Canadian Premium Sand, Inc. · TSXV:CPS
Canadian Premium Sand — Investor Presentation (November 2022)
17 slides from Canadian Premium Sand's investor presentation, November 2022
Slide 1: Low-Carbon Manufacturing of Solar Glass
LOW-CARBON MANUFACTURING OF SOLAR GLASS November 2022
Slide 2: Introduction
Introduction Canadian Premium Sand Inc. (“CPS” or “the Company”) is a public company listed on the TSX-Venture Exchange CPS Solar Glass Facility Building North America’s first integrated solar glass manufacturing facility (Industry currently dependent on Asia Pacific glass producers) Ability to serv
Slide 3: Considerable Developments Achieved to Date
Considerable Developments Achieved to Date ✓ Secured and delineated a wholly-owned silica sand resource of 7.25 million tonnes (inferred resource) = 50+ years of supply ✓ Conducted geochemical analysis of sand resource confirming appropriate purity and low-iron characteristics required for solar gla
Slide 4: Solar Glass is a Critical Component of Solar Panels
Solar Glass is a Critical Component of Solar Panels Patterned solar glass: • Maximizes light transmittance • Protects solar panel from elements Balance of Solar Glass System 20%-35% 10 - 20% Average solar panel cost breakdown Cell Manufacturing 20%-30% Polysilicon 20% - 40% 4 Source: NREL 2021 H1 So
Slide 5: Significant North American Market Growth
Significant North American Market Growth 1. Annual solar panel installations are expected to grow >20% annually: • Solar energy is now cost competitive with traditional sources of energy 2. Domestic solar panel manufacturing expected to grow >500% over the next 8 years: • A resurgence of domestic pa
Slide 6: Current Dependence on Asia-Pacific Suppliers
Current Dependence on Asia-Pacific Suppliers Asia-Pacific Supply Issues: • Unpredictable costs • Volatile tariff environment • Insecure logistics • High carbon intensity CPS Glass Facility Imports: Glass, components and fully assembled solar panels North American Solar Panel Domestic solar panel man
Slide 7: Strategically Located and Vertically Integrated
Strategically Located and Vertically Integrated Integration of sand resource with value-added manufacturing offers significant benefits Sand Resource Solar Glass Facility ✓ Close to sand resource ✓ Rare low-iron silica resource MANITOBA ✓ Low-cost hydro-electric power ✓ Abundant supply of 50+ ✓ Desi
Slide 8: Glass Plant Site
Glass Plant Site Option to purchase agreement signed for 121 acres of land zoned for heavy industrial purposes: • Proximity to Manitoba Hydro 115kV power line, enabling access to renewable hydro-electric energy • Pipeline access to wastewater plant, enabling use of high-quality recycled water • Acce
Slide 9: Community Impact and Sustainable Development
Community Impact and Sustainable Development Positive Community Impact • Participation agreements with Hollow Water First Nation and Community of Seymourville • Local employment opportunities for nearby communities • 600+ jobs during construction phase, • 300 jobs for glass manufacturing operations,
Slide 10: Long Term Cost Advantage
Long Term Cost Advantage 100 90 >30% cost advantage Relative Cost Basis* 80 Logistics 70 • Significantly lower logistics cost due to 60 Logistics proximity to customers Coating and 50 Packaging Other Raw Coating and • Lower cost supply of domestic soda ash 40 Materials Packaging Other Raw Soda Ash M
Slide 11: Low-Carbon Manufacturing
Low-Carbon Manufacturing CPS will set a new standard for low-carbon manufacturing: • Hydro-electric power • Integration and proximity of solar spec sand resource • Proximity to customers GLASS MANUFACTURING EMISSIONS INTENSITY 1.00 (Scope 1 & 2 Analysis + Logistics Emissions) TONNES OF C02e PER TONE
Slide 12: Attractive FEED Study Economics
Attractive FEED Study Economics ● Phase 1 annual production of 20 million m2 (equivalent to 4GW solar panel manufacturing demand) ● Gross margins are expected to exceed 50% using industry price forecasts ● Phase 1 pre-tax IRR is predicted to exceed 25% and generate a pre-tax NPV10 of +C$800 million*
Slide 13: Near-Term Value Creation Through Project Development
Near-Term Value Creation Through Project Development ❑ Environmental license for Q1 2023 manufacturing facility (Q1 2023) Shovel-Ready Status De-risked Project • Attractive project ❑ Secure offtake economics confirmed by agreements (Q4 2022) capital and operating cost certainty Value ❑ Environmental
Slide 14: Corporate Overview
Corporate Overview 7% Capitalization Current 39% 27% Share price (November 2, 2022) ($/share) $0.40 Common shares outstanding (MM) 78 Market capitalization (basic) ($MM) $31.2 Net cash outstanding 27% Cash and equivalents ($MM) $10.0 Management & Directors Less: 12.0% convertible debentures due Febr
Slide 15: Summary
Summary • Unprecedented growth in solar panel manufacturing of >500% is expected to drive North Significant Solar Glass American solar glass demand over the next decade Demand Growth • Patterned solar glass is a critical component of solar panel manufacturing Large North American • Currently, there
Slide 16: Disclaimer
Disclaimer General This corporate presentation dated July 2022 (the "Presentation") has been prepared by Canadian Premium Sand Inc. ("CPS" or the "Company"), and is based on public information of CPS. This Presentation is for information purposes only and is being made available by CPS to provide in
Slide 17: Disclaimer (Cont'd)
Disclaimer (Cont’d) Market, Independent Third Party and Industry Data Certain market, independent third-party and industry data contained in this Presentation is based upon information from government or other independent industry publications and reports or based on estimates derived from such publ
Canadian Premium Sand — Investor Presentation (November 2022) on 6ix