Sundance Energy — Sundance Energy Australia — Merger or Acquisition (March 2018)
53 slides from Sundance Energy's merger presentation, Mar 16, 2018
Slide 1: Disclaimers: Important Notice and Disclaimer
Disclaimers Important Notice and Disclaimer IMPORTANT: You are advised to read the following carefully before making any use of the information contained in this presentation. This presentation has been prepared by Sundance Energy Australia Limited ACN 112 202 883 (Sundance or the Company). This pre
Slide 2: Disclaimers: Industry data, past performance, forward-looking statements
Disclaimers Industry data Certain market and industry data used in connection with this presentation, including in relation to other companies in Sundance’s peer group, may have been obtained from public filings, research, surveys or studies conducted by third parties, including industry or general
Slide 3: Disclaimers: Underwriters' disclaimers and investment risk
Disclaimers Underwriters’ disclaimers Neither the underwriter, nor any of its respective affiliates or related bodies corporate, nor any of their respective directors, officers, partners, employees, agents or advisers (Underwriter Parties) have caused, permitted or authorised the issue, submission,
Slide 4: Disclaimers: Qualified Resource Evaluator's Statement
Disclaimers Qualified Resource Evaluator's Statement The information in this presentation that relate to petroleum reserves in Eagle Ford leasehold interests held by the vendors and which are subject to the proposed acquisition by Sundance set out in this presentation, is based on, and fairly and ac
Slide 5: Table of Contents
Table of Contents Section: Transformational Transaction for Sundance Highly Attractive Asset Base Sundance Financed to Execute on Plan Sundance – Multiple Ways for Shareholders to Benefit Appendix: Technical Overview Contract and Reserve Estimate Assumptions Key Risks Offer Restrictions Glossary All
Slide 6: Transformational Transaction for Sundance
Transformational Transaction for Sundance
Slide 7: Transaction Highlights
Transaction Highlights Transformational M&A Transaction Acquiring 21,900 net acres, and 1,800 boe/d of current production(1) for US$221.5m Increased scale drives significant capital efficiency and value creation to shareholders Peer leading oil growth in a core Eagle Ford position New Midstream cont
Slide 8: Acquisition Highlights
Transformational Transaction for Sundance Highly Attractive Asset Base Sundance Financed to Execute on Plan Sundance – Multiple Ways for Shareholders to Benefit Acquisition Highlights Transformational Acquisition Creates a High Quality, Pure-Play Eagle Ford Aggregator US$221.5m acquisition of 21,900
Slide 9: Sundance – A Leading Eagle Ford Producer
Sundance – A Leading Eagle Ford Producer Transaction creates a leading Eagle Ford producer Material Scale & Inventory Pro forma Eagle Ford position of 56,600 net acres with pro-forma independently certified 1P reserves of 87.8 MMboe and Proved PV(10) of US$650m(1) Inventory of 716 gross (614 net) un
Slide 10: Highly Attractive Asset Base
Highly Attractive Asset Base
Slide 11: Contiguous Acreage in the Core of the Eagle Ford Oil Play
Contiguous Acreage in the Core of the Eagle Ford Oil Play Acquisition provides highly economic, underexploited inventory, proximal to Sundance’s existing acreage Note: Please see glossary for defined terms; map excludes Area 32 due to immateriality of metrics shown on map. GPI refers to gross perfor
Slide 12: Continued Improvements in Eagle Ford Drive Production Growth
Continued Improvements in Eagle Ford Drive Production Growth Acquired acreage is largely undeveloped Existing wells developed using old generation completion techniques All acquired producing wells completed in the 500-1,000 lbs/ft range. Technical innovations in completion design have resulted in i
Slide 13: Thick Eagle Ford Section Across Position
Thick Eagle Ford Section Across Position Thickness of the Lower Eagle Ford averages over 125 feet across Sundance’s position Recoverable hydrocarbons in place support two landing zones in the Lower Eagle Ford The increase in thickness along with other positive reservoir properties observed across a
