Manila Electric Co. · PSE:MER
Manila Electric — Download (2.37 MB)
21 slides from Manila Electric's investor presentation, Feb 22, 2022
Slide 1: Meralco Webinar on the Anti-Obstruction of Power Lines Act
© CD: OW MERALCO WEBINAR ON THE ANTI-OBSTRUCTION OF POWER LINES ACT FEBRUARY 22, 2022 | 2:00 PM
Slide 2: Anti-Obstruction of Power Lines Act
2) ANTI-OBSTRUCTION OF POWER LINES ACT © Policy and Intent of the Act Prohibited Acts and Penalties & Rights and Obligations of the Power Line Operator ©) Rights and Obligations of Property Owners (I) MERALCO |= ———
Slide 3: Policy and Intent of the Act
© -GD- OW POLICY AND INTENT OF THE ACT © Ensure uninterrupted conveyance of electricity. ©Protect the integrity and reliability of our power systems. ©By keeping the /and beneath, the air spaces surrounding, and the area traversed by power lines CLEAR OF DANGEROUS OBSTRUCTIONS. (2) MERALCO
Slide 4: Important Terms: Dangerous Structure or Building
Sep 202] | LOCAL GOVERNMENT AND Important Terms: 5 Tan Dangerous Structure or Building 01 Unsafe Structure 04 Constitute a hazard to safety, health, or public welfare. SPECIAL PROJECTS (LGSP. 02 Constitute a fire hazard. 05 Contribute to the pollution of the site or community to an intolerable degre
Slide 5: Important Terms: Hazardous Activities
OW (7) MERALCO. ——— © 8 Important Terms: Hazardous Activities 01 02 03 Burning of waste Excavation Quarrying and other materials 04 05 Construction Other activities of the same nature and character which threaten or endanger the continuous conveyance of electricity Sep 2021 | LOCAL GOVERNMENT AND SP
Slide 6: Important Terms: Hazardous Improvements
OW (2) MERALCO @ Important Terms: Hazardous Improvements Structures located bre threaten the continuous conveyance of electricity
Slide 7: Power Line Corridor definition
The land beneath, the air spaces surrounding, and the area traversed by power lines, which shall be kept clear and free from any power line obstructions, dangerous structures, hazardous activities and improvements and other similar circumstances in accordance with the provisions of the Act. 8
Slide 8: Important Terms: Power Line Corridor (PLC)
© 8 Important Terms: Power Line Corridor (PLC) DM ete, Se aie & potoay pens, Boe apt oe? When) ep meet She Se eee aah Sep 2021 | LOCAL GOVERNMENT AND SPECIAL PROJECTS (LGSP) NOW (2) MERALCO. §=———
Slide 9: Power Line Obstruction definition
Any hazardous activity or hazardous improvement and other similar circumstances that threaten the continuous conveyance of electricity 10
Slide 10: Prohibited acts: tall growing plants and hazardous activities
• Plant or cause to be planted Tall Growing Plants (potential to grow more than 3 meters) within the PLC • Conduct any hazardous activities within the PLC 11
Slide 11: Prohibited acts: preventing entry
• Prevent or refuse agents of the Power Line Owner/Operator entry. • Perform other analogous acts 12
Slide 12: Penalties for Commission of Prohibited Acts
© PENALTIES FOR COMMISSION OF PROHIBITED ACTS PENALTIES FOR VIOLATING THE LAW: 1st OFFENSE ind OFFENSE 3rd OFFENSE up to 6 months up to 6 years up to 12 years imprisonment, imprisonment, imprisonment, P50,000 fine, P100,000 fine, P200,000 fine, or both or both or both Sep 2021 | LOCAL GOVERNMENT AND
Slide 13: Rights of the Power Line Operator
To enter said To prevent and remove Conduct maintenance property any obstruction within and inspection activities the PLC within the PLC Conduct repair Conduct clearing activities or restoration activities for tall growing plants within the PLC within the PLC without securing prior permit from the g
Slide 14: Rights of the Power Line Operator: improvements
Remove hazardous improvements Prevent or prohibit without securing prior permit from hazardous activities the government or the LGU but with due notice Perform other analogous acts to prevent and remove any obstruction inside and near the PLC 15
Slide 15: Obligations of Property Owners
GD: OW OBLIGATIONS OF PROPERTY OWNERS Sec. 6 of the Act. obstructions. Y¥ Coordinate with, COORDINATION (2) MERALCO prohibited acts mentioned in NX oe, ot any of the power line assist, and and 16
Slide 16: Rights of Property Owners
✓ Right to be given due notice before entry to the property. ✓ Right to be informed, educated and given technical assistance by the PLO with regard to preventing power line obstructions 17
Slide 17: Notice Requirement
© ~CD NOW Notice Requirement (Letter Head/Name of Power Line Operator) NOTICE MERALCO Pasay BC NOTICE TO: _ DENRIPCA and LGU and other concerned government agencies FOR : Cutting/Pruning/Trimming of Tall Growing Plants/Coconut Tree/s ‘FOR: Cutting Pruntag/Trimaung of Fal Growing PlantwCoconat Teh om
Slide 18: Notice to Property Owners
(2) MERALCO.§=——— NOTICE TO PROPERTY OWNERS mexeico ate] [Name of Property Owne:/HHomeowners Association Address (House No /Steet/Suba/Srgy/Municpatty/Chy) ‘subject: tice Prior to me Conduct ot Trimming, Pruning, Cutting or clearing of Tal Growing Pants Ander Removal, Dismartle or Demoftion of Hazar
Slide 19: Building Permit
OD- BUILDING PERMIT * Building officials shall require building owners who will construct or conduct maintenance activities on the PLC to notify and coordinate with PLO * Failure of building official to do so will result in penalty ONE DEGREE HIGHER than penalty provided under the Act and shall suff
Slide 20: Rule VIII of IRR: Assistance from the LGU
© RULE VIII OF IRR: ASSISTANCE FROM THE LGU (2) MERALCO ¥ Inform and educate respective constituents about the policies and implementation of this Act and its IRRs v Provide all other means to assist PLOs to properly and safely perform their duties and mandates )VERNMENT AND SPECIAL PROJECTS 21
Slide 21: Thank You!
THANK YOU!
Manila Electric Company (Meralco) — Download (2.37 MB) on 6ix