competitive
Driftwood LNG – cost competitive Source:Wood Mackenzie (Q4 2016) Note:(1) Includes owners’ costs and contingencies and excludes financing and pipeline related costs (2) Excludes development costs related to berths and storage tanks (2) (1)
Slide 11: Fast mover through regulatory process
Fast mover through regulatory process Source: FERC regulatory filings Note:(1) Duration of FERC review for Driftwood Project filing based on Tellurian estimates (1) We employ many from the same team that executed Sabine Pass
Slide 12: Estimated project timeline
2016 June FERC Pre-filing review process Estimated project timeline 2018 Construction begins, pending regulatory approval 2022 First LNG plant operational 2023 Full pipeline operations 2017 Q1 FERC application filing 2025 All LNG plants operational Note:(1) LSTK represents lump-sum turnkey Engineeri
Slide 13: Simple capital structure
Simple capital structure Capital structure Note:(1) As of 04/25/2017 (2) Includes holdings of Souki Family 2016 Trust (3) Removal of restriction is subject to Driftwood Project reaching a final investment decision (FID) (4) Based on construction costs of ~$500-$600/tonne, excluding owners’ costs, fi
Slide 14: Strategy: clean, low-cost, flexible LNG to growing markets
We aim to create value and help improve air quality by delivering clean, low-cost, flexible and reliable liquefied natural gas to growing markets(1) We are building a natural gas business that includes ~26 mtpa of production from the Driftwood Project, trading of LNG cargoes and development of new m
Slide 15: Driftwood Project illustration
Driftwood Project illustration
Slide 16: Contact us
Amit Marwaha Director, Investor Relations & Finance +1.832-485-2004 [email protected] David Castaneda Investor Relations +1.414-351-9758 [email protected] Contact us Joi Lecznar SVP, Public Affairs and Communication +1.832-962-4044 [email protected]
Slide 17: Appendix
Ss Appendix TELLURIAN
Slide 18: Leadership team
Leadership team Charif Souki, Chairman Founded Cheniere Energy, the first LNG export company in the U.S., growing it to a $9 Bn company while serving as CEO from 2002 to 2015 A lifelong entrepreneur, Charif has spent 20 years raising and investing capital in a range of industries globally Martin Hou
Slide 19: Leadership team
Leadership team Howard Candelet, SVP Projects Joined Tellurian after 40 years at BG Group, where he held many senior management positions in General Operations, Project Management, Company Business Operations and Business Development Deep operational experience includes stint as VP operations at BG
Slide 20: Driftwood terminal vs. traditional LNG plant – design
Driftwood terminal vs. traditional LNG plant – design DWLNG layout: 5.2 mtpa Traditional layout: 4.5 mtpa GE LM6000 PF+ (x4): cheapest dollar per installed horsepower = more LNG production per acre Gas pre-treatment facility Chart cold boxes (x4): IPSMR technology uses single mixed refrigerant; desi
Slide 21: Key project partners
Key project partners Liquefaction technology World-class cold box manufacturer for all technologies – supplied more than 10,000 brazed aluminum heat exchanger (BAHX) cores – more than 500 for LNG service Driftwood LNG to use the Integrated Pre-cooled Single Mixed Refrigerant (IPSMR®) liquefaction pr
Slide 22: Simple capital structure
Simple capital structure Tellurian Inc. (NASDAQ:TELL) Equity Issuances Driftwood Pipeline Project finance debt Project equity / preferred equity Project finance debt Driftwood LNG
Slide 23: FERC approval process
Authorization under Section 3 (terminal) and Section 7 (pipeline) of the Natural Gas Act FERC designated as lead agency Oversee siting, construction and operation of LNG facilities by Energy Policy Act 2005 Provide National Environmental Policy Act (NEPA) analysis and develop Environmental Impact St
Slide 24: Forecasted LNG consumption
Forecasted LNG consumption Source: Wood Mackenzie (Q4 2016) Approximately a third of global gas demand growth expected to be supplied from new LNG sources
Slide 25: Growth in Asia / Middle East LNG demand in 2016
12% Growth in Asia / Middle East LNG demand in 2016(1) Source:IHS Markit Waterborne Note:(1) 2016 year-on-year change (2) AME represents Asia and Middle East (2) (2)
Slide 26: Expiration of existing contracts
Expiration of existing contracts Source:HIS Energy Note:Based on executed Sale and Purchase Agreements and Liquefaction Tolling Agreements
Slide 27: The U.S. offers the right product to customers
The U.S. offers the right product to customers Lower 48/GOM Liquefaction Projects in Bottom Quartile of Cost Curve Source: IHS Energy
Slide 28: Driftwood Project cost competitive
Driftwood Project cost competitive Source: IHS Energy Driftwood Project Awaiting Final Investment Decision (FID) US Projects – Under construction