Slide 14: Growing Sundance's Inventory
Growing Sundance’s Inventory Majority of acquired inventory is within Area 41, which adds significant quality locations to Sundance’s already economic inventory Acquired Eagle Ford locations that are positioned in Area 41 Live Oak have IP-30’s > 580 bbl/d with % liquids greater than 80% A majority o
Slide 15: Midstream Alignment Facilitates Growth
Transformational Transaction for Sundance Highly Attractive Asset Base Sundance Financed to Execute on Plan Sundance – Multiple Ways for Shareholders to Benefit Midstream Alignment Facilitates Growth Concurrent with the acquisition Sundance has entered into a renegotiated series of midstream agreeme
Slide 16: Sundance Financed to Execute on Plan
Sundance Financed to Execute on Plan
Slide 17: Financing Framework
Financing Framework Equity financing provides multiple benefits Fully equity-financed acquisition Allows more favourable refinancing of debt facilities Refinanced credit facilities New term loan of US $250m (increased from existing US$125m) Adds US$75.5m of undrawn borrowing capacity (US $87.5m, net
Slide 18: Sources & Uses of Funding
Transformational Transaction for Sundance Highly Attractive Asset Base Sundance Financed to Execute on Plan Sundance – Multiple Ways for Shareholders to Benefit Sources & Uses of Funding Post-closing liquidity and cash flow is expected to fund the 2018 and 2019 development plan which will result in
Slide 19: Equity Funding Details: Three Part Equity Financing
Transformational Transaction for Sundance Highly Attractive Asset Base Sundance Financed to Execute on Plan Sundance – Multiple Ways for Shareholders to Benefit Total Financing ($m) A$ US$ 370,697,000 new Shares at an issue price of A$0.059 (US $0.046) per Share Initial Placement is pre-committed Sh
Slide 20: Offering Structure: Accelerated Non-Renounceable Entitlement Offer
Offering Structure Accelerated non-renounceable entitlement offer Offer Structure - Fully underwritten Accelerated Non-Renounceable Entitlement Offer to raise A$73.9m – eligible shareholders are entitled to purchase 1 New Share for every 1 existing ordinary share held at 7:00pm (Sydney time) on the
Slide 21: Offering Structure: Conditional Placement
Offering Structure The Company is seeking shareholder approval of the Conditional Placement Amount of Funding Sundance to use this US$184.8m(1) to pay the balance of the purchase price for the Acquisition and to fund development of the assets Sundance Directors’ Recommendation (2) The Board is recom
Slide 22: Offer Timetable
Offer Timetable(1)(2) Seeking approval of the Conditional Placement at an EGM to be held in mid-April Note: Please see Glossary for defined terms Assumes that the Conditional Placement is approved by shareholders at the EGM The Company reserves the right to alter the timetable at its discretion Inst
Slide 23: Pro Forma Balance Sheet and Net Debt
Transformational Transaction for Sundance Highly Attractive Asset Base Sundance Financed to Execute on Plan Sundance – Multiple Ways for Shareholders to Benefit Pro Forma Balance Sheet and Net Debt Net Debt to Net Assets on a pro forma basis reduces from 97.2% to 39.8% and debt facilities refinanced
Slide 24: Notes to Pro Forma Balance Sheet and Net Debt
Transformational Transaction for Sundance Highly Attractive Asset Base Sundance Financed to Execute on Plan Sundance – Multiple Ways for Shareholders to Benefit Pro Forma Balance Sheet and Net Debt Notes to Pro Forma Balance Sheet and Net Debt (previous slide) The adjustment to cash includes an incr
Slide 25: Hedging Plan Reduces Risk
Hedging Plan Reduces Risk As at 31 December 2017 62% of oil hedging is above $50/bbl for 2018 and 2019 Gas Hedges(1) Oil Hedges(1) Gas Hedges(1) Oil Hedges(1) Gas Hedge Contracts(1) Weighted-Avg. Pricing Year Mcf Mcf/d Floor Ceiling 2018 2,106,000 5,770 $2.92 $3.24 2019 1,212,000 3,321 $2.78 $3.47 2
Slide 26: Sundance – Multiple Ways for Shareholders to Benefit
Sundance – Multiple Ways for Shareholders to Benefit
Slide 27: Multiple Levers for Sundance Shareholder Value Creation
Multiple Levers for Sundance Shareholder Value Creation Ryder Scott’s Proved PV(10) of US $650m(1) is ~32.5% above post-transaction enterprise value(2) 2P PV(10) of US $875m(1) is ~78.4% above post-transaction enterprise value(2) Enhanced asset quality with highly attractive acreage provides opportu
Slide 28: Appendix I Technical Overview
Appendix I Technical Overview
Slide 29: Technical Overview: Area Live Oak – LEF Single Well Assumptions
Technical Overview Area 41 Live Oak – LEF – Single Well Assumptions Locator Map Area 41 Live Oak Type Curve Assumptions Rate – Time Profile Internal Company estimates using Strip NYMEX pricing as of 1 February 2018. Capex is based on 2 wells/pad
Slide 30: Technical Overview: Area Atascosa – LEF Single Well Assumptions
Technical Overview Area 41 Atascosa – LEF – Single Well Assumptions Locator Map Rate – Time Profile Area 41 Atascosa Type Curve Assumptions Internal Company estimates using Strip NYMEX pricing as of 1 February 2018. Capex is based on 2 wells/pad
Slide 31: Technical Overview: Area La Salle – LEF Single Well Assumptions
Technical Overview Area 11 La Salle – LEF – Single Well Assumptions Locator Map Rate – Time Profile Area 11 La Salle Type Curve Assumptions Internal Company estimates using Strip NYMEX pricing as of 1 February 2018. Capex is based on 2 wells/pad
Slide 32: Technical Overview: Area McMullen – LEF Single Well Assumptions
Technical Overview Area 21 McMullen – LEF – Single Well Assumptions Locator Map Rate – Time Profile Area 21 McMullen Type Curve Assumptions Internal Company estimates using Strip NYMEX pricing as of 1 February 2018. Capex is based on 2 wells/pad
Slide 33: SEA Dimmit – Single Well Assumptions
SEA Dimmit – Single Well Assumptions Locator Map Rate – Time Profile SEA Dimmit Type Curve Assumptions Technical Overview MAVERICK DIMMIT Internal Company estimates using Strip NYMEX pricing as of 1 February 2018. Capex is based on 2 wells/pad
Slide 34: SEA McMullen – Single Well Assumptions
SEA McMullen – Single Well Assumptions Locator Map Rate – Time Profile SEA McMullen Type Curve Assumptions Technical Overview Internal Company estimates using Strip NYMEX pricing as of 1 February 2018. Capex is based on 2 wells/pad
Slide 35: Minimum Revenue Commitments under Midstream Contracts
Minimum Revenue Commitments under Midstream Contracts The midstream contracts require Sundance to deliver certain specified minimum volumes to the midstream company each year. If the minimum deliveries are not met, a payment equal to the quantity shortfall times the fee is required. The table below
Slide 36: Appendix II Contract and Reserve Estimate Assumptions
Appendix II Contract and Reserve Estimate Assumptions
Slide 37: Underwriting Agreement
Underwriting Agreement Underwriting Agreement The Underwriters and Sundance entered into the Underwriting Agreement on 15 March 2018 under which the Underwriters were appointed by Sundance to act as lead managers, underwriters and bookrunners for the Entitlement Offer, and lead managers to the Initi
Slide 38: Underlying Assumptions for Reserve PV(10) estimates
Underlying Assumptions for Reserve PV(10) estimates Unless otherwise noted, the PV(10) values provided in this presentation were based on Ryder Scott’s evaluation effective 1 July 2017, and are subject to the following underlying assumptions: Commodity prices Oil Pricing: WTI pricing of $52.00 in 20
Slide 39: Underlying Assumptions for Reserve PV(10) estimates
Underlying Assumptions for Reserve PV(10) estimates Unless otherwise noted, the PV(10) values provided in this presentation were based on Ryder Scott’s evaluation effective 1 July 2017, and are subject to the following Underlying assumptions: 1. Commodity pri * Oil Pricing: WTI pricing of $52.00 in
Slide 40: Key Risks: Impairment of carrying value of properties
Key Risks Impairment of carrying value of properties Sundance may be required to write-down the carrying value of its oil and natural gas properties when oil and natural gas prices are low. Under International Financial Reporting Standards, which Sundance is required to comply with, the net capitali
Slide 41: Key Risks: Integration risk
Key Risks Integration risk The Acquisition will result in a step change in the scale of Sundance’s operations. There is a risk that this change will not be managed appropriately resulting in loss of value of the assets. The Acquisition involves risks associated integrating acquired properties into e
Slide 42: Key Risks: Leverage and debt service obligations
Key Risks Leverage and debt service obligations As at 31 December 2017, Sundance had $210m of debt outstanding and no availability remaining under its revolving credit facility. This level of indebtedness could affect operations in several ways, including by: requiring Sundance to dedicate a substan
Slide 43: Key Risks: Commodity price risk
Key Risks Commodity price risk and volatility of oil and gas prices The Company’s main business activities are highly exposed to movements in global oil prices and to a lesser extent, changes in gas prices. The prices of oil, natural gas and other hydrocarbon products remain outside the control of t
Slide 44: Key Risks: Funding risk
Key Risks Funding risk The Company may require capital in addition to the Capital Raising (following completion of the budgeted work program through 2018), in order to fund development activities or for additional acquisitions. Failure to obtain such finance in a timely manner could impact its abili
Slide 45: Key Risks: Industry competition and energy demand
Key Risks Industry competition and energy demand The availability of a market for oil and gas in the future will depend in part on cost and availability of alternate fuels, the level of consumer demand, the extent of domestic production of oil and gas, the extent of important foreign oil and gas, th
Slide 46: Appendix IV Offer Restrictions
Appendix IV Offer Restrictions
Slide 47: Offer Restrictions: International Offer Restrictions
Offer Restrictions International Offer Restrictions This document does not constitute an offer of entitlements ("Entitlements") or new ordinary shares ("New Shares") of the Company in any jurisdiction in which it would be unlawful. In particular, this document may not be distributed to any person, a
Slide 48: Offer Restrictions: Canadian tax considerations
Offer Restrictions Certain Canadian income tax considerations. Prospective purchasers of the Entitlements and the New Shares should consult their own tax adviser with respect to any taxes payable in connection with the acquisition, holding or disposition of such securities as any discussion of taxat
Slide 49: Offer Restrictions: Singapore
Offer Restrictions Singapore This document and any other materials relating to the Entitlements and the New Shares have not been, and will not be, lodged or registered as a prospectus in Singapore with the Monetary Authority of Singapore. Accordingly, this document and any other document or material
Slide 50: Offer Restrictions: Singapore
Offer Restrictions Singapore This document and anyother materi relating tothe Entitlements andthe New Shares have not ben, ad wil nt be, lodged or restered 35.2 prospectus in Singapote withthe Monetary Authority of Singapore ‘According ths document and any ther document or mater in connection wih th
Slide 51: Glossary
Glossary Term Meaning 1P Or "proved reserves" are those reserves that should have at least a 90% probability that the quantities actually recovered will meet or exceed the estimate 2P Or the “Sum of Proved Reserves plus Probable Reserves” are those considered as the best estimate of quantities to be
Slide 52: Glossary
Glossary Term Meaning GPI Gross perforated interval Initial Placement Placement of 370,697,000 new Shares at the Entitlement Offer Price to professional and sophisticated investors identified by the Company and Underwriters to raise approximately A$21.9 million IP-30 Initial Production – 30, the ave
Slide 53: Glossary
Glossary Pt Initial Placement p30 Lateraltength MNboe MRC NetLocations NoemiP30 eakiP30 Pioneer Production Months Proppant Proppant Concentration vio) Rate-Time Profile Reliance Seles Sha sinc Slickwater Completion Sundance or Company Underwriting Agreement Underwriters vwae Volatile oil Volatile Wi